Skip to the record
Every meeting, every word.

Council archive · source document

Application part 3 [As Published] · 142007.1242

of 137

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (10.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.

 

Operational Environmental 96683025-4000(AA)
Management Plan October 2006

Commercial Development

Rev: 000 Page 5S
Eenie Creek Road

 

 

 

 

 

6.0 MONITORING AND INSPECTION

Environmental inspections will be carried out by means of a quarterly meeting of responsible
personnel and a site walk through. This will be used to identify any areas of non-
conformance or opportunities for improvement. Any non-conformances will be reviewed at
the quarterly meeting.

Monitoring is to be documented as outlined in Section 11.2 and monitoring programs will be
modified based on the findings of site inspections and/or results of testing.

8.0 NON CONFORMANCE

Any non-conformance to the OP-EMP must be addressed as soon as is practicable. The
personnel responsible for the non-conformance must be notified immediately for purposes of
issuing rectification instructions.

Non-conformances are formally documented through an audit report (Refer Section 11.3).

9.0 AUDITING OF THE EMP

9.1 Responsibilities

The daily activities at the development will be audited for compliance with the OP-EMP and
its procedures by the environmental auditor. The environmental auditor will be appointed by
the land owner.

It is the environmental auditor’s responsibility to:

1. Provide an independent assessment of compliance with the Environmental
Procedures in Appendices A and B.

2. Report on observed activities that have, or may cause, an impact to the environment
or non-conformance to regulation.

3. Provide recommendations to the land owner regarding practical initiatives that can be
employed to improve the effectiveness of environmental management at the
development site.

4. Provide a copy of the Environmental Audit Report to the land owner.

Golder Associates

Used in these records

About this file

File size
10.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Application part 3 [As Published].pdf · 10.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.