Council archive · source document
Application part 3 [As Published] · 142007.1242
Very large file (10.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
STORMWATER MANAGEMENT PLAN 6 5.0 Pre-Development Flows 5.1 Rationale The proposed site is currently undeveloped, and therefore an impervious area of 0% was used. As the majority of the site contains no identifiable watercourses of concentrated overland flow, it is assumed that the pre development overland flow occurs as sheet flow. The pre- development model was set up so as that the stormwater runoff will drain to the southern environmental drainage area of the site. The peak flows for the pre development conditions were derived using a conservative method by utilising only the XP-STORM model hydrologic runoff layer. A node layout plan for the pre development scenario is included in Appendix B. 5.2 Results The peak flows for the pre development conditions are indicated in Table 5.1. These results are for the catchment of proposed lots 1-2. Table 5,1; Pre development Peak Flows ARI Design Storm (min) | Peak Flow (m?/s) 2 60 | 131 10 60 2.44 100 60 3.75 XP-STORM pre development model output is included in Appendix B for ARI 2, 10, and 100 year storms. BARLOW GREGG VDM M3048 APRIL 2007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Application part 3 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 10.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.