Council archive · source document
Application part 3 [As Published] · 142007.1242
Very large file (10.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
~~ Revision No: 000 Appendix E — Emergency Response Construction Stage Environmental Procedures Commercial Development Eenie Creek Road. October 2006 1of 2 E1. E2. E3. E4. ENVIRONMENTAL VALUE The protection of life, health and wellbeing of humans and the environment. OBJECTIVES Provide a mechanism to address and mitigate the impact of significant breaches of the environmental procedures, or resulting from unforeseen hazards. EMERGENCY RESPONSE PLAN The following provides a list of potential breaches, respective control measures and key contacts. HAZARD EMERGENCY ACTION CONTACT Excessive Dust Spray offending area with water. Project Manager Excessive Noise identify source(s) of noise and stop activity immediately. Project Manager Chemical spill onto soil Use spill containment equipment to mop up and contain spill. Conduct complete clean up of contaminated area and dispose to landfill as approved by EPA. Project Manager Chemical spill into stormwater drain Identify stormwater exit drain and isolate. Mop up spill and clean stormwater exit drain. Project Manager High sediment loads in stormwater exiting from site. Inspect all active areas of site for signs of erosion or uncontrotled runoff. Identify source. Rectify any non conformance. Project Manager Other Contact Project Manager as soon as possible. Contact the site environmental consultant for advice if required. Implement emergency procedure as advised. Project Manager CONTACT PROCEDURE The Project Manager must be immediately informed of the emergency such that action can be taken to mitigate any potential impacts. If environmental harm has occurred, notify Council and the Environmental Protection Agency (as soon as is practicable at least within 24 hours). Golder Associates 06683025-3000(AA)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Application part 3 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 10.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.