Council archive · source document
Application part 3 [As Published] · 142007.1242
Very large file (10.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Construction Environmental 06683025-3000(AA) Management Plan October 2006 Commercial Development . Rev: 000 Page3 Eenie Creek Road, Noosaville 1.0 INTRODUCTION This EMP has been prepared in order to manage and minimise the impact on the environment during construction of the commercial development on Lot | on SP182880, Eenie Creek Rd, Noosaville 4566. The location of the site is shown on Figure | (Site Location). 2.0 PROPOSED DEVELOPMENT 2.1 Site Description The real property description of the site is Lot 1 on SP 182880 and covers a total area of approximately 14 hectares. The northern boundary of the site adjoins Eenie creek road with a majority of the property currently covered in vegetation. A number of access tracks exist throughout the site and with a fire trail along the eastern boundary 2.2 Description of Development Plans provided by Barlow Gregg & Associates drawn by Ken Hicks Associates (Drawing No. 060506, 01/06/2006)) show details of the proposed lot reconfiguration. The proposed development consists of the reconfiguration of a lot to form a number of commercial sites as well as dedicating a proportion of the site to parkland. As part of construction during the operational works stage vegetation clearing, road construction, filling, and installation of underground services are to be undertaken. 3.0 OBJECTIVES The objectives of the EMP are to: ¢ Protect life, health and well being of human and other forms of life; e Protect the local amenity; e Base the environmental management of the development in accordance with the principles of Ecologically Sustainable Development (ESD); ¢ Inform staff, contractors and consultants of appropriate safeguards and control measures to be implemented to minimise the environmental impact, e Comply with relevant statutory environmental requirements, * Provide strategies aimed at minimising environmental harm during the construction stage; and e Provide an Environmental Management System, generally based on the key elements of the AS/NZS ISO 14001-1996 Environmental Management Systems — Specification with Guidance for use. A copy of the EMP and associated forms and registers will be kept at the site office during the construction stage of the development. Golder Associates
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Application part 3 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 10.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.