Council archive · source document
Application part 3 [As Published] · 142007.1242
Very large file (10.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
STORMWATER MANAGEMENT PLAN 4 4.0 Site Stormwater Modelling 4.1 Methodology The hydrology and hydraulics of the pre and post development scenarios were analysed using the XP-STORM stormwater management model with storm patterns derived from Australian Rainfall and Runoff publication and rainfall intensities derived for the Noosa area. Due to the topography of the land and the layout of the site, it was determined that the site of the proposed development has an external upstream catchment of approximately 5.5 ha. This catchment consists of adjacent commercial/industrial properties whose stormwater should not discharge onto the subject site. However allowances will be made for any flow onto the site, and catch drains could be utilised to direct this flow away from any future construction on the subject site. Therefore to conform to the pre-developed drainage scenario it is proposed to also discharge post developed flows to the south. It is proposed to utilise five separate discharge points into the environmental drainage area to reduce the extent of construction of stormwater infrastructure required on the site. The five “sub-catchments” consist of lots 1, 2a, 2b, lot 3, and lot 4. This split up of discharges is due largely to the topography and proposed layout of the site. To accurately determine pre and post development flows, | in 2, 10, and 100 year storms were modelled. For each storm intensity, storm durations of 10, 20, 30 ,45, 60, 75, 90 and 180 minutes were investigated. 4.2 Selection of Modelling Parameters XP-STORM modelling parameters were assessed from layout drawings, contours, QUDM (Queensland Urban Drainage Manual) and considering the extent of proposed development within the catchment. 4.2.1 Impervious Areas In accordance with the current pre-developed situation, 0% of impervious ground area was used in the pre-developed model. In the post developed model the percent of impervious ‘ound area was increased to 90% to represent a commercial development. gr Pp BARLOW GREGG VDM M3048 APRIL 2007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Application part 3 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 10.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.