Council archive · source document
Application part 3 [As Published] · 142007.1242
Very large file (10.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Site Rehabilitation Plan The vegetation within the site is composed of predominantly Swamp mahogany (Eucalyptus robusta) and Broad-leaved paperbark (Melaleuca quinquenervia) in the southern portion and Flooded gum (E. grandis) and Red mahogany (E. resinifera) occur in the northern portion. Much of the vegetation within the site was cleared during the 1970’s and subsequent regrowth vegetation has been subject to frequent fire events. An aerial photograph depicting vegetation coverage is presented in FIGURE 2. A child-care centre and other associated built infrastructure occurs within the northern portion of the site. In addition, numerous vehicle tracks occur throughout the site. The approved layout plan for the Subject site is shown in FIGURE 3. 1.3 Open Space Designations Vegetation will be retained within Open Space Areas in accordance with the Open Space Management Plan (OSMP) (JWA 2007) as follows: Open Space (Conservation and Waterway Protection): The OS2 (Conservation and Waterway Protection) area is to be retained in a near- natural state, therefore limited infrastructure is required within this area. Some clearing of vegetation may be required for fire trails/breaks. Public access to Eenie Creek will not be encouraged. Walking tracks and jetties will not be constructed. Playground and picnic facilities, rubbish bins and other facilities associated with recreational parkland will not be provided. Vehicle access will be kept to a minimum and limited to fire and emergency vehicles and Council maintenance vehicles, All unnecessary existing tracks and trails witl be closed off and rehabilitated and vehicle access points will be limited to as few as possible. The Fire Management Plan (JWA 2007) recommends that a fire break be created within this area to provide access for fire fighting vehicles and to ensure compliance with bushfire management objectives. This fire break will have a minimum width of ten (10) metres, which will involve the clearing of all vegetation. Other fire breaks will be created within this Open Space area, however these will require the clearing of vegetation to a four (4) metre width. The location of all fire breaks will take into account the requirement to retain habitat trees, where possible. Open Space (Preservation of Visual Amenity): The Open Space: 083 and OS6 areas will be retained primarily for screening purposes. Proposed works within these areas shall be limited to minimal landscaping and supplementary plantings of endemic species. Adjacent infrastructure such as footpaths, lighting and signage and stormwater control devices/measures may be Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Application part 3 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 10.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.