Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2206-29385 SPD - Changed referral agency response minor change to development approval

Attached to the e-mail Change to SARA response & approval - MCU19/0001 & MCU19/0001.01.

of 7

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                             2206-29385 SPD



Attachment 3—Changed Advice to the applicant


 General advice
 1.      Terms and phrases used in this document are defined in the Planning Act 2016 its regulation or
         the State Development Assessment Provisions (SDAP) v2.4. If a word remains undefined it has
         its ordinary meaning.
 2.      Transport noise corridor:
         Mandatory Part (MP) 4.4 of the Queensland Development Code (QDC) commenced on 1
         September 2010 and applies to building work for the construction or renovation of a residential
         building in a designated transport noise corridor. MP4.4 seeks to ensure that the habitable
         rooms of Class 1, 2, 3 and 4 buildings located in a transport noise corridor are designed and
         constructed to reduce transport noise. Transport noise corridor means land designated under
         Chapter 8B of the Building Act 1975 as a transport noise corridor. A free online search tool can
         be used to find out whether a property is located in a designated transport noise corridor. This
         tool is available online at:
         http://spp.dsdip.esriaustraliaonline.com.au/geoviewer/map/planmaking. This tool allows
         searches on a registered lot number and/or property address to determine whether and how the
         QDC applies to the land.
 3.      Advertising Devices:
         Advertising devices have the potential to cause unsafe distraction, glare or other nuisance to
         drivers, which affects safety on the sate-controlled road. Any proposed advertising devices are
         to be in accordance with the Department of Transport and Main Roads’ Roadside Advertising
         Manual. Any advertising device at this location:
              must not exceed a maximum luminance of 350cd/m2
              must be placed within the subject site, clear of the state-controlled road reserve
                  (without overhang)
              must not contain a variable message component.

         Further information on the Roadside Advertising Manual can be found at the following link:
         https://www.tmr.qld.gov.au/business-industry/Technical-standards-publications/Roadside-
         advertising-manual
 4.      Road access works approval:
         Under section 33 of the Transport Infrastructure Act 1994, written approval is required from the
         Department of Transport and Main Roads to carry out road works that are road access works
         (including driveways) on a state-controlled road. Please contact the Department of Transport
         and Main Roads on [email protected] to make an application for road works
         approval. This approval must be obtained prior to commencing any works on the state-
         controlled road reserve. The approval process may require the approval of engineering designs
         of the proposed works, certified by a Registered Professional Engineer of Queensland (RPEQ).
         Please contact the Department of Transport and Main Roads as soon as possible to ensure
         that gaining approval does not delay construction.
 5.      Public utility works and connection approval:
         The applicant is advised that if any works and/or connections are required to public utility
         services within a state-controlled road reserve, approval must be given by the Department of
         Transport and Main Roads under the relevant public utility legislation (electricity, water/sewer,
         telecommunication), and in accordance with the Department of Transport and Main Roads
         technical standards (TN163). Approvals must be obtained prior to commencing any utility works
         within the state-controlled road reserve. Please contact the relevant utility provider or the
         Department of Transport and Main Roads public utility team via
         [email protected] for further information on the application and approval
         process.
 6.      Road corridor permit:
         An application for a Road Corridor Permit (RCP), is required for any ancillary works and
         encroachments on the state-controlled road under section 50(2) and Schedule 6 of the
         Transport Infrastructure Act 1994 and Part 5 and Schedule 1 of the Transport
         Infrastructure (State-Controlled Roads) Regulation 2006.


 State Assessment and Referral Agency                                                            Page 6 of 7
Log in to download the original file

2206-29385 SPD - Changed referral agency response minor change to development approval.pdf · 322 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.