Skip to the record
Every meeting, every word.

Council archive · source document

Application part 3 [As Published] · 142007.1242

of 137

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (10.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.

 

Construction Environmental 06683025-3000(AA)
Management Plan October 2006
Commercial Development

. Rev: 000 Page3
Eenie Creek Road, Noosaville

 

 

 

 

 

1.0 INTRODUCTION

This EMP has been prepared in order to manage and minimise the impact on the environment
during construction of the commercial development on Lot | on SP182880, Eenie Creek Rd,
Noosaville 4566. The location of the site is shown on Figure | (Site Location).

2.0 PROPOSED DEVELOPMENT

2.1 Site Description

The real property description of the site is Lot 1 on SP 182880 and covers a total area of
approximately 14 hectares. The northern boundary of the site adjoins Eenie creek road with a
majority of the property currently covered in vegetation. A number of access tracks exist
throughout the site and with a fire trail along the eastern boundary

2.2 Description of Development

Plans provided by Barlow Gregg & Associates drawn by Ken Hicks Associates (Drawing No.
060506, 01/06/2006)) show details of the proposed lot reconfiguration. The proposed
development consists of the reconfiguration of a lot to form a number of commercial sites as
well as dedicating a proportion of the site to parkland. As part of construction during the
operational works stage vegetation clearing, road construction, filling, and installation of
underground services are to be undertaken.

3.0 OBJECTIVES

The objectives of the EMP are to:
¢ Protect life, health and well being of human and other forms of life;
e Protect the local amenity;

e Base the environmental management of the development in accordance with the
principles of Ecologically Sustainable Development (ESD);

¢ Inform staff, contractors and consultants of appropriate safeguards and control measures
to be implemented to minimise the environmental impact,

e Comply with relevant statutory environmental requirements,

* Provide strategies aimed at minimising environmental harm during the construction
stage; and

e Provide an Environmental Management System, generally based on the key elements of
the AS/NZS ISO 14001-1996 Environmental Management Systems — Specification with
Guidance for use.

A copy of the EMP and associated forms and registers will be kept at the site office during

the construction stage of the development.

Golder Associates

Used in these records

About this file

File size
10.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Application part 3 [As Published].pdf · 10.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.