Council archive · source document
Application part 3 [As Published] · 142007.1242
Very large file (10.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Operational Environmental 96683025-4000(AA) Management Plan October 2006 Commercial Development Eenie Creek Road Rev: 000 Page7 11.3. Environmental Audit Report The Land Owner will appoint an independent auditor to carry out audits of the implementation of the OP-EMP. A copy of the environmental audit report shall be provided to the Land Owner. 11.4 Concerns Register Complaints will be directed to the land owner who will issue the concern to the appropriate personnel for action. A hard copy record of all concerns will be kept at the Site office and filed for future reference, if required. (Form 1). The concems register will record the following information: 1. Details: Name, address and phone number. 2. Nature of concern: Detail of issue, date of incident, people involved, and location. 3. Action taken or required: Any action proposed or undertaken to address the concern, including time and date. 4. Response to Action: Was the complainant satisfied with the outcome of the actions taken, if not, what else needs to be done, or is it outside the scope of the development works. 5. Prevention or re-occurrence: What action has been taken by the nominated responsible person to ensure the problem will not re-occur. 11.5 Rectification Requests and Instructions Non-conformances will be documented on the Inspection and Monitoring Form. The form states the nature of the non-conformance and the mechanisms implemented to rectify the problem. A copy of this form shall be undertaken by the Land Owner on a quarterly basis, immediately in the case of emergencies, or significant non-conformance. 13.0 ENVIRONMENTAL LEGISLATION The construction activities must conform to the relevant Environmental Protection Policies and environmental regulations promulgated under the Environmental Protection Act 1994. A brief discussion of the key elements of each of the Acts and the relevant aspects of the Environmental Protection Policies is provided in the following sections. Golder Associates
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Application part 3 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 10.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.