Site Rehabilitation Plan

 

3.
3.1

3.1.1

3.1.2

3.1.3

3.1.3

3.1.4

3.2

3.2.1

REVEGETATION STRATEGY

Introduction

Portions of vegetated areas within OS2 and OS4 are suffering from structural
deficiencies, and/or biodiversity deficiencies and/or habitat deficiencies.
These areas should be revegetated with reinforcement plantings.

Within disturbed areas, competition between native propagules and exotic
weeds often favours the exotic pioneering. Thus, in order to enhance the
ecological functioning of areas degraded by exotic species, revegetation works
will provide a framework by which indigenous species may reclaim lost habitat
via the processes of natural recruitment and succession. Therefore, the aim of
the revegetation works is to restore the historical ecological values of the site
through the use of weed removal techniques and the provision of indigenous
canopy species.

OS3 and O56 areas are to be planted with locally endemic tree species.

Wetland areas should be revegetated using locally endemic species so that they
become viable and efficient systems in terms of stormwater management, as
well as self-sustaining ecosystems.

Revegetation will commence during the development phase or as soon as
possible after development approval and when the area has been designated as
suitable for revegetation.

Personnel, Procedures and Timing

Revegetation Phases

Site revegetation works within all revegetation areas will be undertaken in five (5)
phases, these are:

Phase 1: Site preparation;

Phase 2: Initial planting;

Phase 3: Growth and maintenance;

Phase 4: Supplementary planting to replace dead seedlings;
Phase 5: Additional plantings; and

Phase 6: Ongoing maintenance.

It is envisaged that all capital works associated with the proposed development will be
completed within three (3) years of the development approval.

 

Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 11

Used in these records

About this file

File size
10.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Application part 3 [As Published].pdf · 10.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.