Council archive · source document
Response to NC IR · MCU15/0016
Attached to the e-mail MCU15/0016 Response to information request (updated).
Council’s Reference: MCU15/0016 Our Reference: 1542 L04 NG Our Contact: Nadine Gorton th 25 May 2015 The Chief Executive Officer Po Box 141 TEWANTIN QLD 4565 Confidential Email Transmission: [email protected] & [email protected] Original in Post: No ATTENTION: JACK LEWIS - PLANNING AND DEVELOPMENT DEPARTMENT Dear Sir, RE: RESPONSE TO INFORMATION REQUEST Material Change of Use – Development Permit for a Material Change of Use – Type 2 Production, Alteration, Repackaging & Repairing (Vehicle Workshop) and Ancillary Dwelling Unit over land situated at 73 Rene Street, Noosaville and described as Lot 1 on SP244573. I refer to the above application and in particular to the request for additional information issued by your th Council and dated 27 March 2015. This request listed five (5) items that Council considers is necessary in order to complete its assessment of the above application. The applicant has decided to respond to these items as below: Item 1: Amend the driveway and carparking layout to comply with AS standards. Applicant’s Response to Item 1: TTM Consulting have reviewed the proposal plans and have redesigned the proposal plans to comply with Australian standards. TTM have provided a dimensioned plan of the car parking layout and these changes have also been incorporated into the amended architectural plans. Please refer to Attachment A and B. Item 2: Please amend the driveway layout plan allowing for a two way driveway with appropriate widths. Applicant’s Response to Item 2: TTM Consulting have reviewed the proposal plans and have redesigned the proposal plans to comply with Australian standards. Please refer to Attachment A. Item 3: Provide further information as to the type of trucks using the loading bay, frequency of use and justification for the selected location Applicant’s Response to Item 3: TTM Consulting have responded to this item in their correspondence th of 13 May 2015. Please refer to Attachment A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 1 page
Page 2
Page 2
Item 4: Provide information how the above traffic conflict will be addressed. If it is proposed that
the access to the site will be left-in and left-out only, advise what measures will be
implemented to enforce this restriction.
Applicant’s Response to Item 4: TTM Consulting have responded to this item in their correspondence
th
of 13 May 2015. Please refer to Attachment A
Item 5: Provide a stormwater management plan.
Applicant’s Response to Item 5: Construction Hydraulic have provided a stormwater management
plan for the site. Please refer to Attachment C.
The applicant considers that he has now responded to Council’s information request. Would you please
provide me with a list of the adjoining owner so we can commence public notification. Please contact our
Sunshine Coast office if you require any further information and/or clarification.
Yours faithfully,
Nadine Gorton
Senior Planner
martoo consulting pty ltd
Used in these records
Response to NC IR.pdfRelated documentApplication case desk ↗
About this file
- File size
- 376 KB (small file)
- File type
No other editions are linked here.