a2
9 eee

Site Rehabilitation Plan

 

4, MONITORING
4.1 Introduction

Site management will inspect the revegetation zones before planting commences to
ensure suitable preparation. Site management will also check that the proposed
planting and revegetation works satisfy the aims and methods of this Plan.

After planting, and revegetation works, the following is required from the
Revegetation Team:

e General maintenance of the revegetation areas (including the health of
seedlings) on a monthly basis for a period of three (3) years.

e Removal of weed regrowth and replacement of dead seedlings on a monthly
basis for a period of three (3) years.

The revegetation areas are to be formally inspected by the Revegetation Team at the
following points of establishment:

Immediately after the revegetation works;

Three (3) months after the revegetation works;
Six (6) months after the revegetation works;
Twelve (12) months after the revegetation works;
Two (2) years after the revegetation works; and
Three (3) years after the revegetation works.

Inspections will assess the health of the seedlings (growth rates, foliage status and
survival rates) within revegetation areas to ensure that maintenance of planted
individuals has occurred. Within both regeneration and revegetation areas, weed
abundance, chemical usage, any significant problems are to be monitored. The
Revegetation Team will report to site management within fourteen (14) days from
each inspection period.

Three (3) years after revegetation works, site management will determine if the
stated objectives of this management plan have been achieved. If not, a report will
need to be prepared by site management identifying the works and the time frames
required to ensure that the Site Revegetation Strategy meets the stated objectives
and that, most importantly, a self sustaining population is established within
revegetation areas.

 

Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 16

Used in these records

About this file

File size
10.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Application part 3 [As Published].pdf · 10.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.