STORMWATER MANAGEMENT PLAN 4

4.0 Site Stormwater Modelling

4.1 Methodology

The hydrology and hydraulics of the pre and post development scenarios were analysed using
the XP-STORM stormwater management model with storm patterns derived from Australian

Rainfall and Runoff publication and rainfall intensities derived for the Noosa area.

Due to the topography of the land and the layout of the site, it was determined that the site of
the proposed development has an external upstream catchment of approximately 5.5 ha. This
catchment consists of adjacent commercial/industrial properties whose stormwater should not
discharge onto the subject site. However allowances will be made for any flow onto the site,
and catch drains could be utilised to direct this flow away from any future construction on the
subject site. Therefore to conform to the pre-developed drainage scenario it is proposed to also
discharge post developed flows to the south. It is proposed to utilise five separate discharge
points into the environmental drainage area to reduce the extent of construction of stormwater
infrastructure required on the site. The five “sub-catchments” consist of lots 1, 2a, 2b, lot 3,
and lot 4. This split up of discharges is due largely to the topography and proposed layout of
the site.

To accurately determine pre and post development flows, | in 2, 10, and 100 year storms were
modelled. For each storm intensity, storm durations of 10, 20, 30 ,45, 60, 75, 90 and 180

minutes were investigated.

4.2 Selection of Modelling Parameters

XP-STORM modelling parameters were assessed from layout drawings, contours, QUDM
(Queensland Urban Drainage Manual) and considering the extent of proposed development

within the catchment.

4.2.1 Impervious Areas

In accordance with the current pre-developed situation, 0% of impervious ground area was
used in the pre-developed model. In the post developed model the percent of impervious

‘ound area was increased to 90% to represent a commercial development.
gr Pp

 

BARLOW GREGG VDM M3048
APRIL 2007

Used in these records

About this file

File size
10.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Application part 3 [As Published].pdf · 10.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.