Council archive · source document
Development Application - Part 1 of 2 - IDAS Forms 1 & 6 and checklist 4 · OPW11/0227
SCRC CORRESPONDENCE race twat | _MIIM THIS IS THE NEXT PART OF A MULTIPLE PART RECORD Part_! Of 2. Application number: . T\I&AM\BCS IAM\INFORMATION MANAGEMENT\RECORDS MANAGEMENTIC
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 16 pages
Page 2
Page 3
Integrated Development Assessment System form
IJ
Application Details - IDAS form 1
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
• complete this form (Application details - IDAS form 1)
• complete any other forms relevant to your application
• provide any mandatory supporting information identified on the forms as being required to accompany your
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.
Applicant details (note: the applicant is the person responsible for making the application and need not be the
owner of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is
correct. Any development permit or preliminary approval that may be issued as a consequence of this application will
be issued to the applicant.)
Please note: If there is more than one applicant, provide additional applicant details by clicking the "Add another
applicant" button below.
Name/s (individual or company name in full) CAPE BOUVARD DEVELOPMENTS PTY LTD
For companies, contact name GARY GODFREY
Postal address PO BOX 1923, NOOSA HEADS, QLD, 4567
Contact phone number (07) 5448 0186
Mobile number (non-mandatory) 0417 978 196
Fax number (non-mandatory) (07) 5448 0286
e-mail address (non-mandatory) [email protected]:'-
1. What is the nature of development proposed? (tick all applicable boxes)
q material change of use of premises
q building work
® operational work Developm ent Counter
q reconfiguring a lot
2 8 JUN 2011
Tewantin
Department of Infrastructure and Planning QP1an Queensland
Government
Page 4
qq
2. What type of approval is being sought?
® development permit
q preliminary approval
q both - provide details below
3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?
Z No
q Yes - complete table A and then go to question 5
4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)
Table B - street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises
Lot on plan
Street Address
description
Local government area
Unit Street Street name and official Post Plan type (e.g. Logan,Cairns)
Lot No
No.
No. No. suburb/locality name code and plan no.
SERENITY CLOSE, NOOSA SUNSHINE COAST
1 10 4567 5 SP195871
HEADS REGIONAL COUNCIL
® Street address / lot on plan
Street address / lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
q water e.g. jetty, pontoon)
Table C - premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g.
channel dredging in Moreton Bay)
Coordinates (note: place each set of
coordinates in a separate row) Zone Local government
Datum
reference area ( If app li ca bl e)
Easting Northing Latitude Longitude
q GDA94
q WGS84
1
q other
5. Total area of the premises on which the development is proposed (indicate hectares or m2)
14,560 m2
6. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm, etc.)
1 VACANT LAND
7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.)
PROPOSED 36 RESIDENTIAL UNITS
App' a`.'on De`a s - IDAS form I
Version 1.0 18 December 2009
Page 5
8. Is owner's consent required for this application? (refer to notes at the end of this form for more information)
® No
q Yes - complete either table D, table E or table F as applicable
9. Does the application involve a state resource? (e.g. the application involves state land, or taking quarry
materials. Refer to the notes at the end of this form for more information)
® No q Yes - complete table G
10. Identify if any of the following apply to the premises (tick applicable box/es)
adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) - complete table H
q on strategic port land under the Transport Infrastructure Act 1994 - complete table I
in a tidal water area - complete table J
11. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow,
water, etc.)
q No ® Yes - ensure the type, location and dimension of each easement is included in the plans submitted
12. Does the proposal include new building work or operational work on the premises? (including any
services)
q No ® Yes - ensure the nature, location and dimensions of proposed works are included in plans submitted
13. Is the payment of a portable long service leave levy applicable to this application? (refer to the notes at the
end of this form for more information)
® No - Go to question 15 q Yes
15. Has the local government agreed to apply a superseded planning scheme to this application under
section 96 of the Sustainable Planning Act 2009?
® No
q Yes - provide details below
16. List below all of the forms and supporting information that accompany this application (include all IDAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this
question does not apply for applications made online using Smart eDA)
Method of lodgement to
Description of attachment or title of attachment
assessment manager
1 SEE ATTACHED LETTER
17. Applicant's declaration
® By making this application, I declare that all information in this application is true and correct (note: it is
unlawful to provide false or misleading information).
App`: =' De's - IDAS form 1
Version 1.0 18 December 2009
Page 6
L-'LL
Notes for completing this form
Question 8:
• Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required
for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is
required under section 263, then an application must contain, or be accompanied by, the written consent of the
owner, or include a declaration by the applicant that the owner has given written consent to the making of the
application.
• Owner's consent is not required for a mobile and temporary ERA.
Question 9:
• Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
regulation may require the application to be supported by certain evidence prescribed under the regulation.
Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is
required to be given, and the evidence required, to support the application.
Question 13:
• The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable
long service leave levy is payable.
• The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.
Question 14:
• The portable long service leave levy need not be paid when the application is made, but the Building and
Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
permit is issued.
• Building and Construction Industry Notification and Payment Forms are available from any Queensland post
office or agency, on request from QLeave, or can be completed on the QLeave website at
www.gleave.gld.gov. au. For further information contact QLeave on 1800 803 481 or www.gleave.gld.gov.au.
Privacy -the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a
purpose outside of the IDAS process, except where required by legislation (including the Right to Information Act
2009) or as required by Parliament. This information may be stored in a departmental database. The information
collected will be retained as required by the Public Records Act 2002.
OFFICE USE ONLY
Date received Reference numbers
NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER
Council. I have been engaged as the private certifier for the
To:
building work referred to in this application.
Date of BSA Certification Building
Name
engagement license number classification/s
AppHc^'^n^ L^,a!a^is - IDAS form 1
Version 1.0 18 December 2009
Page 7
1q
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)
Date receipted
QLeave Project Amount form sighted by Name of officer who
Description of the work Date paid
Number paid ($) assessment sighted the form
manager
1
The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This
form and all other required application materials should be sent to your assessment manager and any referral
agencies.
Apph::-^ - Details - IDAS form 1
Version 1.0 18 December 2009
Page 8
I . J --1-1 Integrated Development Assessment System form
n i
Building or operational work assessable
against a planning scheme - IDAS form 6
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
This form must be completed for development applications for building works or operational work assessable against
a planning scheme.
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
• complete Applicant details - IDAS form I
• complete any other forms relevant to your application
• provide any mandatory supporting information identified on the forms as being required to accompany your
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.
This form can also be used for development on strategic portland under the Transport Infrastructure Act 1994.
1. What is the nature of the work that requires assessment against a planning scheme? (tick applicable boxies)
q building work - complete table A Z operational work - complete table B
Table B
What is the nature of the operational work made assessable in the planning scheme? (tick applicable box/es)
q road works q stormwater q water infrastructure
q drainage Works q earthworks q sewerage infrastructure
® landscaping q signage q clearing vegetation under the planning scheme
q other - please specify below
What type of approval is being sought? (if you have indicated multiple works in the above question, please
use an attachment to this form to detail each approval request)
® development permit q preliminary approval q both - specify below
Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
No q Yes - specify the number of lots being created
Development Counter
Are there any current approvals associated with this application? (e.g. material change of use)
2 8 JUN 2011
q No ® Yes - provide details below
aw nTln
Department of Infrastructure and Planning . QPlan Queensland
Government
Page 9
F1
List of approval reference/s Date approved Date approval lapses
1 2005/0699 21-Apr-2011 02-Dec-2014
2. What is the dollar value of the proposed building work? (inc GST, materials and labour) $100,000
Es^_+; 14 ar^d OI-,e!a';ona; v.assessab,'e aga;,_' pla :hemp - IDAS form 6
Version 1.0 18 December 2009
Page 10
3. Confirm the following mandatory supporting information accompanies this application
Confirmation
Method of lodgement
of lodgement
All applications for operational works
site plans drawn to scale which show the following:
• the location and site area of the land to which the application relates
(relevant land)
• the north point
• the boundaries of the relevant land
• the allotment layout showing existing lots, any proposed lots (including
the dimensions of those lots), existing or proposed road reserves, [?confirmed electronic
building envelopes and existing or proposed open space (note:
numbering is required for all lots)
• any existing or proposed easements on the relevant land and their
function
• any access limitation strips
• all existing and proposed roads and access points on the relevant land
a statement about how the proposed development addresses the local
government ' s planning schemes and any other planning documents ./ c onfirmed
relevant to the application
Applications for operational works involving earthworks (filling and excavating)
drawings showing:
• existing and proposed contours
• areas to be cut and filled
• the location and level of any permanent survey marks or reference
stations used as datum for the works confirmed
• the location of any proposed retaining walls on the relevant land and
their height
• the defined flood level (if applicable)
• the defined fill level (if applicable)
Applications for operational works involving roadworks
drawings showing:
• existing and proposed contours
• the centreline or construction line showing chainages, bearings, offsets
if the construction line is not the centreline of the road and all
intersection points
• information for each curve including tangent point chainages and
offsets, curve radii, arc length, tangent length, superelevation (if
applicable) and curve widening (if applicable)
• kerb lines including kerb radii (where not parallel to centreline) and
tangent point changes (where not parallel to centreline)
• edge of pavement where kerb is not constructed confirmed
• position and extent of channelisation
• location and details of all traffic signs, guideposts, guardrail and other
street furniture
• pavement markings including details on raised pavement markers
• catchpit, manhole and pipeline locations
• drainage details (if applicable)
• cross road drainage culverts (if applicable)
• concrete footpaths and cycle paths
• location and details for access points, ramps and invert crossings
• changes in surfacing material
Building and operational work assessable against a pia^r;rna scheme - IDAS form 6
Version 1.0 18 December 2009
Page 11
1qq
Confirmation
Method of lodgement
of lodgement
Applications for operational works involving stormwater drainage
drawings showing:
• existing and proposed contours
• drainage locations, diameters and class of pipe, open drains and
easements
q confirmed
• manhole location, chainage and offset or co-ordinates and inlet and
outlet invert levels
• inlet pit locations, chainage and offset or co-ordinates and invert and
kerb levels
Applications for operational works involving water reticulation
drawings showing:
• kerb lines or edge of pavement where kerb is not constructed
• location and levels of other utility services where affected by water
reticulation works
• pipe diameter, type of pipe and pipe alignment
• water main alignments
q confirmed
• water supply pump station details (if applicable)
• minor reservoir details (if applicable)
• conduits
• location of valves and fire hydrants
• location of house connections (if applicable)
• location of bench marks and reference pegs
Applications for operational works involving sewerage reticulation
drawings showing:
• location of all existing and proposed services
• location of all existing and proposed sewer lines and manhole locations
• location of all house connection branches
• kerb lines or edge of pavement where kerb is not constructed
• chainages
E]confirmed
• design sewer invert levels
• design top of manhole levels
• type of manhole and manhole cover
• pipe diameter, type of pipe and pipe alignment
• location of house connections (if applicable)
• sewer pump station details (if applicable)
Applications for operational works involving street lighting
drawings showing:
• location of all light poles and service conduits
• location of all other cross road conduits
• type of wattage and lighting
confirmed
• any traffic calming devices
• additional plans for roundabouts and major roads (if applicable)
• details of any variations to normal alignment
• details of lighting levels
6J'Iduc a"^ o era:^Gna; l'.o'n as sessah^e aca lnsr a pi annr"g sc!)e. t;r - IDAS fo rm 6
Version 1.0 18 December 2009
Page 12
qqq
Confirmation
Method of lodgement
of lodgement
Applications for operational works involving public utility services
drawings showing:
• any existing light poles and power poles
• any existing underground services qconfirmed
• details of proposed services
• alternation to existing services
Applications for operational works involving landscaping works
drawings showing:
• the location of proposed plant species
• a plant schedule indicating common and botanical names, pot sizes
and numbers of plants
• planting bed preparation details including topsoil depth, subgrade
preparation, mulch type and depth, type of turf, pebble, paving and LJ'nfirmed
garden edge
• the location and type of any existing trees to be retained
• construction details of planter boxes, retaining walls and fences
• the proposed maintenance period
• irrigation system details
Notes for completing this form:
• This form can also be used for development applications for building works or operational works assessable
against the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is
mentioned, take it to mean the land use plan for the airport land.
Privacy -please refer to your assessment manager for further details on the use of information recorded in
this form.
OFFICE USE ONLY
Date Received Reference Numbers
The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and
all other required application materials should be sent to your assessment manager and any referral agencies.
9 sche IDAS form 6
Version 1.0 18 December 2009
Page 13
Integrated Development Assessment System checklist
M EJ
Operational Works - IDAS Checklist 4
(Sustainable Planning Act 2009. version 1.0, 18 December 2009)
This checklist only applies when the development application seeks approval for operational works.
You should complete all questions unless the checklist indicates otherwise.
All planning and development applications require applicants to complete the following:
• Applicant details --IDAS form 1
• any forms or mandatory supporting information identified as forming part of your application.
If you are unsure of any answers to questions, phone or visit your local government, or go to the Department of
Infrastructure and Planning's website, www.dip.gld.gov.au.
The checklist and relevant sections do not need to be completed for applications relating only to building work
requiring assessment against the Building Act 1975.
Part 1 - General questions
1.1 Is the proposed operational work assessable under the planning scheme?
q No
• You must complete Building and operational work assessable against a planning scheme - IDAS
Yes form 6
• Continue on to question 1.3
1.3 Is any part of the premises located in part of a future state-controlled road or within 100 metres of a
state-controlled road?
® No
No It isis recommended
It recommended
mended that you
you complete
mplete part 2 (starting
statling from question
uestion 2.1)
2.1 of
of this
this checklist.
Yes It isis recommended
It mended that you
you complete
mplete part 2 (starting from
from question
uestion 2.2)
22) of
of this
this checklist.
Does State Planning Policy 2102: Planning and Managing Development Involving Acid Sulfate Soils
apply to the development?
® No
Yes • It is recommended that you complete part 3 of this checklist.
1.5 Is there any proposed operational work for filling or excavation?
o
® N No • It is recommended that you complete
complete part
part 4 (starting
starting from
from question 4.5) of this checklist.
checklist.
Yes • It is
is recommended
recommended that
that you
you complete
complete part
part 44 (starting
(starting from
from question
question 4.1)
4.1) of
of this
this checklist.
checklist.
Jeveloslment Counter
2 8 JUN 2011
Tewantin
Department of Infrastructure and Planning Queensland
Government
Page 14
1.6 Is any of the proposed operational work listed in schedule 12 of the Sustainable Planning Regulation
2009 and does it exceed the specified threshold?
Z No
• This application requires assessment by the Department of Transport and Main Roads as a
q Yes
concurrence agency
Section reference:
• Sustainable Planning Regulation 2009, schedule 7, table 3, item 14
1.7 Is any of the proposed operational work listed in schedule 13 of the Sustainable Planning Regulation
2009 and does it exceed the specified threshold?
® No
• This application requires assessment by the Department of Transport and Main Roads as a
q Yes
concurrence agency
Section reference:
• Sustainable Planning Regulation 2009, schedule 7, table 3, item 15
1.8 Is any part of the premises in an interim koala habitat protection area identified under the South East
Queensland Koala state planning regulatory provisions (SEQ Koala SPRP)?
Z No
q Yes It is recommended that you complete part 5 of this checklist.
1.9 Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is
also assessable?
® No
Yes It is recommended that you complete part 6 of this checklist.
q
1.10 Does the Vegetation Management Act 1999 apply to any of the proposed operational work for the
clearing of native vegetation?
® No
Yes It is recommended that you complete part 7 of this checklist.
1.11 Is any of the proposed operational work for any thing constructed or installed that allows, under the
Water Act 2000, for taking or interfering with water from a watercourse, lake or spring (other than
using a water truck to pump water; and other than under the Water Act 2000, section 20(2), (3) or (5),
or from a dam constructed on a watercourse or lake?
® No
q Yes
e
NoY s It is recommended that you complete part 8 (starting from question 8.8) of this checklist.
It is recommended that you complete part 8 (starting from question 8.1) of this checklist.
1.12 Is any of the proposed operational work tidal work, other than excluded work defined under the
Sustainable Planning Regulation 2009?
® No
E] Yes • It is recommended that you complete part 9 of this checklist.
Opera`icn ? .: o - IDAS checklist 4
Version 1.0 December 2009
Page 15
1.13 Is any of the operational work proposed to be carried out within a coastal management district?
® No
q Yes It is recommended that you complete part 10 of this checklist.
1.14 Is any of the proposed operational work for constructing or raising waterway barrier works under the
Fisheries Act 1994?
® No
q Yes It is recommended that you complete part 11 of this checklist.
1.15 Is any of the proposed operational work to be carried out completely or partly within a declared fish
habitat area under the Fisheries Act 1994?
® No
q Yes It is recommended that you complete part 12 of this checklist.
1.16 Is any of the proposed operational work removing, destroying or damaging marine plants under the
Fisheries Act 1994?
® No
q Yes It is recommended that you complete part 13 of this checklist.
1.17 Is any of the operational work proposed to be carried out in a wild river area declared under the Wild
Rivers Act 2005?
® No
Yes It is recommended that you complete part 14 of this checklist.
1.18 Is any part of the premises located in part of a future state-controlled road or within 100 metres of a
state-controlled road?
® No
Yes It is recommended that you complete part 15 of this checklist.
Part 2 - State-controlled roads
2.1 Is the proposed operational work for filling or excavating listed in the Sustainable Planning
Regulation 2009 schedule 11 and does it exceed the threshold or combined threshold?
® No • End of part 2 of this checklist.
q Yes This application requires assessment by the Department of Transport and Main Roads as a
concurrence agency.
End of part 2 of this checklist.
Section reference:
• Sustainable Planning Regulation 2009, schedule 7, table 3, items 1(b) and 2
Part 4 - Easements and Substations
era! s - IDAS checklist 4
Version 1.0 December 2009
Page 16
4.5 Is any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number
1 issued under the Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane
strategic pipeline?
® No
q
NoYe s •
End of part 4 of this checklist.
This application requries assessment by the pipeline licence holder as an advice agency.
Section reference:
• Sustainable Planning Regulation 2009, schedule 7, table 3, items 9(a), 9(b) and 17
Part 8 - Taking or interfering with water
8.8 Is any of the proposed operational work for any thing constructed or installed that allows, under the
Water Act 2000, for taking or interfering with artesian water (other than using a water truck to pump
water)?
No
• You must complete Taking artesian or sub-artesian water - IDAS form 12.
q Yes This application requires assessment by the Department of Environment and Resource
Management as a concurrence agency.
8.9 Is any of the proposed operational work for any thing constructed or installed that allows, under the
Water Act 2000, for taking overland flow water (other than using a water truck to pump water)?
® No Go to question 8.12.
E] Yes
8.12 Is any of the proposed operational work for any thing constructed or installed that allows, under the
Water Act 2000, for taking or interfering with subartesian water (other than using a water truck to
pump water)?
® No Go to question 8.14
F-1 Yes
8.14 Does any of the proposed operational work for any thing constructed or installed that allows, under
the Water Act 2000, for interfering with overland flow water (other than using a water truck to pump
water)?
® No Go to question 8.19
F-1 Yes
8.19 Is the proposed operational work for the following?
for the construction of a referable dam as defined under the Water Supply (Safety
El Yes ®No
and Reliability) Act 2008
to increase the storage capacity of a referable dam by more than 10 per cent E] Yes ®No
If yes to any of the above you must complete Referable dam - IDAS form 16.
• This application requires assessment by the Department of Environment and Resource Management
(DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application
Operat/c.i - IDAS checklist 4
Version 1.0 December 2009
Page 17
C
Section reference:
• Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, items 3 and 4
• Sustainable Planning Regulation 2009, schedule 5, part 1, table 4, items 3 and 4
• Sustainable Planning Regulation 2009, schedule 7, table 2, items 9, 10 and 11
• Water Act 2000, section 966A and 966B (note: no current wild river declaration identifies taking or interfering
with subartesian water as assessable)
• Wild Rivers Act 2005, section 43A
• Wild Rivers Code (note: this code does not currently contain applicable provision for taking or interfering with
artesian water)
• Relevant wild river declarations
Notes for completing this form:
• Applicant details - IDAS form 1 and Development application assessment - IDAS checklist 1 must be
completed for all development applications to be considered.
• The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning.
Privacy - please refer to the assessment manager for further details on the use of information recorded in
this form.
Disclaimer:
While the Department of Infrastructure and Planning (DIP) believes that the information contained on this form and
provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on the
information without first making your own enquiries regarding the interpretation and application of the applicable
legislation to your circumstances.
To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for
negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or other
consequence which may arise from your reliance on this process and the information contained on this form.
Operatro a? v. onc> - IDAS checklist 4
Version 1.0 December 2009
Used in these records
Development Application - Part 1 of 2 - IDAS Forms 1 & 6 and checklist 4Related documentApplication case desk ↗
About this file
- File size
- 2.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.