Appendix G - Acid Sulfate Soil
Construction Stage
Environmental Procedures
Commercial Development
Eenie Creek Road.

 

Revision No: 000

October 2006

4of4

 

 

B5.

B6.

INSPECTION AND MONITORING

The results of the following activities are to be recorded.

 

 

 

 

 

 

 

 

 

 

 

Activity Frequency Responsibility
1. Maintain regular photographic record of site | Daily Construction
development works associated with PASS soil Manager

movements.

2. Maintain records tracking of soil movements | As required Construction
around the site including diagrams, volumes and Manager
soil descriptions for stockpiles in temporary storage
areas as well as final placement sites.

3. Inspect the condition of stockpile batters, drains, | Weekly or Construction
open trenches and structure excavations. following Manager

rainfall

4. Maintain record of lime dosing rates. Per dose Construction

Manager
5. Field testing of ground water in accordance with | Weekly Construction
Appendix A Section A4 and AS. Manager
PERFORMANCE INDICATORS
Item Performance Indicator
1. Soil pH No obvious drop in localized soil pH levels associated with

excavations into natural soils. Compare results to Golder’s
preliminary ASS Assessment for the site dated July 2006.

 

 

 

 

 

 

2. Verify lime Verify the effectiveness of lime treatment of PASS using the
treatment SPOCAS suit or Chromium suit method at a rate of 1 test per
250 m? of treated soil.
3. Water and Refer Appendix B.
groundwater
4, Photo record No obvious degeneration of the aesthetic value of the open-
space that may be possibly attributed to acid leachate.
5, Non All non conformances are reported to the Construction Manager
conformance and rectified as soon as is practical.

 

 

Golder Associates

06683025-3000(AA)

 

 

Used in these records

About this file

File size
10.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Application part 3 [As Published].pdf · 10.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.