Skip to the record
Every meeting, every word.

Council archive · source document

Application part 3 [As Published] · 142007.1242

of 137

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (10.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.

 

Site Rehabilitation Plan

 

The vegetation within the site is composed of predominantly Swamp mahogany
(Eucalyptus robusta) and Broad-leaved paperbark (Melaleuca quinquenervia) in the
southern portion and Flooded gum (E. grandis) and Red mahogany (E. resinifera) occur
in the northern portion. Much of the vegetation within the site was cleared during the
1970’s and subsequent regrowth vegetation has been subject to frequent fire events.
An aerial photograph depicting vegetation coverage is presented in FIGURE 2.

A child-care centre and other associated built infrastructure occurs within the
northern portion of the site. In addition, numerous vehicle tracks occur throughout the
site.

The approved layout plan for the Subject site is shown in FIGURE 3.

1.3 Open Space Designations

Vegetation will be retained within Open Space Areas in accordance with the Open
Space Management Plan (OSMP) (JWA 2007) as follows:

Open Space (Conservation and Waterway Protection):

The OS2 (Conservation and Waterway Protection) area is to be retained in a near-
natural state, therefore limited infrastructure is required within this area. Some
clearing of vegetation may be required for fire trails/breaks. Public access to Eenie
Creek will not be encouraged. Walking tracks and jetties will not be constructed.
Playground and picnic facilities, rubbish bins and other facilities associated with
recreational parkland will not be provided.

Vehicle access will be kept to a minimum and limited to fire and emergency vehicles
and Council maintenance vehicles, All unnecessary existing tracks and trails witl be
closed off and rehabilitated and vehicle access points will be limited to as few as
possible.

The Fire Management Plan (JWA 2007) recommends that a fire break be created within
this area to provide access for fire fighting vehicles and to ensure compliance with
bushfire management objectives. This fire break will have a minimum width of ten
(10) metres, which will involve the clearing of all vegetation. Other fire breaks will be
created within this Open Space area, however these will require the clearing of
vegetation to a four (4) metre width. The location of all fire breaks will take into
account the requirement to retain habitat trees, where possible.

Open Space (Preservation of Visual Amenity):

 

The Open Space: 083 and OS6 areas will be retained primarily for screening purposes.
Proposed works within these areas shall be limited to minimal landscaping and
supplementary plantings of endemic species. Adjacent infrastructure such as
footpaths, lighting and signage and stormwater control devices/measures may be

 

Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 4

Used in these records

About this file

File size
10.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Application part 3 [As Published].pdf · 10.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.