Skip to the record
Every meeting, every word.

Council archive · source document

Application part 3 [As Published] · 142007.1242

of 137

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (10.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.

STORMWATER QUALITY MANAGEMENT PLAN 4

2.0 Pollutant Export Modelling

As previously mentioned the MUSIC modelling software was utilised to predict performance
characteristics of the proposed water treatment train. Modelling parameters were set up in
accordance with Brisbane City Council's recommendations as specified in “Guidelines for
Export Pollutant Modelling in Brisbane Version 7” (October 2003). The node layout of the

music model is provided in appendix C.

2.1 — Water Quality Objectives

This model uses the water quality objectives set out by Noosa Shire Council. A

summary of the key indicator standards is set out below in table 2.1.

Table 2.1: Noosa Shire Council Water Quality Objectives

 

 

 

 

 

 

Indicator Value
Total Suspended Solids 15 mg/L
Total Phosphorus 0.05 mg/L
Total Nitrogen 0.5 mg/L

 

 

2.2 — Treatment Nodes

The recommended BCC values for commercial source nodes have been used in
MUSIC to generate predicted pollutant loads from the site. The following devices have

been used in the treatment train to reduce these pollutant loads to an acceptable level.

« Gross Pollutant Traps - The model has used a GPT for each individual lot before
tunoff is discharged into swales. The locations of these GPT's is shown in
Appendix B. These GPT's were modelled to remove 90% of gross pollutants for up
to a Q3 month ARI storm. The GPT's to treat runoff from lots will be installed

when construction on that lot commences.

+ Vegetated Swales — Runoff passes through vegetated channels as detailed on the
accompanying engineering drawings. As the majority of stormwater infrastructure
proposed for the site is of open channel construction, vegetated drainage channels
will be used extensively throughout the site. The typical width of these channels is

3 metres.

 

BARLOW GREGG VDM 3048
APRIL 2007

Used in these records

About this file

File size
10.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Application part 3 [As Published].pdf · 10.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.