Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

Application part 3 [As Published] · 142007.1242

of 137

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (10.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.

 

 

Appendix B — Water Quality
Environmental Procedures
Commercial Development
Eenie Creek Road.

 

 

 

 

 

Bi.

B2.

B3..

B4.

B5.

ENVIRONMENTAL VALUES

The protection of surrounding surface water and groundwater.

OBJECTIVES

Control potential sources of contaminated stormwater.

PON>

Comply with the Environmental Protection (Water) Po.
local laws, codes and policies.

a

Limit environmental impact on adjacent residential and commercial premises.

Manage all discharges of water from the construction site.

licy 1997, and NSC

Use the Australian and New Zealand Guidelines for Fresh and Marine Water

Quality 2000 for the protection of environmental values.

"ENVIRONMENTAL CONTROL MEASURES

The following provides a list of the environmental control measures for

management of surface and ground waters at the site.

 

Environmental Control Measure.

Responsibility |

 

1. All stormwater will be managed in  gecordance with the
stormwater treatment Appendix C.

 

 

Construction Manager

 

 

INSPECTION AND MONITORING.

The following inspection and monitoring program will be conducted at the site.

 

Activity:* : vO, . ‘Frequency

Responsibility

 

1. Inspect disturbed areas for signs of land e Quarterly

 

 

tainfall event*.

Construction

erosion or deterioration. e After each major Manager

 

 

*> 25mm within a 24 hour period.

PERFORMANCE INDICATORS -

 

 

 

 

 

Item < - Performance Indicator
1. Surface Water All control systems are maintained in good working order.
Control System Surface water is separated from disturbed and undisturbed
areas.
2. Non conformance | All non-conformances are reported and rectified.

 

 

 

Golder Associates 06683025- 3000(AB)

 

Used in these records

About this file

File size
10.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Application part 3 [As Published].pdf · 10.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.