Skip to the record
Accept no imitations.

Original source · versioned page text

2017-03-13 GC - Attachment 1 to Item 5 - Draft Transport Strategy 2017-2027

of 67

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Community comments May - June 201



    Date
    Feedback
    received     Theme               Comments / Suggestions
    16/06/2016   Changes needed      Charge registration for cyclists
    14/06/2016   Changes needed      It's too hot to ride your bike to work from November to April so alternatives are needed
    14/06/2016   Changes needed      Suitable links from shops to holiday precincts
    21/04/2016   Changes needed      Crank Street Tewantin needs a footpath as there is a lot more foot traffic now

    2/06/2016    Cycle roads/paths   Cycling on Noosa Pde is dangerous. Needs a dedicated cycling road as does Noosa Hill to Lions Park.

    31/05/2016   Cycle roads/paths   Cycle paths for transport like Europe. Dedicated for cyclists only.

    4/06/2016    Cycle roads/paths   Create dedicated cycling paths/roads for cyclists only

    4/06/2016    Cycle roads/paths   Create dedicated bike lanes for cyclists only

    27/05/2016   Cycle roads/paths   Very important that bike paths are accessible and safe

    27/05/2016   Cycle roads/paths   Planned links and connection of bikeways & cycle ways

    16/06/2016   Cycle roads/paths   No bike lanes

    16/06/2016   Cycle roads/paths   No bike lanes - change into scooter lanes

    16/06/2016   Cycle roads/paths   More bike lanes

    16/06/2016   Cycle roads/paths   Cycle paths for bikes and keep off the roadways

    16/06/2016   Cycle roads/paths   Better (wider) path needed to Noosa Heads. I don't feel safe on my bike

    14/06/2016   Cycle roads/paths   New roads for 2 wheels

    14/06/2016   Cycle roads/paths   Good cycle lanes that not dangerous

    14/06/2016   Cycle roads/paths   Keep making room for cyclists

    14/06/2016   Cycle roads/paths   Some improvements needed for road cycling core corridors. Recreational well catered for

    14/06/2016   Cycle roads/paths   Increase Cycling permeability

    14/06/2016   Cycle roads/paths   Wider path ways for cycling

    14/06/2016   Cycle roads/paths   Need more dedicated off road cycleways for increased safety for users

    14/06/2016   Cycle roads/paths   Fully connected and comprehensive off road pathway system connecting all major coastal areas and rural towns and village

    14/06/2016   Cycle roads/paths   Focus bike infrastructure on commuting not recreation / fitness
Log in to download the original file

2017-03-13 GC - Attachment 1 to Item 5 - Draft Transport Strategy 2017-2027(PDF, 13MB).pdf · 13.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.