Revision No: 000

Appendix E — Emergency Response
Construction Stage
Environmental Procedures
Commercial Development
Eenie Creek Road.

October 2006

1of 2

 

 

 

E1.

E2.

E3.

E4.

ENVIRONMENTAL VALUE

The protection of life, health and wellbeing of humans and the environment.

OBJECTIVES

Provide a mechanism to address and mitigate the impact of significant
breaches of the environmental procedures, or resulting from unforeseen
hazards.

EMERGENCY RESPONSE PLAN

The following provides a list of potential breaches, respective control measures
and key contacts.

 

 

HAZARD

EMERGENCY ACTION

CONTACT

 

Excessive Dust

Spray offending area with water.

Project Manager

 

Excessive Noise

identify source(s) of noise and stop activity
immediately.

Project Manager

 

Chemical spill onto
soil

Use spill containment equipment to mop up
and contain spill. Conduct complete clean
up of contaminated area and dispose to
landfill as approved by EPA.

Project Manager

 

Chemical spill into
stormwater drain

Identify stormwater exit drain and isolate.
Mop up spill and clean stormwater exit
drain.

Project Manager

 

High sediment loads
in stormwater
exiting from site.

Inspect all active areas of site for signs of
erosion or uncontrotled runoff. Identify
source. Rectify any non conformance.

Project Manager

 

Other

 

 

Contact Project Manager as soon as
possible. Contact the site environmental
consultant for advice if required.
Implement emergency procedure as
advised.

Project Manager

 

 

CONTACT PROCEDURE

 

The Project Manager must be immediately informed of the emergency such that
action can be taken to mitigate any potential impacts. If environmental harm
has occurred, notify Council and the Environmental Protection Agency (as soon
as is practicable at least within 24 hours).

 

Golder Associates 06683025-3000(AA)

Used in these records

About this file

File size
10.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Application part 3 [As Published].pdf · 10.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.