Skip to the record
The only place to find full transcripts.

Council archive · source document

Application part 3 [As Published] · 142007.1242

of 137

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (10.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.

 

Operational Environmental 06683025-4000(AA)
Management Plan October 2006
Commercial Development

Rev: 000 Page?
Eenie Creek Road

 

 

 

 

 

14.0 OVERVIEW OF ENVIRONMENTAL ISSUES

This section provides a brief overview of environmental issues associated with the
construction of the proposed unit development.

14.4 Water Quality

During rainfall events, uncontrolled runoff leaving the site could potentially cause turbid
water to enter the stormwater system. Solid waste and soil stockpiles, unvegetated and
unsealed carparks, concrete wastes and fertilisers are some sources with the potential to
contaminate surface water. The water quality monitoring program for the development is
contained in Appendix - B Water Quality Management. Performance criteria for surface
water exiting the site have been established using the Australian and New Zealand Guidelines
for Fresh and Marine Water Quality 2000 for a “fresh” receiving environment.

14.5 Solid Waste

Solid wastes will be produced from a range of waste streams. Waste management practices
will be to achieve, where possible, the adoption of the following waste management
hierarchy:

¢ Waste Avoidance;

e Waste Reuse;
e¢ Waste Recycling;
e Energy Recovery From Waste; and

e¢ Waste Disposal.

14.5.1 Storage and Disposal of Waste

Wastes would be sorted by type with each individuals being responsible for ensuring that
wastes are placed in the appropriate bin or disposal location. Bins would be colour coded or
labelled according to the type of waste to be deposited with clear signage on each bin. Bins
would be provided where appropriate depending on the stage of the development.

In keeping with the waste hierarchy, the first step in the waste management process would
involve reducing the production of wastes through efficient planning of resources. Secondly,
those wastes produced would be reused on the site where possible. Where reuse is not
possible the waste would be recycled via the colour coded bins/skips. For non-recycled
wastes energy recovery methods would be employed before final disposal to landfill.

Golder Associates

Used in these records

About this file

File size
10.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Application part 3 [As Published].pdf · 10.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.