Nokeky Memo DATE: Wednesday, 17 October 2007 FILE: < TO: Lyn Pearce . Cc: "oo FROM: Ron Read, Senior Technical Assessment Officer SUBJECT: Quote for fees - Bulk earthworks Bunnings site Gateway Drive Noosaville. - Op Works Plan Examination 3.3.1 Bulk earthworks ~ 25861m°* first 5000m* = $1080 $1080 20861/ 5000 =4.1=5 @ $270 . $1350 $2430° 3.4 erosion & sediment control plan check ~ 27451m? first 1000m? = $115 26451 / 200 = 132.2= 133 x $12 = $1596 . $1711 Total Plan examination $4144, Inspections * 4.1.2 bulk earthworks @ $115 per day anticipated No of days( +) Ry 0H) Total inspections sear Ron Read , Senior Technical Assessment Officer.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 55 pages
Page 2
ss consulting 16 October 2007 Our Ref: CB-0849:L001:DP:ks The Chief Executive Officer Noosa Council PO Box 141 TEWANTIN QLD 4565 Attention: Development Assessment Manager Dear Sir/Madam, 178-182 EUMUND! NOOSA ROAD, NOOSAVILLE OPERATIONAL WORKS APPLICATION Please find enclosed an application for Operational Works (bulk earthworks) approval for the abovementioned site. Payment of the Portable Long Service Levy required is being arranged and the QLeave Notification and Payment Form will be forwarded to Council shortly. Please forward a copy of the receipt for payment of the Operational Works application fee and Council’s Acknowledgement Notice in due course. Should you have any queries please do not hesitate to contact the undersigned. National Busifless Development Manager for BMD Consulting Pty Ltd Enc. Completed IDAS Forms Part A, Part E & IDAS Assessment Checklist; Cheque payment for relevant Operational Works application fee; Owner's Letter of Consent; Drawings/Drawing Transmittal: Copy of Noosa Council Decision Notice for ROL over site (23438 DA); Geotechnical Report prepared by Douglas Partners: In-situ Ground Improvement Report prepared by LandPac. BMD Consulting Pty Ltd ABN: 23 010 743 692 BMD CORPORATE CENTRE Southern Queensland Gold Coast Northern Australia New South Wales Cairns 25 Cambridge Parade 46 Price Street Level 1, 57 Mitchell Sueet Level 3, 3 The Crescent 2/110 Aumutler Street Manly Qld 4179 Nerang Qld 4211 North Ward Qid 4810" Homebush Bay NSW 2127 Cairns Qld 4870 PO Box 197 Wynnum Qld 4178 T: 07 3893 7000 F: 07 3893 4088 [email protected] ‘wananw hed com. au PO Box 764 Nerang Qld 4214 T; 07 5596 2400 F: 07 5596 2849 [email protected] PO Box 6008 Townsville MC Qkd 4810 T: 0? 4750 7000 F: 07 4750 7077 [email protected] PO Box 3541 Rhodes NSW 2138 T: 02 9475 6900 F: 02 9475 6999 [email protected] T: 07 4035 1544 F: 07 4035 1566 [email protected]
Page 3
Bo. Hs!
INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007
+ " 5 ~
Form 1 Development Application eet
Part A
Common details
{identification of th pi
1. Can any part of the premises be identified by a street address or lot on plan description?
[] No - Answer Qi{a)
Yes - Complete Table B and answer Qi{b} and Qi{c}
Table B
a sna Lol Gn plan description a
@ Unit 1] Street i aendscipine ae
number: number bot ; Pian type ll Plan
s B | #8 number IB | f (eo RP, SP) [1S number
ul
178-182 | EUMUNDINOOSA ROAD =| NOOSAVILLE 4566
RP 133192 | NOOSA SHIRE
121 RP 867627 NOOSA SHIRE
L25 RP 151406 | NOOSA SHIR}
fe
. (HS tetica eH
1(b). Can the address be further described by shop/tenancy number or storey/level? Poe
[kK] No
(1 Yes - Complete Table C
1{c). Is any part of the premises strategic port land under the Transport infrastructure Act 19947
No
(1) Yes - Complete Table 0
@ 2. Can the premises best be identified by coordinates (e.g. for development proposed in waters, or on a site within a large rural tot)?
No
(1 Yes - Complete Table E
3. Are the premises within or adjacent to a water body or watercourse?
No
oO Yes - Complete Table F and answer Q3{a)
4. Whats the total area of land that makes up the premises (i. the area covered by the application)?
Salpet Area of land above high water mart/outside watercourse amie
F Area ina water body or watercourse Hae
3.17 Cm hectares —(Tick applicable unit) (mm? [hectares (Tick applicable unit)
5. Are the premises currently used for any purpose?
[x] No
(11 Yes - Ensure details of any existing use of the premises are provided in plans and documentation submitted with this application, e.g. location
and nature of existing uses, buildings, structures and services
Page 4
INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007
6. Are there any existing easements on the premises (e.g. for vehicular access, electricity, overland flow)?
7. Are new uses proposed on the premises?
[X] No
(1 Yes - Provide details in Table 1
8. Are new buildings or structures proposed to be erected on the premises?
[X] No
(2) Yes - Ensure the nature, location and dimensions of the proposed new buildings, structures ar Services are included in plans, submitted with the
application
Applicant details
@ 9. Whois the applicant for the application?
Company/organisation name BMD CONSULTING PTY LTD
(if applicable)
Individual’ contact person detail
Title {ur Firstname [DAVID i|Lastname [POLDEN |
Postal address [PO BOX 197, WYNNUM QLD 4178
Contact telephone number jo7 3893 7000
Mobile phone number [ogg 715 561
Loi
Facsimile number [o7 3893 4088
e-mail address [[email protected]
10. Ooes the application involve a State-owned resource prescribed by schedule 10 of the Integrated Planning Regulation 1998 (IP Reg) or
e@ any other regulation?
[x} No
oO Yes - Complete a new Table J for cach State-owned resource and submit, with the application evidence of resource allacation or entitlement
11. Does the application involve land other than State-owned land (i.e. privately owned land) and require owner's consent?
[No
Yes - Complete Table K and submit, with the application, written documentation of aif owner's consent
Table K
Date ‘written consent j
bs was obfairied Hg
1 BUNNINGS GROUP LIMITED MT GRAVATT CAPALABA RD, MT GRAVATT 03/10/2007
Page 5
a
Loe
x
wae
INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007
" |Mandatory: attachments and,supporting information " ”
12. What are the other parts of IDAS Application Form 1 submitted with this = application, and dhe other er mandatory attachments and
supporting information accompanying this application, not identified in those other form parts?
1 OWNER'S CONSENT a GENERAL AUTHORITY 03-Oct-2007
2 IDAS FORM PART E OP WORKS APPLICATION 16-Oct-2007
3 IDAS FORM 1 DA ASSESSMENT CHECKLIST 16-Oct-2007
4 REPORT (DOUGLAS PARTNERS) GEOTECHNICAL INVESTIGATION | 16-Aug-2007
5 REPORT (LANDPAC) INSITU GROUND IMPROVEMENT | AUG 2007
6 ROL DECISION NOTICE (NOOSA SHIRE) | 23438 DA 14-Oct-2004
Portable Loriq Service Leave (PLSL) levy for building and construction work)
13. Is payment of a Portable Long Service Leave (PLSL) levy required for building and construction work before a development permit for
the application can be given?
L) No
Yes
13(b). Has the PLSL levy been paid?
No - Complete and submit a QLeave Notification and Payment Form. The receipted form must he sighted by the assessment
manager before a development permit can be given.
oO Yes - Complete Table L and submit, with the application, the "yellow" (Local Government's (Council) / Private Certifier's} copy of
ihe receipted QLeave Farm,
OFFICE USE ONLY
Date Received Reference Numbers "
FOR COMPLETION BY ASSESSMENT MANAGER!
Is a QLeave Notification and Payment Form required for this application?
[No
LL Yes - Complete Table M
NOTIFICATION OF, ENGAGEMENT OF, PRIVATE.CERTIFIER,
To Council
| have been engaged as the private certifier for the building work referred to in this application
3
Building dassiicaton
Saige, ceils. Spin mate, Bn
engagement | ‘ vee “Sou fs i oe eo [Pes cen es nb
Page 6
~%
RY
Base de
INTEGRATED PLANNING ACT 1997 Part E, Version 3.0, 3 September 2007
Senin eta Application
Part E
Building &/or operational works assessable against a planning scheme
1, Is the application seeking approval of building work assessable against the local government planning scheme?
No
OO Yes
2. Is the application seeking approval of operational work assessable against a planning scheme?
6 OO No
Yes
2(a) Is the application seeking approval for more that one type of operational work?
No - Complete Table B
Oo Yes - Complete a new Table 8 for each type of operational work
Table B
(i) Whatis the nature of the operational work?
{FJ Roadworks () Stormwater (J Water infrastructure CC) Sewerage infrastructure
([] Landscaping (1 Clearing vegetation under the planning scheme Earthworks
(J Drainage Works = ([] Other - Specify below
(ii) Is the application for operational work involving the creation of new lots?
(1 No
@ Yes - Specify number below
[3 LoTs To 2 LOTS
(iii) What type of approval is being sought?
(I) Preliminary approval
Development Permit
(iv) Is there a current Preliminary Approval for this operational work on the premises?
No
(1 Yes - Complete Table B(a)
(v) Are the works subsequent to a previous Development Permit or Preliminary Approval for another aspect of development?
(J No
Yes - Complete Table B(b)
Table B(b)
List of approval references
esearch
1 SUBDIVISION APPROVAL (23438 DA) 14/10/2004 14/10/2008
Page 7
te * INTEGRATED PLANNING ACT 1997 : Part E, Version 3.0, 3 September 2007 Method.of.ledgement rT Plans showing the nature and location of the proposed works (including the extent of any cut and fill) OFFICE USE ONLY Date Received Reference Numbers
Page 8
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
Form 1 Development Application
IDAS
Assessment Checklist
3 ‘esi
bac and all oth -Felevant secti AS of the (DAS Assessment Ch Klist imu be ci
Answering the following questions will assist you in Gemning which sections of the checklist must be completed for your application.
If unsure, phone or visit your local goverment or log on to the IPA website for help.
Ooes the application seek approval to materially change use of the premises? CrYes | No
if yes - complete Section 2 of this checklist
Does the application seek approval to reconfigure a lot?
if yes - complete Section 3 of this checklist and Part F of IDAS Application Form 1 DYes |ENo
Assessment is by the local government
Does the application seek approval to carry out operational work?
if yes - complete Section 4 of this checkiist [Yes }L)No
Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994?
if yes - complete Section 5 of this checklist
Does the application seek approval to carry out building work requiring assessment against a local government planning
scheme? .
if yes - complete Part E of DAS Apptication Form 1 C)Yes |[x]No
Assessment is by the local government
Does the application seek approval to carry out building work requiring assessment against the Building Act 19757
if yes - go to Appendix 1 of this checklist for advice on building referrals. Complete Part B of IDAS Application Form 1 01 Yes |[]No
Assessment is by a building certifier
OD Yes |[K]No
SECTIONS section siust be compéted fora apn
HERITAGE ee: :
11 Is any part of the proposal intended to be carried out on a registered place under the Queensland Heritage Act 1992?
No
(1 Yes
IPA, schedule 8 part 1. lable 5, dem 2
IP Regulation. schedule 2, table 2, item 18
IPA, section 1.3.5 (Definitions for terms used in development)
IREMOVING QUARRY MATERIAL; WILD RIVER AREA
1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
No
CI Yes
Page 9
a L
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
IPA, schedule 8, pa i
JP Regulation, schedule 2, tabi
IP Regulation. schedule 1. tabi
Water Act 20t
Wild Rivers
en TT
}. tom 2 (wild river area)
ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA =.
1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
No
C) Yes
IPA, schedule 8 part 3, table 2, item
IPA, schedule 8 part 7, table 3. tems 3 and 4
IP Requiation, sehedule 2, table 2, items 1 and 23
Environmenial Pratecuon Act 1994, section 73AA (evil river area)
Wild Rivers Act 2005, section 434
WITHIN THE LIMITS OF A PORT ~
1.4 ls any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
[x] No
@ oo
JP Regulation, schedule 2, table 2, tems 15 and 16
(DECLARED FISH HABITAT AREA T= ee ee
1.5 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
—K) No
(C1 Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA,
schedule 8, this application requires assessment by the Department of Primary industries and Fisheries (DPI&F). if DPI&F is not
the Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
IP Regulation, schegute 2. table 2. item 26
COMMUNITY INFRASTRUCTURE ©
41.6 ls any part of the premises designated for community infrastructure?
No
C1 Yes
JP Requiation, schedule 2, table 3, item 7
LI Sa
a a Geo Ge be RR lene We ape
[WASTE WATER MANAGEMENT:
@ 17 Does the proposal involve the establishment or expansion of a waste water disposal system?
No
(1) Yes
IP Regulation, schedule 2, table 2, item $
ISEGTION 4 Section’ must be completed when the application seeks approval to carry out operational, work:
PLANNING SCHEMES re. gn aa. : — on
ae Ree: Geer
41 Is any of the proposed operational work assessable under a planning scheme?
(1) _No- Goto Question 4.2 below
Yes - Complete Part E of IDAS Application Form 1 and Questions 4.1.1 - 4.1.8 below
STATE-CONTROLLED ROAD
4.1.1 Is any part of the premises within 100m of a State-controlled road, or part of a future State-controlled road?
(1 No
Yes
Page 10
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
If yes, is all of the proposed operational work associated with the following?
A material change of use that is assessable under the planning scheme (k] No 0 Yes
Reconfiguring a lot that does not increase the total number of lots and does not increase No mY
the total number of lots abutting the State-controlled road es
ifno to either or both - Answer (a) - (c) below.
(a} Is any of the proposed operational work associated with access to a State-controlled road?
(1 No
O Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
{b} 's any of the proposed operational work for filling or excavation?
(No
CL] Yes
{c) Does any of the proposed operational work involve the redirection or intensification of site stormwater from
the land, through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a
_State-controlled road?
(1 No
oO
Yes
1P Regulation, schedule 2. table 3, item 3
IP Regulation, schedule 2, table 3, item ib)
ACID SULFATE’SOILS
4.1.2 Is any of the operational work proposed in a local government area listed? in State Planning Policy 2/02: Planning and
Managing Development Involving Acid Sulfate Soils?
No
OO Yes
Spurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Caoloola, Douglas,
Fitzray, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Momington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday
1P Regulation, schedule 2, table 3, item 4
State: Planning Policy 2/02: Planning and Managing Duvelopment involving Acid Sultate Sods, section 3.6
EASEMENTS AND SUBSTATIONS
4.1.3 Is any of the proposed operational work for filling or excavation?
(1) No
e Yes
If yes, is the filling and excavation associated with reconfiguring a lot?
Yes
(1 No - Answer bath (a) and (bh) below
IP Regulation, schedule 2. table 3 item 10{a)
JP Regulation, schedule 2, table 3. tant 10(h}
4.1.4 Is any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 4 issued under the
Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
No
CI Yes
IP Regulation, schedule 2, lable 3. iter 1?
PUBLIC PASSENGER TRANSPORT,
4.1.5 Is any of the proposed operational work listed in schedule 13C of the integrated Pianning Regulation 1998 and does it exceed the
specified threshold?
No
(J Yes - This application must be referred to QueenslandTransport (QT) as Concurrence Agency.
JP Requiation, schedule 2, table 3, tem 14
Page 11
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
IRAILWAY SAFETY AND EFFICENCY yy é ; a vat
4.1.6 |s any of the proposed operational work listed in schedule 13D of the integrated Planning Regulation 1998 and does it exceed the
specified threshold?
No
(1) Yes - This application must be referred to QueenstandTransport (QT) as Concurrence Agency.
iP Regulation, schedule 2, table 3, item 15
IKOALA ‘CONSERVATION: steaie:
4.1.7 Is any part of the premises in a koala conservation area or koala sustainability area?
No
CI Yes
IP Regulation, schedule 2, table 3, tom 19
WILD RIVER AREA’. - Although legislation provides for assessment of f operational works for residenti
(development fot the Purposes of of fthe Wild Rivers Act 2005, , cuiTently no 6 declarations for any of the wild
Lode to that type of development. * a a: Ran: Sh
4.2 Is any of the proposed operational work associated with reconfiguring a lot, if the reconfiguration is also assessable?
[X}] No
() Yes
IPA, schodule 8, part 1, table 4, item 2
IP Regulation, schedule 1, part 2, table §, item ¥(c)
Wild Rivers cade (Note: the code dees net currently contain applicable provisions for residential, industrial or commercial development inside a designated vrbari
area)
{VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA® ce hep
43 \s any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?
No
C) Yes
JPA. schedule 8, part 1, table 4, hems 1A-1G
IP Requiation, schedule 2, table 2, iten § (vegetation cleaving)
(P Regulation, schedukt 2, table 2, fem 34 (koala conservation)
IP Regutation, schedule 1, part 3, table 4, itan i
Vegetation Managemenl Act 1999, section 22A (veqelation clearingfwild river area}
Wild Rivers Act 2008, sections 31 and 43A
TAKING OR INTERFERING WITH WATER; WILD RIVER AREA
44 Is any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with water from a
watercourse, lake or spring (other than under the Water Act 2000, section 20(2), (3) or (5)), or from a dam constructed on a
watercourse?
(k] No
oO Yes - This application requires assessment by the Department of Natural Resources and Water (NRW). If NRW is not the Assessment
Manager for the application, the agency has jurisdiction as Concurrence Agency
JPA, schedule 8, part 1, table 4, lems 3{a)
IP Requiation, schedule 2, able 2, tem 8
1P Regulation, schedute 1, part 3. table 4 tems 3 and 3A
Water Act 2000, soctinn 966A (wid river area)
Wild Rivers Act 2005, suctinn 43A
Page 12
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
45 Is any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with artesian water?
No
oO Yes - (Complete Part K,) This application requires assessment by the Department of Natural Resources and Water (NRW). If NRW is
not the Assessment Manager for the application. the agency has jurisdiction as Concurrence Agency.
IPA, schedule 8, part 1, table 4, tem 3fb)
iP Regui chedule 2, tabs mg
IP Reguk hedule 1, part 3. table 4. Rem 3
Wild Rivers code (Note: the code does not currently contain applicable provisions jor faking or interfering with artesian wated
46 ts any of the proposed operational work to allow, under the Water Act 2000, for taking overland flow water?
[x] No
[1] Yes - Answer (a) and (b) below
IPA, schedule 8, part 1, table 4. tem Z(t}
iP Regulation, sehedule 2, table 2, item &
JP Regulation, schedule 1, part 3, lable 4, tem 3
Water Ae t 2000. section 966A {wild river area)
Wild Rivers Act 2008, section 43A
47 Is any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with subartesian water?
IPA, schedule 8, part 1, table 4. itam 3(ch(it
IP Regulation, schedule 2. table 2, item &
IP Regulation, schedule 1, part 3, table 4, tem 3
Water Act 2000, section 9G6A (wild river area)(Note: no current Wild River declaration identifies taking or interfering with subartesian water as assessable)
Wild River code (Note: the code does ner currently contain applicable provisions for sub artesian walter)
48 Is any of the proposed operational work to allow, under the Water Act 2000, for interfering with overland flow water?
[X] No
O Yes - Answer both (a) and (b} below
IPA, schedule & part 1, table 4, tenis 3{c)()) and 3(d)
JP Regulation, schedule 2. lable 2, iten 9
JP Requiation, schedule 1, part 3, table 4, item 3A
Water Act 2000, section 9668 (witd siver area)
49 Is the proposed operational work for the following?
For the construction of a referable dam as defined under the Water Act 2000 = [x] No OC Yes
To increase the storage capacity of a referable dam by more than 10% (%] No O Yes
if yes to either or both - (Complete Part K,) This application requires assessment by the Department of Natural Resources and Water (NRW).
if NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA, schedule 8, part 1, table 4, tem 4
IP Regutation, schedule 2, tabla 2. tem 10
[TIDAL WORK; WILD RIVER AREA gg
4.10 ls any of the proposed operational work tidal work, other than excluded work defined under the IPA?
(x] No
(1) Yes - Answer (a) and (b) below
IPA, schedule 8, part |, table 4, tam §
fk schedule 2, table 2. items 12, u ang v
Page 13
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
IPA, schertute 8. past 1. lable 4, ter
IP Regulation. schedule 2, table
IP Regulation, schedule 7, part 3, table 4.
&
( Yes
IPA, schedide 8, part 1, lable 4. tem 6
IPA, schedule & part 2. table 4, item 2
IP Regulation, schedule 2, table 2. item 28
ion. schedule 1, pait 3. table 4, item 6
Fisheries Act 1994, section 76D (wiki aver area}
Wild Rivers Act 2005, section 43A
[DECLARED FISH HABITAT AREA’ WILD RIVER AREA
4.13 Is any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 1994?
[x] No
0 Yes
IPA, schaduie &, part |, table 4, tom 7
(PA, schedule §, part 2, table 4, item 3
IP Regulation, schedule 2, table 2, tem 25
IP Requiation. schedule 1, part 3, table 4, tem 7
Wild Rivers Act 2008, sections 43A
Fishenes Act, section 76DC (vid river area}
DESTRUCTION. OR DAMAGE OF A MARINE. PLANT; WILD RIVER AREA (ew i 5 ak a ca oe
ts i f .
REMOVAL’ cae
4.14 ls any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
JP Regulation, schedule 2, table 2, tent 29
IP Requiation. schedule 1, part 3. table 4, item 8
Fisheries Act 1994. section 76DA (wild iver area)
Wild Rivers Act 2005, section 43A
4.15 1s any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?
[x] No
CI Yes
IPA, schedule 8, part 1, lable 4, tem 10
IP Regulation, schedule 2. table 2. item 37
Wik ‘5 Act 20085, sections 42. 43A
STATE-CONTROLLED ROAD
4.16 Is any part of the premises within 100m of a State-controlled road, or part of a future State-controlled road?
LI No
Yes
Page 14
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
If yes, is what the proposed operational work is associated with (Tick applicable box/es)
A material change of use that is assessable under the planning scheme 1 No Yes H
Reconfiguring a lot that does not increase the total number of lots and DD No El Yes
does not increase the total number of lots abutting the State-controlled
toad
Other OO No 0 Yes
ff yes to “other”, and answers to questions in this Section of the checklist indicate the proposed operational work is assessable under
IPA, schedule 8 - Answer (a) to (c) below
IP Regulation, schedule 2, table 2. item 3
Disclaimer:
While the Department of Local Government, Planning, Sport and Recreation (DLGPSR) believes that this information contained on this
form and provided as part of this process will be of assistance to you, itis provided on the basis that you will not rely on the information
without first making your own enquiries regarding the interpretation and application of the applicable legislation to your circumstances.
To the full extent permitted by law DLGPSR expressly disclaims all liability {including but not limited to liability for negligence) for errors
or omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your
teliance on this process and the information contained on this form
Proposal ID
Page 15
2UNNINGS
Memorandum
To: "BMD :
Copy:
From: Paul Pham
Date | 3 October, 2007
- Subject:- 7 Authorisation to Lodge Documents to Authorities |
7
To whom this may concern, ‘ . ‘
On behalf of Bunnings Group Limited, | confirm BMD is authorised to fodge. documents for statutory
: approvals on land situated at 172-1 82 Eumundi Noosa Road, Noosaville., .
Regards
Pa | Pham
QLD Project Manager
.Bunnings Group Limited =~
“.. Level 3 Nexus Bldg
‘96 Mt Gravatt Capalaba Rd, Upper Mt Gravatt atp 4122
PO Box 2277, Mansfleld BC, Mansfietd QLD 4122
Phone : (07) 3452-6639
Mobile : 0400 213 240
Fax : (07) 3452 5970
E-mail : [email protected]
Website : ywrw,bunnings.com.au
Pented S10/2007 2:31 PM A Pagetort
‘CADooumants end SaTingcipphamiDerktop MEMO - CORPORATE J00
Page 16
eet po + “4 ---
parat hep
‘SCALE: VERTICAL - 1250
SCALE HORIZONTAL - $800
i tp
SCALE: VERTICAL ~ $250
SCALE: HORIZONTAL - 5500
25 0 25 50 75 10 125m 1250 ' SCALE: #750
a :
SCALE BEFORE REDUCTION \ NOTES
- An erosion and sediment cantrol plan will be required r
5 0 $ 1% 1% 20 ZSm : i as part of any operational works application for the } ee
1500 proposed earthworks CJ su; 2sg6im
SCALE BEFORE REDUCTION . - - Toterance on levels: -SOmm - +00mm . ,
75 0 75 15 225 30 375m
i [on a me eee a] tISO
i SCALE BEFORE REDUCTION
} © Cardno (Okc) Pty Ltc All Rights Reserved 2008. | OCSGRED: OFFICES: TELEPHONE aX
i cro (hc) Py ha A Righter ZOE sand At |oatum: AH.D. Grietone 7h Ses sean (07) sen oraz BUNNINGS GROUP LIMITED _
ray natbe ied, soe, bwalarec cored ortopotuend Mech orinpma hwymerre or LOCO BT Looe Base ase Sach esa? AE: 7a SEPTERBER 1006 ry
3 fesmer on any manda, 10 wy then by agreement wih Carrs (Ok Py Ud. CHECKED: Surating Coost {07} S443 72583 Sets 3042 BUNNINGS NOOSA em
é escort © ponent Ca Py wy om re ie 1D PRON. MAN) APPROVED: PROM OR. Cardo (Qi6) Pry Lid pow ons ore ose rm, A ine SS (or) STH 3188 | EUMUNDI - NOOSA ROAD onan
12 Laval 1, 3 Oartoer stbourne 3S
i Riunnntema cca te ews eek cee Seorge> (2) (Bp Sas Bg | CUM EARTHWORKS Puan 3501/54/01-001
3 tele Te apa] Sromo ninco open entwomentotrm ame ADE BRGaT A ADVE Mog net ou t sss7 ata wa? ons |
4 RESINS ars were cortre.com.cu
. ee
Page 17
al Sab a\ED-4NG ~ Benen War phevte Moguavdla\T Or wenge « Ged \CBUNLY_ 61 ESC
An
Fis Kane BAS guy - Consulting 76 out
Yaar SUA HALET
Prat ates 4 O40 BLO
REFER DWG CB0849-C03 LEGEND PROPOSEO EARTHWORKS
ee a 10.5 CONTOURS
(0.2m INTERVALS]
PROPOSED SED
. BASIN CONTOURS
{0.2m INTERVALS)
$
S
ocr acne cn
me Some Sf SILT FENCE
SEQIMENT BASIN DISCHARGE LOCATION
STRAND POST AND
‘WITH SAFETY —o—e—0—o——2—__ 2 STRAND POST & WIRE FENCE
WITH SAFETY HESH
mi ROCK EROSION PROTECTION
CONSTRUCTION EXIT/ENTRY
HA TRAFFIC CLEANING FACILITY
© co—Mee CATCH DRAIN
8 HAY BALE FILTER
LAY TEMPORARY SEQIMENT BASIN
\ HAY BALE FILTERS TO BE SPACED NO MORE t
THAN Sdm APART.
NOTE:-
LOCATION & LEVELS OF ALL EXISTING SERVICES
TO BE CONFIRMED ON SITE BY CONTRACTOR
PRIOR TO THE COMMENCEMENT OF CONSTRUCTION.
IT 1S THE CONTRACTOR'S RESPONSIBILITY TO
PERFORM A DIAL BEFORE YOU DIG SEARCH PRIOR
TO COMMENCEMENT OF WORKS
TOTAL CATCHMENT (Al = 2.76ha
ASSUME > 33% OF SOM < 0.020
CONSTRUCTION PHASE SEQUENCE
Crs 05
‘SETTLING VOLUME {Vs} : we ‘ yy wee a o 1. CONSTRUCT SEDIMENT BASIN, SEDIMENT FENCES ANO DIVERSION BUNDS.
ie
SETTLING DEPTH » 1.0m
2. COMMENCE CLEARING AND CONSTRUCT CATCH DRAINS.
BASIN DIMENSIONS AT BASE {42 RATIO)
A
ed 3. COMMENCE FILLING AND EARTHWORKS INCLUQING COMPACTION,
+ 9.00
bt en &, CONSTRUCTION OF STORMWATER LINES AND GULLIES INCLUDING BACKFILLING AND
COMPACTION.
Vs 2 7220!
STORAGE VOLUME « 0.5 x Vs 5. TURF STRIPS 900mm WIDE SHALL BE LAIO TO BASE OF ALL DOWNSTREAM
comets EARTHWORKS BATTERS - AND THE REMAINDER OF THE BATTERS SHALL BE TOPSOILEO
AND GRASS SEEQED IMMEDIATELY UPON COMPLETION OF EARTHWORKS. AND AT THE
SATISFACTION OF SUPERINTENDENT. EIGHTY PERCENT (80%) GRASS COVERAGE SHOULD
BE ACHIEVEO PRIOR TO REMOVAL. SEDIMENT FENCES 10 SE REMOVED AFTER
CONSTRUCTION OF ROADS
16 minutes
» t6tmaZh
G 209
Q sCeiea SEDIMENTATION NOTES
2 085 L/aec
1. ALL SEDIMENT CONTROL DEVICES (SILT FENCES, SPILLWAYS, ROCK CHECK DAMS) TO BE
CHECKED AFTER ALL MAJOR RAINFALL EVENTS AND RECTIFIED AS NECESSARY
WEIR FORMULA: £00 1 166 x bbY
21.328 UE
3 OPUS /N328 4 0.166)
2 thn
ow 2. (F SEDIMENT WATER IS SHOWN TO HAVE SUSPENDED SOLIDS > SOmg/Lt. THEN THE USE OF
A FLOCCULANT IS TO BE APPLIED AS DIRECTEO BY SUPERINTENDENT PRIOR TO THE BASIN
BEING LOWERED.
GATEWAY
CONVEYANCE, THE BASIN (5 TO BE DRAINED 8Y OPENING THE VALVE OR UNPLUGGING THE END OF THE
CATCHMENT AREA + 2.26h0 OUTLET PIPE. ONCE ORAINED THE OUTLET PIPE WILL BE PLUGGED AGAIN.
2 3 ina ooh THE FIELO TEST IS FILL A CLEAR 6Smm SOFT DRINK BOTTLE WITH BASIN WATER
4 tee Ww NOTE:- IF YOU CAN NOT SEE CLEARLY THROUGH THE SAMPLE, THEN A
Os b93am/n 1 FOR DETAILS OF EXISTING GROUND CONDITIONS FLOCCULANT NEEDS TO BE APPLIED.
WEIR FLOW OEPTH « 196mm . REFER TO: THE PH OF THE WATER MUST BE IN THE RANGE 6.5 to 8.5 PRIOR TO DISCHARGE. (F THE
A) REPORT PREPARED BY COFFEY RESULTS ARE OUTSIDE THESE LIMITS THE SUPERINTENDENT 1S TO BE NOTIFIED AND HE
¢ tae wo GEOSCIENCES No. B17974/01-8 DATED WILL ADVISE ON TREATMENT.
> = 106 08.07.2004 .
wor Flow oePTW TZ 3a}em on BI REPORT PREPARED BY DOUGLAS 3. OUTLET BAFFLE - POSTS t00mm - AT Im CRS SET 800mm DEEP WITH SEDIMENT FENCE
PARTNERS No. 33986 DATED 16.08.2006 FABRIC
2) FOR DETAILS OF METHODOLOGY FOR
PROPOSED IN SITU GROUND IMPROVEMENT OF 4. INLET BAFFLE - POSTS 100mm - AT Im CRS SET 800mm DEEP WITH SEDIMENT FENCE FABRIC
THE UNCONSOLIDATED FILL ON THE SITE, REFER WITH 50mm HOLES CUT AT 300mm CRS
TO REPORT BY LANOPAC TECHNOLOGIES No.
P718-O11A) DATED AUGUST 2007. 5. SEDIMENT BASINS TO BE INSPECTED AT LEAST ONCE EVERY WEEK AND DE-SILTED AFTER
EACH MAJOR STORM EVENT OR AS DIRECTED BY SUPERINTENDENT.
® a 2 x to Som 6. THE FINAL LOCATION OF SILTATION AND EROSION CONTROL DEVICES MAY BE ADJUSTED AS
> ——————————— NECESSARY ON SITE BY THE SUPERINTENDENT.
Chit E1 (Design C.PAUNESCU Client
BMD Structoat troheere © com erainesed BUNNINGS GROUP LIMITED
& Project Manegera *,,” Checked _| P-MALONEY | Project
8 | GeOTECrRNCAL NOTES ADDED oH Fat | 16.10.07 ee... Ag 23 Ora 742 682 eS ~ e BUNNINGS WAREHOUSE NOOSAVILLE
’a_| ISSUED FOR APPROVAL Bx | PM | 12.1007 CONSULTING Aaproved Byc| PMALONEY Foe NOT FOR CONSTRUCTION
‘1 | ISSUED FOR COMMENT cP pa | 08.10.07 srerpaie, munsmne Haga = trata PER NG. | 191572 SEDIMENT BASIN 1 AND Drawing No. Rev
No. Amendmants By Appd Oats | No. Amendments by Appt Cate fended O37, ow tat Fae thay scTs «m8 he (07) 3893 1511 Date 09.10.07 ”
: sTeeconea 1 Oftice Cairns Office
THIS DRAWING CANNOT BE COPED OR REPRODUCED IN ANY FORH OR USED FOR ANY OTHER PURPOSE OTHER THAN THAT ORIGINALLY INTENDED WITHOUT THE WRITTEN PERMISSION OF BHD CONSULTING PTY LT9. Lanny cosine mw 207 wawbadten nd, Phe 181) A759 5585. Pre (97) 4035 HUA] Datum AHO. EROSION CONTROL PLAN CB0849-S001| B
Page 18
1000me SETTLING ZONE
$a0mm STORAGE ZONE
=
SEDIMENT CONTROL BASIN
EMBANKMENT FILL NOTES
1. FILL AREA TO BE STIRPPED OF TOPSOIL AND SURFACE
APPROVED BY GEQTECHNINCAL ENGINEER PRIOR 10 THE
COMMENCEMENT OF FILLING.
2. EMBANKMENT FILL MATERIAL SHALL 8E FREE OF ORGANIC
MATTER, OVERSIZED INCLUSIONS AND ANY DELTERIOUS
MATERIAL SUCH AS TIMBER, STEEL, PLASTIC OR SOIL OF
EXCESSIVELY HIGH MOISTURE CONTENT. THE MAXIMUM
PARTICLE SIZE SHALL NOT EXCEED 1SOmm. FILL TO BE PLACED
IN LAYERS OF 200mm.
3. THE FILL SHALL BE PLACED AND COMPACTED AT OR ABOVE
OPTIMUM MOISTURE CONTENT TO THE FOLLOWING REQUIRMENTS
-MIN DENSITY RATIO 98 % SMOD
-MAX CENSITY RATIO 103% SHDD
-VARIATION OF THE FILL MOISTURE CONTENT 0-2% OF
STANDARD OPTIMUM,
&. THE STRIPPED AREA IS TO GE APPROPRIATELY BENCHED
TO FACILITATE NEAR HORIZONTAL FILL PLACEMENT.
oT | EASTNG RORTHING
6992139.573 [| -40072.221
4992100.03 | -40088.S55
£912136,04 | -60093.963
137,185 | -40108.099
£912156,195 | -40108.109
astars7.219 | -<0086.026
4912156.579 | -40077.236
SPILLWAY WITH ROCK PROTECTION
GEOFABRIC UNDER ALL ROCK
SOO Rene
VALVE END OF PIPE
10 BE OPENED ONLY AFTER BASIN
TESTING. TO BE CLOSEO AFTER BASIN
ORAINEO ITYP)
1
REROOPA Te SEbokte
150@ GALVANISED STEEL PIPE
WEIGHTED BASE
ANTI SEEP COLLAR
Naa Mame: aN tpanay - Lamnadtiog ays cit abn Rapeeal ts \E6- HAS - feanngs Worntoune Noeanedte\? Dravnga -CiXtSt
SEE OETANL UT-OFF TRENCH S00ma MIN OEPTH 1°)
ACKFILCED WITH (MPEAMEAGLE CLAY uree Peat Sita oe OM
AND COMPACTED TO BASE OF SPLLWAY
Tl
NTS.
jms THICK MASS CONCRETE
"ea 2SMPQ
GRATED MESH TOP
TO PREVENT LITTER 70
OUTLET NEEDLE PUNCHED 2
GEOFABRIC a
150® STEEL PIPE RISER
TO TOP OF SEDIMENT
STORAGE ZONE
seen
‘STORAGE
ZONE
4
730
NOTE: CONCRETE SURFACE TD BE FIMISHED AS SMOOTH
AS POSSIBLE OM ALL FACES.
CUT-OFF WALL DETAIL
150® STEEL PIPE
MATCH INTO PROPOSED 1 N 3 BATTER
SEOWENT BASIN DISCHARGE LOCATION
MATCH INTO PROPOSED 1 IN 3 SATTER
1m WIDE BERH
REFER TO
SEDIMENT BASIN
r.
SCALE 1:20
‘| vinasis SCALE #750 (A1
2 et s Design Chen
i BMD ==: O= BUNNINGS GROUP LIMITED
& Project Manegers Choad 7 :
: ee nou 72 00 703 or = BUNNINGS WAREHOUSE NOOSAVILLE
z
3|_4_ | (SSue0 FOR appROVAL Cee CONSULTING Aoprored Br ro MOT FOR CONSTRUCTION
ie | ews | oa ames oy [os saat gees Pe SEDIMENT BASIN 1 aa
} “Amendments iy ate | 0. Townsville Offite Caicns office [OP PLAN AND DETAIL CB0849-£5¢02) A
i THIS CRAWING CANNOT BE COPIED OR REPROOUCEO IN ANY FORM OR USED FOR ANY OTHER PURPOSE OTHER THAN THAT ORIGNALLY INTENDED WITHOUT THE WRITTEN PERMISSION OF BHD CONSULTING PTY LTD Pr $7) 4759 S855 Pr (07) 4635 HE] Date
Page 19
——
A NCE-D4LY - Henn War stovus Nonsanite\? Or means - Grd BEE 91 ESE
wu
Fay ene R\Syonay — Corastogiayt_ cud
nl
SETTLING ZONE—— CENTRE SPILLWAY
pS
| 1
y
FOR DETAILS OF THIS AREA SEE PLANS BY TOD NOOSA CONSULTING ENGINEERS |
25m: CA
——— —4—— OUTLET
i & a PROTECTION
| AREA AS Q
5 NN UW
"2,
3 PLAN VIEW GABION EMBANKMENT
f 2
% SECURE GEOTEXTILE TO GABIONS
‘~ WITH 20MM TO 30MM AGGREGATE
OR OTHER MEANS
25
SEQIMENT BASIN 2x"=]
SEDIMENT STORAGE ZONE NEEDLE-PUNCHED GEOFTEXTILE
SEDIMENT SETTLING ZONE CREST OF SPILLWAY
EE ee fo
——— 0 co
= " + SOOMM . 7 —- "7 OUTLET PROTECTION
—— - | ssamm \_
| TRIRIRIRE
SEDIMENT BASIN | SPILLWAY SECTION NEEDLE-PUNCHED GEOTEXTILE
REFER OWG (€B0849-ESC01 500MM MIN. —
CATCHMENT AREA = 0.40ha DOWNSTREAM ELEVATION
T = 9 minutes
1 = 103mm/h
C2 0.63 .
Q = 7amm/h NOTES:
SETTLING AREA A: 3400 x Q = 265m? 1. REMOVE ALL VEGETATION AND TOPSOIL FROM UNDER THE DAM WALL AND FROM WITHIN, THE STORAGE
SETTLING DEPTH = 0.6m AREA.
BASIN DIMENSIONS AT SURFACE (1.2 RATIO) 2. EXCAVATE TO 300MM DEPTH FOR DAM BASE AND FORM A LEVEL BASE FOR THE GABIONS.
As 275m LINE THE EXCAVATION WITH A NEEDLE PUNCHED GEOTEXTILE ALLOWING SUFFICIENT GEOTEXTILE TO
t 2 Som 3. LINE FROM THE TOE OF THE DAM, UNDER THE WALL, OVER THE UPSTREAM GABIONS AND SPILLWAY TO
D = 0.6m 500MM BELOW THE SPILLWAY EXIT ON THE DOWNSTREAM FACE.
SETTLING ZONE WALL PROFILE AND OUTLET PROTECTION SHALL BE MADE UP OF GABION UNITS FILLED WITH GRADED
D = 0.6m ROCK AS SPECIFIED ON SWMP
Vs = 1h?m &. CONSTRUCT A SPILLWAY SOOMM BELOW THE CREST OF THE DAM AND FOR THE WIDTH SPECIFIED ON
STORAGE VOLUME = 1.0 x Vs THE SWMP.
= Im? S. LAP THE GEOTEXTILE OVER THE UPSTREAM FACE ANDO THROUGH THE SPILLWAY AND FIX IN PLACE
DEPT =_0.55m WITH THE TOP ROW OF GABIONS
6. COVER THE UPSTREAM FACE AND GEOTEXTILE WITH 20MM TO 30MM GRAVEL.
7. PLACE A “FULL OF SEDIMENT” MARKER 70 SHOW WHEN LESS THAN DESIGN CAPACITY OCCURS AND
SEDIMENT REMOVAL IS REQUIRED. :
8. REPLACE UPSTREAM GEOTEXTILE LAYER EACH TIME SEDIMENT IS REMOVED.
a a 16 mM 2 som .
Se ‘
ret +
Alot Date -Ort-BT BEA PM Uner BRAN LLET
SCALE 1:400 1A1}
Chit C.PAUNESCU Client
BMD Fe amet craweesed BUNNINGS GROUP LIMITED
Manegers b P.MALONEY | Project
oe sana 00 103 092 BUNNINGS WAREHOUSE NOOSAVILLE
‘CONSULTING 2] PMALONEY rae NOT FOR CONSTRUCTIO:
Nl
7 [ested FoR POROVAL te | pe tnwe pete, manure head Otfic = Beisbane NPER No. | 191572 SEDIMENT BASIN 2 AND Drawing No Rev
om omni oy | aoe | ow [Re arava oF | fone [ome [rie rar Feasting PON a Law EROSION CONTROL PLAN
THIS DRAWING CANNOT BE COPIED OA REPRODUCED IN ANY FORM OR USEO FOR ANY OTHER PURPOSE OTHER THAN THAT ORIGNALLY INTENDED WITHOUT THE WRITTEN PERMISSION CF BMD CONSULTING PTY LTD. Saeorng Core ete ret we badronna Ph: 07) ATS9 S555. Phy 107) 4035 Aaj Osten AKO. CB0849-€5C03 A
Page 20
Construction Note
1, Rarneve ony crim, de athe o aus hom aurtous bare loyng matting
12 Ueoset te be @ mare Toren mp.
Construction Notes 2 Comers tel meets w Morey seed te mrgy Gmbetw oat pretentin conten,
; . fo grote opacied ane SPAS.
1 te trgiyra 300mm inte gard wrtece shores the vate contacts the sue oet .
uly tenn fa trarcnee te 100 me oboe grove wotoce Ia seaven San ah Laotian some 9 Prvermg s mmcn,
Maeesting.
2, Gomera halt af woley Ip Ines thon mate anavt te guly Moor
A Soren checks ao tis tow of Ihe uattrwom dom is vl with the soiteny of the
pent dowrebeen ore
4 Raver ming aomage to ta Caaterthg nate epentng any ony eget. Fox cnet,
peta oe vice Stee ow Ow aomage maney wot DO Pons ond pelt
ee oe
ROCK CHECK DAM
MOTE: omy ta be vind oy 1 vot
sherk man, upwooe ‘argh Te BO metre
Censtruction Notes
1 Crater grant sone
2 worn wrt beens Dans AAG he BO mares te For te net ot ng pas
2 Drone ts be of porebalie or trapereivel crews eect net Y-sheped, Noes ‘Section AA Sees cuts Org Sere
4 Cot te ta be wtroatity comeneted rr Se prt Soha, Constructior con
1. Got sm fe a ot dus ov nie a poate ts the
Construction Notes © SPER Stabe Sarnia ract eB eon ote rot Construction Notes PRR TS ETT Sum mee reat Os conser
° ae ‘ 1s Carmel sediment fece an Go ou bebe 18 ort te ty canines of to we 2 Powe tae than tre ath we py auling, Une even to
1, 3 tat ne tend te 4 1 mtn om ttt oe te « tne t= de ySutscoey us oun be guna 3 Mekekeoleprrlepicecielalersleaahtond Construction Notes
2 compass eerant + remetae sagen tint woe Oven macetennen See Pe sn 3 Dg [22sec the woven the oF Ihe met fF Be Dat of On a cu onn mettioe enoed wom tay Oia guund Fieve 0 (6dr ond 1. Female @ seomant ner mate rm grolente ree ton
A Comm acne WIN Renda punched qeotantte the vole at Bp be mrbwchat, 1 Iwo 1.2m wior OLAS, Angie the rat stoke & soch Dobe beats the L Dueoert geoterthe with mewn ted to ports epoted of | metre Kewnires,
© Conga bok 3th 6 mitts veto sven wee they we etched 4 Cec eh ore ewe 0 Me Sie ine 0. Be eet tm ae pnd Ee wD Ua Lowen coor tort can queen
4 Cormutt 2mm Dich gd at pote vl vmiban a! sar JOnve ogee Se Ms Ro ‘pe bees
; errs 2 ~ Oe wt meaeting patente te vosion fonts te tne Fa recomend were wg earctns smn om # Gaurd bate the 4 even tte oe her be Stoners eng 4-8 ad 6-7.
ineth 15 ne some siren oi 9 eat 1 Cat para 1a be he of oraclon wot brepdatie Out 6 rome Oy gates mencare, STS ATR aT Se Gs Ss ceonsaee Bom tw te af be ble.
1 Corerat ary tena wth heuer te ro eat to « wrtrmnt ace nee Sin cen of hare ot emer pret aw 150m wort
STABILISED SITE ACCESS CATCH DRAINS ‘SEDIMENT FENCE ‘STRAW BALE FILTER STRAW BALE FILTER TRAFFIC CLEANING FACILITY
BACKING MN
GAYA FABRIC.
REINFORCI FENCE POST (MAX. 10m
wer MESH [ CENTRES)
Seamer garage ~e GEOTEXTIL
INDISTURBED
GROUND,
FALL
g SL
. \ oA
rote Xt mh, < S| mearemet ; 3
: al?
STAR PICKET POSTS
{OR EQUIVALENT)
BRIVEN 500-700mm
(NTO GROUND
Sate 10% 509 5,
Neace-pencheg
ome
cont ory mi wetter tet r
ech ent hs Tone Waite temnete SO IM
Serco tecchaens csater Y bet
apes meaper tran ZHI)
Construction Notes
1. Conatrvet oi gatent a 1 per cant to 3 per cont.
2. sol toring tame and snr If pam.
3. Drains to be af cheer. perebott er ropersidel prone eectlon net Y-snoped.|
Fae gars BAS ~ Conudtoghiyd cot john aginnal Aas\C-t049 - Besmags Warehots Honeardle\T Drowns - Gof ZENCR, OF SE
Construction Notes 4. eth banks te be ademetty commectad ores te prevent eck v
1 cate cite 0 fat 3 mao ten eng tin, eco Construction Notes 3 Rae eisryeay seat ot he oor tem to be comcited OP | eon sas tn adettey cwmsetind Me 16 Srl whe Construction Notes
2 Goveruct nth cuales © oes ct, ranged mound, 1 Seerty gona matace dong W8 tht of ta tintow ts 8 om wf ern tof doom | eer tres ee te Ned hie ¥ sede sasn 1 Pema tacoorey tute of be ar Oo bobs ate wh 1. M tele pied ntl een ony Ue eoninciet,
A Whee there fo nfichent tepsed stockples shot be than 2 metre im tevak wo ony haraeetting murtreas ont prota = good bend between the Pepsi! se men Coe noms * on 10 Sam of corsiraction, 2. Sire topsel ond piece © sence punched bertte Oww the bow of the crossing
-“" on a saad metre mel eet, 7, om coal cotected tom undatureed fonda ante either 9 atantned Mt mato Bateeted lente ws te tent hte ¢ mmtimert [email protected] halen, tei ond wr indehsted Saree’ tlpnt win the wee sbeatchonent Sree eo atech| . - “ te - A Pace Sean agit sen—pettuting 1 grant Damm tp 1S eon
A Raheeaiota bs accordance vith ty SP fee, 2. Aad mot cmetergets n6 reared by the Suir AESOP. The otinetea 1. acrerge nom eatectes Mm wadaturned ange ante iw 4 senent oat ow Sera to's mere eet
2 ctw tam art Dey Sf} tn or 1 Ri to 0 tints of 200m where 0 compacted eye seni © creel te song tetera attr ote yw rand ae ee eee eee ee ee ST a a! ee oe ome GEOTEXTILE, EMBEDDED
met emes tence nae mame foe (Simard vty th 4. ce eos steppge net pepe a peta atm | |S SEL SG ne fare ta mre ft mart ete evar end tn oO eats 200mm INTO GROUND
. 1. cao torts in be Bae of actin water Wemdetn al 2 rege nome fe FENCE.
: WS) '
f STOCKPILES . REPLACING TOPSOIL EARTH BANK (LOW FLOW) ~ EARTH BANK {HIGH FLOWS) TEMPORARY WATERWAY CROSSING EARTH BASIN wer FLOW BARRIER FENCE
i .
: Cie E Design C.PAUNESEU Chont
¥ BMD Struct Engeers ©) Sawn CPAUNESCU BUNNINGS GROUP LIMITED
fanagers sas | Checked | PMALONEY | Project
£ eo. sew p90 10 wae BUNNINGS WAREHOUSE NOOSAVILLE
Si [eum ren arirornt wm [om faan CONSULTING Arp | PMALONEY gy NOT FOR CONSTRUCTION
af [sen Fon corner a Spey rts penn anim 191572 SEDIMENT AND EROSION Drawing No. ‘Rev
s[ ‘Ainendmants ay | Aoed | date | No. Amencimants Sy] Aaed | Pate | remcness Bir. ns 107 Fa TILT a 09.10.07 CONTROL DETAILS
3 THES DRAWING CARNDT BE COPIED OR REPROOUCED IN ANY FORM 06 USEO FOR ANY OTHER PURPOSE OTHER THAM THAT ORKZNALLY NTEKDEO WITHOUT THE WRITTEN PERMISSION OF BHO CONSULTING PTY 170. Doone Qrtrenty re: Euwtacemaa AND. CBO849-ESC04 A
Page 21
| |_|
C8 ome -6 igs C7 es 6 YM}
max a PP 7 I
/
i
§
i
7
SBAITE.
TST
[A seed eo a
lees
%
af ee preenitnss
CONEWDRK____________—}
9
~ = Caneel Oty
a “a
—————
Page 22
PROPOSAL
“In-Situ Ground Improvement -
180-186 Emundi-Noosa Rd, Noosaville
PROPOSED BUNNINGS WAREHOUSE DEVELOPMENT
August 2007
P718-01.1 Issue A
ABN. 12 069 528696 u WNGIPAC
PO BOX 132, SEVEN HILLS, NSW 1730, AUSTRALIA EMAIL: h [email protected] com.au FAX: (02) 9838 8162
Sydney{02) 9838 7044; Brisbane-(07) 3832 7666; Perth-(08) 9421 1644; Melbourne-(03) 9525 5690
DIRECTORS: E J COOK, T R COOK, KT McCANN
Page 23
ye
Ground Engineering Contractors
AUSTRALIA = SOUTH AFRICA ~ EUROPE - CHINA - MIDDLE EAST ~
6 August 2007 Ref: P718AA
The Manager ...
Bunnings Pty Ltd
Level 3 Nexus Building
96 Mt Gravatt Capalaba,
Upper Mt Gravatt
QLD,41 22
Attention: Mr. Paul Pham Email: [email protected]
GROUND IMPROVEMENT .
PROPOSED BUNNINGS | WAREHOUSE~ 180-1 86: Emundi-Noosa Rd.N oosaville’
Dear Sir,
1. INTRODUCTION
Impact compaction has been recommended as a ground treatment means for the improvement
of the existing in-situ Fills for the support of upper level foundations, ground bearing slabs and
external pavements. We understand the 3Ha site is to be developed as a Bunnings
Warehouse..
as
It.is understood that the ‘warehouse building, timber yard and nursery will-be located in the —
. eastern half (Lots 21 and 1), which occupies.an area of about 1.1 hectares. The car park will
be located in the western half (lot 25), which occupies an area of about 2 hectares.
2. INFORMATION PROVIDED
The following information was supplied to Landpac:-
- © Geotechnical Site Investigation Report — Coffey. Geosciences (Ref: B17974/01- B dated 8
“July 2004) -
= Geotechnical Site Investigation Report - Douglas Partriers (Ref: 33984 dated 16 August
2006) .
Site Plan — John R. Brogan & Associates Drg No: 1096-03-P2
* Detail and-Contour Survey - MM PMM Group Plan No. 7050-01 B -
* Bulk Earthworks Plan — Cardno (Qld) Pty Ltd Drg No 3501/54/01-001
The Coffey's site history reported that 5,000m* of fill was placed on the third lower tier of
the planned warehouse area and reported Bore 4 as having 1.1m of Fill: sandy gravel,
clay and gravely clay. However, the more recent Douglas Partners logs in the same area
teported no fill. For the purposes of this proposal we have assumed there is about 1m of fill,
as described above, over the lower tier... .
The Douglas Partners report. summarizes there is up to 1.6m of fill in the southeast third of *
the site and up to about 6m of fill in the reminder of the site. The upper part of the fill is -
reported to be ‘clean fill’ comprising of sand, clay and gravel. The deeper areas are report to
comprise of 25 to 50% of building demolition materials including timber, bricks, concrete,
steel sheeting, wire, plastic, tyres and tree roots. However, test pits 4, 8 and 9 show the
‘building demolition’ material is present from the existing surface.
ABN. 12.069 528 696 _
PO BOX 132, SEVEN HILLS, NSW 1730, [email protected] FAX: (02) 9838 8162
Sydney-{02) 9838 7044; Brisbane-(07) 3832 7666; Perth-(08) 9421 1644; Melbourne-(03) 9525 5690
DIRECTORS: E J COOK, T R COOK, K T McCANN ©
Page 24
| Ground Engineering Gontractars . RUsSTRAUA= SOUTH-AFRIGA- EuROPE~ CHINA- MIDDLE EAST “The contour survey and. bulk earthwork ‘drawings. indicate that. the northern end ‘of the - warehouse building ‘area (lower tier) requires approximately 1.8 to 2.8 metres of fill with approximately 2.5 to 3.5 metres of cut on the southern end of the warehouse building area (upper tier). It appears from the drawings that external car park area will require fill over the northern 4/5 or so ranging from 0 to 1.5 metres on the upper tier and 2 to7 metres in the lower north-west corner. 3. ENGINEERING ASSESSMENT. Building Area us ‘It is assumed that the apparent existing fi fill on the tower tier of the building area is un- engineered and will require impact compaction. Once the ground improvement works proposed below have been conducted, the building structures may be supported on high level footings proportioned for an allowable bearing pressure of 150kPa. A ground floor slab design may be adopted for estimated loads of 20 kPa. The existing and new engineered fill underlying the building area will range in thickness from zero to about. 3m. The estimated post construction total and differential settlement of the pad footings and ground floor slab is about 10mm. ‘ . Car Park Area The fill material underlying the car park area is variable in thickness and composition. The new engineered fill and proposed impact Compaction of the in-situ fill will create a raft - of stiff material which will even out potential differential settlements which are likely to be caused by deep variable fill. Settlement estimates computed by Landpac’s geotechnical engineer show that if 3m of new fill is placed on 6m of Impact Compacted in-situ fill, with an assumed Young’s modulus value of 3:to 5 MPa, a total’settlement of about 50 to 100mm can be expected. The assumed Young's modulus values given to the ‘in-situ fill are very conservative and allow for the variability of the in-situ fill. It is considered that after Deep Impact compaction and placement of new engineered fill it is expected the. proposed car park will perform adequately. 3.1 Ground Improvement Works: Car Park Area It is proposed that once the site has been cleared to: e Place fill(by others) in the north-west corner in one layer to.RL13.5 e Conduct Deep Impact. Compaction with extensive monitoring of the compaction — "settlement on the north-west corner.and’ ‘existing levels prior to the placement of new fill to BEL. e’ Place excavated and imported fill (by others) to BEL ih accordance with AS3798 — “Guidelines on earthworks for commercial and residential developments’. 3.2 Ground Improvement Works: Building Area Iti is proposed that once the site has been cleared to:. ¢ - Conduct Impact Compaction on the areas requiring placement of new fill prior to the placement of new fill to BEL. « Excavate the cut areas and place fill (by others) to BEL in one layer followed by impact compaction « Impact Compact whole building footprint to ensure uniformly stiffened platform : A.B.N. 12 069.528 696 PO BOX 132, SEVEN HILLS, NSW 1730, aroundimprevement@landpsc. com.au FAX: (02) 9838 8162 Sydney-(02) 9838 7044; Brisbane-07) 3632 7666; Perth-(08) 9421 1644; Melbourne-(03) 9525 5690 “DIRECTORS: E J COOK, TR COOK, KT MECANN
Page 25
pore © Ground Eagineering Contractors AUSTRALIA ~ SOUTH AFRICA ~ EUROPE - CHINA - MIDDLE EAST To allow the use of upper level footings the Impact Compaction will need to be applied in an “Engineered” manner. Engineered Impact Compaction involves extensive GPS based monitoring and control of localised compaction settlement and soil response measurement. This is generally used on variable fill sites and allows the identification of localised areas with higher settlement compression and/or deleterious material. Soil- response measurement will also assist _ ‘in the identification’ of weak sub-surface niaterials that may adversely affect footing performance. Impact Compaction applied in an “engineered' manner using extensive settlement ‘and soil response monitoring provides a much higher level of confidence and allows the use of slab-on-ground construction and upper level footings with more realistic design parameters. 3.3 Site Specific Conditions and Discussion Following the clearing of the vegetation, buildings, equipment and rubble on site impact compaction could be applied on: the lower ‘tier of the building area with minor further site preparation. J / : a oo, . . : e The following methodology is proposed:- , oO a i) Site clearing ii) Excavation of cut areas in. building area and placement of fill in north-west corner in one layer . . iii)’ Impact Compaction of existing fill on lower tier of building area =~ iv) Deep Impact Compaction of Car Park area - : v) Excavation of cut areas in building area and placement of fill in fill areas in building area. in one layer : vi) Impact Compaction of whole building pad. vii) Trim building pad to BEL | viii) Importation and placement of fill . Car Park to BEL : With variable un-controlled fill sites, localised soft areas with un-compactable deleterious aac : “ material may become evident during the works. ‘Depending, on the nature and location of the . Soft areas, it may be-necessary to excavate and replace the material with suitable: fi It. This has .not béen-allowed for in the quotation. . . . Airborne dust during the Impact Compaction works will need to be suppressed with a water cart. This has been allowed for in the quotation. . AB.N. 12 069 528 696 - “PO BOX 132, SEVEN HILLS, NSW 4730, “groundimprovemerii@landpac. com.au FAX: (02). 9838 8162 - Sydney-(02) $838 7044; Brisbane-(07) 3832 7666; Perth-(08) 9421 1644; Melbourne-(03) 9525 5690 DIRECTORS: E J COOK, T R COOK, KT McCANN se
Page 26
Ground Engineering Contractors
AUSTRALIA = SOUTH AFRICA = EUROPE ~ CHiINA~ MIDDLE EAST
Ground bome vibrations
‘are generated during the ”
impact - compaction
woiks, It is expected that’ ji
the vibrations induced
during the impact
compaction will not
adversely affect the
adjacent structures.
Nevertheless as .a
precautionary measure it
is recommended . that
’ vibration monitoring” be
conducted at the
commencement of the
works to provide
confirmation to . " . “
concemed parties that induced vibrations are within the recommended control limits. This has
been allowed for i in the quotation. ‘
3.4 Monitoring ; and Control of Deep impact Compaction
_ The process. of transforming. uh-enginéered fills to “engineered fills” and the. in-situ compaction
_ Of soils using impact compaction requires that the process be applied i in “engineered” manner
which requires adequate control and monitoring of the works.
To adequate monitor and control the compaction of in-situ soils, Landpac principally utilizes
GPS and computerised systems to ‘measure and record the sub-grade stiffness (stiffness
increases with densification) and compaction settlement. Landpac’s monitoring systems (viz:-
CIR & Diffsett) provide total control of the impact compaction works (during impact compaction)
: thereby providing documented quality: control of the works,
CIR(Soil Response Monitoring) Description
Landpac’s CIR system records the areas subject to impact ‘compaction and measures the
relative stiffness of the sub-grade to a depth of. approximately 3 metres at intervals during
impact compaction over the whole compaction area. It-indicates areas with lower compaction
levels or weaker subsurface material.
The Continuous Impact Response (CIR)
technology . measures the deceleration
rates of the impact drum Lassembly. ”
As the density. and sub-grade. stiffness
increase with compaction, the deceleration
rates of the impact compactor drums
increase (See Figure 1).
Figure 1: Illustration-Deceleration
: : / “with Compaction ~ :
A.BIN. 12.069 528 696 :
PO BOX 132, SEVEN HILLS, NSW 1730, [email protected] FAX: (02) 9838 8162
Sydney{02} 9838 7044; Brisbane+07) 3832 7666; Perth-(08) 9421 1644; Melbourne-(03) 9525 5690
DIRECTORS: E J COOK, T R COOK, K T McCANN
Page 27
5 eS Ground Engineering Goniractars a AUSTRALIA - SOUTH AFRICA EUROPE ~ China = MIDDLE EAST . : 5 . ‘The measured g-values are integrated with co- ordinates using GPS technology. The data is produced in a colour plot(See Figure 2), which is superimposed over the site layout: Areas with - . inadequate. compaction levels can be located*~ and subject to further compaction or designated as ‘soft areas requiring remediation if necessary. The CIR will also assist in the control of pore pressures ‘during, compaction. ° “Figure 2: Example of CIR Plot Diffsett (Continuous Induced Setttement Monitoring) Description : , @ Landpac’s “DiffSett” system is a differential GPS and software tool that measures and records the surface levels at- approximately .2m intervals on the “run” (during impact compaction) thereby increasing: Plant utilisation: ‘and providing documented quality : Control of the works. , Site at pass (n+k) 3.5. Geotechnical Testing & Verification’ . Geotechnical testing is required. following the completion ofthe ground treatment works to | ‘confirm the improved soil parameters and bearing capacities and provide design parameters. To facilitate the use of upper level footing foundations and slab-on-ground construction and give appropriate pavement design parameters the use of geotechnical testing techniques that will identify Spatial variation across the building footprints will be required. Landpac proposes in this instance using MASW (Multi-channel Analysis of Surface Waves) testing. This: testing will provide stiffness profiles throughout the depth of the fi ll along continuous lines. The Proposed post compaction testing will thus consist of:- - . " Pre and Post compaction MASW (Multichannel Analysis of Surface Waves), and = Post compaction CPT (Cone Penetration testing) in the building area, : A.B.N. 12 069 528 696 PO BOX 132, SEVEN HILLS, NSW 1730, groundimprovement@landpac. com.au FAX: (02) 9838 8162 Sydney-(02) 9838 7044; Brisbane-(07) 3832 7666; Perth-(08) 9421 1644; Melbourne-(03) 9525 5690 DIRECTORS: E J COOK, TRCOOK, K T McCANN :
Page 28
Ma. ,
Ground Enginéering Contractors
AUSTRALIA - SOUTH AFRICA = EUROPE - CHINA MIDDLE EAST
It is estimated that the ground treatment works (including geotechnical testing) will take with the
use of one Impact Compactor the approximate periods shown below for completion excluding
delays caused by inclement weather or site stoppages:-
= Building Area: ~ 2 weeks
_ = Car Park Area: 3 weeks
Should you- ‘fequire further clarification or wish to discuss the above further please do not .
hesitate to contact the undersigned.
For and On Behalf Of LANDPAC
Kevin McCann pip. eng. mBA,FAICD
A.BN. 12 069 528 696
PO BOX 132, SEVEN’ HILLS, NSW 1730; ‘groundimprovement@landpac. com.au FAX: (02) 9836 8162 -
_ Sydney{02y 9838 7044; Brisbane-(07) 3832 7666; Perth-(08) 9421 1644; Melbourne-(03) 9525 5690:
DIRECTORS: E J COOK, T R COOK, KT McCANN.”
Page 29
” Ground Engineering Contractors ‘AUSTRALIA - SOUTH AFRICA - EUROPE - CHINA MIDDLE EAST , Page | of 2 QUOTATION: P718AA-01. GROUND IMPROVEMENT WORKS "PROPOSED BUNNINGS WAREHOUSE- 180- 186 Emundi- Noosa Rd, Noosaville ‘Based on the aforementioned we are pleased to provide a quotation for the grounds. improvement on the above site. 1. Site establishment including mobilisation, float charges and de-mobilisation. It excludes the provision for access to the site, site amenities, security and signage, Water management and Sediment controls, Waste management, traffic management, rehabilitation _ management and fire management. . "ePrice (inclusive of itein1):° $8,600.00. 2. BuildingArea: os oo, 7 e 2.1. Generate. Site Management Plan for the ground treatment works including Environmental and OH & S controls. 2.2. Perform Impact Compaction on the in:situ fill over the. car park area. - 2.3. Conduct an assessment of the Vibrations induced by the Impact compaction works : 2.4. Control and Monitor the Impact Compaction works using, a CIR system and, the . regular measurement of incremental.induced settlements. . __ 2:5. Dust suppression during the impact’ compaction works. : 2.6. Conduct geotechnical’ testing of the compacted. sub-grade and provide a .geotechnical report confirming suitable compaction of the in-situ fill and new placed fill . for footing bearing capacity of 150kPa and slab design loadings of 20kPa and post _compaction settlements. .© Price (Inclusive of items 2 1 to 2.6): . $87,780.00 3. Car Park Area: » 3.1. Generate ' ‘Site’ Management | Plan for the grourid. treatment. works including : -'’ " Environmental and OH’& S controls. 3.2. Perform Deep Impact Compaction on the in-situ fill as recommended. 3.3. Conduct an assessment of the Vibrations induced by the Impact compaction works e@ . 3.4, Control and Monitor the Impact’ Compaction works using; a CIR system and; the - fegular measurement of incremental induced settlements. 3.5. Dust suppression during the impact compaction works. 3.6. Conduct geotechnical testing of the compacted sub-grade and provide a ‘ geotechnical report confirming the Suitable compaction ‘of ‘the in-situ fill and provide . sub-grade design. parameters. ° aa . ae . = Price (Inclusive of items 3.1 to 3. 8) . $132,500.00 ABN. 12069528 696 ' PO BOX 132, SEVEN HILLS, NSW 1730, groundimprovement@landpac. com.au FAX; (02) 9838 8162 Sydney-(02) 9838 7044; Brisbane-(07) 3832 7666; Perth-(08) 9421 1644; Melbourne-(03) 9525 5690 DIRECTORS: E J COOK, T R COOK, K T McCANN
Page 30
Ground Fagineering Gontractors AUSTRALIA - SOUTH AFRICA = EUROPE ~ CHINA - MIDDLE EAST , Page 2 of 2 The above is all inclusive of: - provision of all plant and equipment with experienced operators, and supervision of the works. . The following assumptions have been made: ¢ No material will'be required to be imported onto or exported off site by Landpac. . Existing services (if any) on site will be identified and readily marked i in the compaction areas, No allowance has, been made for the following: - Should you require further clarification, pléase do not-hesitate to contact the undersigned. This - quotation: will remain: valid for 60:days: Rates and payments are subject to 10% GST and. are « Any works to existing services . Site preparation Excavation and backfilling of areas with deleterious material - Disposal of Contaminated, Unsuitable or Excess Soil. Bulk Earthworks. - payable within 30 days of invoice to Landpac’s offices. For and On Behalf Of, LANDPAC TECHNOLOGIES PTY LTD Kevin McCann pip. Eng. MBA, FAICD . Date: 6 August 2007 A.B.N. 12 069 528 696 PO BOX 132, SEVEN HILLS, NSW 1730, groundimprovement@landpac. com.au FAX: (02) 9838 8162 Sydney-(02) 9838 7044; Brisbane-(07) 3832 7666; Perth-(08). 9421 1644; Melboume-(03) 9525 5690 _ DIRECTORS: EJ COOK, TR cook, KT. McCANN
Page 31
Douglas Partners M Geotechnics - Environment + Groundwater REPORT , on , , - GEOTECHNICAL INVESTIGA TION PROPOSED BUNNINGS WAREHOUSE _ EUMUNDI-NOOSA ROAD, NOOSAVILLE prepared for BUNNINGS GROUP LIMITED Project 33984 16 August 2006
Page 32
Douglas Partners Geotechnics - Environment - Groundwater REPORT — yOMm oo . GEOTECHNICAL INVESTIGATION PROPOSED BUNNINGS WAREHOUSE | EUMUNDI-NOOSA: ROAD, NOOSAVILLE prepared for _ BUNNINGS GROUP LIMITED. Project 33984 16 August 2006 Douglas Partners Py itd 439 Montague Road ABN 75 053 980 11 WEST END QLD: 4101 Phone (07) 3237 8900 ” Fax (07) 3237 8999 ‘[email protected]
Page 33
(/)} Dougias Partners Goatrchess - Cevraarsnd Oren TABLE OF CONTENTS 1.0 INTRODUCTION... 2.0 SITE DESCRIPTION ..sssscsssssssecessssssssssonsessesssscsuessssssssoneseneneee scnscccessecees 1 3.0 GEOLOGY aresscsnssee strnsteesenqceneestenacneesuomimanenaniines seeesene 2 4.0 FIELD WORK METHODS -sscaecssereseensenitacnsnsenvencneseee 5.0 FIELD WORK RESULTS..ssssssocnnesnsntrunnueinunnnemnenentnnenene 3” 6.0 LABORATORY TESTING... 7.0 COMMENTS 7.1 Proposed Development . 5 7.2 ‘Ground Conditions.. 5 _ 7.3 Site Classification 5 7.4. Excavatability.......... ; : 6 7.5 Reuse of Excavated Materials and Workability .... 6 '.7,.6 Site Preparation and Fill Compaction.. a7 7.7 Batter Slopes 7.8 Settlement of Controlled Filling . 7.9: Footings........... 7.10 Retaining Walls. . 7.11 Pavements and Slab on Ground.. 12 7.12 Erodibility'and Erosion Control.. 7.13 Earthquake Site Factor Attachments: Drawing 1 - Test Location Plan Test Bore & Test Pit Report Sheets (Nos 1 to 22) Notes Relating to This Report Laboratory Report Sheets CSIRO Guidelines (BTF 18) Report on Geotechnical investigation Proposed Bunnings Warehouse, Eumundi-Noosa Road, Noosaville Project 33984 16 August 2006
Page 34
1} Douglas Partners Ovslecknica » Eavreensenl- Srounewaiay SAPVARM/ag(serv) Project 33984 16 August 2006 REPORT ON GEOTECHNICAL INVESTIGATION ’ PROPOSED BUNNINGS WAREHOUSE EUMUNDI-NOOSA ROAD, NOOSAVILLE 1.0 INTRODUCTION This report presents the results of a geotechnical investigation carried out for a proposed Bunnings Warehouse to-be located at the corner of Eumundi-Noosa Road and. Gateway Drive, Noosaville. _ The’ investigation was undertaken at the’ request of the developer, Bunnings Group Limited.. The investigation comprised eight test bores ‘and fourteen test pits, followed by geotechnical laboratory testing, engineering analysis and reporting. The objectives of the investigation were to investigate ground | conditions’ at the site and report on: subsurface conditions including groundwater; shrink swell movements, settlements, site classification, reactive soils site management; earthworks, site preparation, unsuitable soils (indicative depths), ground. treatment options for uncontrolled fill (particularly. in place treatment options), stripping, compaction requirements for ‘existing and new. imported filling, quality of ‘new fill.and constraints-on use/suitable uses, excavation, temporary and permanent cut and fill batter slopes, reuse of cut for fill, erodibility and erosion control; suitable foundation types and design pressures for foundations; earthquake site factor to AS1170.4; retaining wall design parameters, and; pavement and slab on ground design parameters (ut excluding pavement design). 2.0: SITE DESCRIPTION . The site, located.at the corner of Eumundi-| Noosa Road and Gateway Drive, is irregular in shape, with an approximate total plan area of 28, 000m’, and is bounded to the west by Gateway Drive, to the south by Eumundi-Noosa Road, to the north by vacant: residential land, and to the east by existing industrial/commercial land. The site comprised Lot 25 on SP151406 (to the west), Lot 21 on RP867627 (to the east),: ‘and. Lot 1 on RP133192 (between Lots 25 and 21 adjacent to Eumundi- Noosa Road). At the time of investigation, Lot 25 on SP151406 was in use-as a landscape supplies yard. The lot was occupied by small concrete block shed and numerdus stockpiles of soil upon a fill piattorm, with a densely vegetated area beyond to the north. A large stockpile of topsoil and. organic matter. (material not from this site) approximately 3.5m in height occupied the north-west corner of the site. The ground’ surface was generally level across the site (with the exception of the stockpiles around Aleport on Geotechnical Investigation Project 33984 Proposed Bunnings Warehouse, Eumundi-Noosa Road, Noosaville 16 August 2006
Page 35
(1)] Dougtas Partners. :
Page 2
the site), and was approximately 2.0-2.5m lower (ie. in cut) than Eumund- Noosa Road in the south
of the site, and approximately 6.0m (ie. in fil) above ground surface levels of Gateway Drive to the
west, and residential land beyond to the north. The ground surface-of the fill platform was generally.
covered in sand, gravel and clay filling (probably from pre-existing soil stockpiles), with ripped
topsoil filling across the surface towards the north. .
Lot 21.on RP 867627 was in use as a storage yard for a civil contracting company. ‘The ‘ot was
’ divided into three tiers, with the highest tier sloping downwards (at appromimately: 1V: 25H) to the
north from Eumundi-Noosa Road, and occupied by a grass lawn, lowset building and workshop. The
second tier was generally level, and was cut approximately 1m below the northern edge of the first
tier. The third tier was generally level, and was cut approximately 1.2m below the northern edge of
the second tier. The first tier comprised approximately one of the area of Lot 21, with the second
and third tiers comprising approximately 10% and 40% Fr Gpecivey An access road ran ‘along the
eastern boundary between the three tiers. The ground.Surta face of the tiers was generally covered by
gravel filling and exposed natural silty clay. Construction 8 Equipment. and materials were placed
around the periphery of the lot boundary and the,bérich of eachitier.
Lot 1 on RP133192 was occupied by a commercial building. T Mround su surface was generally
level, and approximately 0.5m lower thansEumundi-Noo: ajRoad. ©
3. 0 GEOLOGY
Reference to the Geological 6 of Queei Is 1: 40,000 series Laguna Bay Geological Map
indicates the site is underlain Bnet Myrtle Creek Sandstone formation typically comprising
i iglomerate, “minor carbonaceous shale and coal”. |
=e
“sandstone, shale, oi d
The natural’ ground conditions e@ counter’ in the’ investigation are consistent with the regional
geology. a
4.0 FIELD WORK METHOD: f
The field work was undertaken during July 2006 and comprised the excavation of fourteen test pits
_ (designated Pits 1 to 14) and eight test bores (designated Bores 15 to 22).
The'test pits were excavated within Lot 25 (SP151406) using a 25+tonne excavator to.a maximum of
6.3m depth. Strata identification was undertaken through observation of pit sidewalls and returned
excavated spoil at the surface.
The test bores were drilled within Lot 21 (RP867627) with an [D3300 trailer-mounted drill rig using
100mm diameter solid flight. auger. techniques to a maximum depth of 7.92m. Standard penetration
tests (SPTs) were undertaken at selected locations in the bores.to provide an indication of soil
strength and to provide samples for visual identification and laboratory, testing. Disturbed and
undisturbed 50mm diameter tube samples were collected from selected strata for identification and
laboratory testing. At the completion of drilling, the bores were checked for groundwater seepage
and then backfilled with dril! spoil. Strata identification was undertaken through observation of auger
cutting returns, recovered samples and disturbed samples.
The test locations. were set out with reference to existing site features with reference to aerial
photography. Test locations were recorded using a handheld GPS unit, and ground surface levels at
Report on Geotechnical investigation . Project 33984
Proposed Bunnings Warehouse, Eumundi-Noosa Road, Noosaville . : 16 August 2006
Page 36
¢/)] Douglas Partners
Page 3
each test location inferred from a site survey drawing. Approximate test locations are indicated on
Drawing 1 attached.
‘Al field work was undertaken in the presence of a geotechnical engineer who -positioned test
locations, logged test: pits, and collected soil samples, and a senior geotechnician who logged the
bores and-collected soil samples.
5.0 FIELD WORK RESULTS
The subsurface conditions observed in the. test bores and pits are described in detail on the test
bore and test pit report sheets attached, together with notes, defining the classification methods and
descriptive terns used. :
In summary, the subsurface coriditions ‘generall compristiyuncontroted filling overlying silty
sand, then slity clay, claystone and siltstof ne? The sub: uptace conditions encountered are
summarised on Figures 1 and 2 following and ated ther >
Building Area (Bores 15 to 22)
. Filling: Filling in the val pies in the f tg ilding area was encountered to 0.15m depth and
comprised loose gravel, ably pl csor traffigability. This filling is assumed to be
‘uncontrolled’ in the absé ecords indicating, otherwise, although it appears moderately
. well compacted.
fee Silty Sand: Gefprall Sito loose tog aes dense ‘silty sand, possibly representing a former
subsoil layer (difectly beléw,topsoil)yin Bo! eSy15, 18 and 19 to depths of 0.45m to 0.6m.
ee ol
° Silty Clay: + Stiff to verysstiff silty, clay (but firm to stiff to 0.9m depth in Bore 20) grading to very
stiff to hard with depth nee en Sintered i in all bores and extended to the termination of Bore
16 at 6.45m depth and to depths:of 2.4m to 5.7m in the remaining bores.
. Claystone and Siltstone: Extremely weathered, extremely low and very low strength
‘ claystone and. siltstone was, encountered below the. silty clay and continued to termination: ‘of
the bores at 6.24m to 7.92m. . .
Free groundwater was encountered at 4.0m depth in Bore 15, 16, and 18, but was not observed in
any other bore. It should be noted that groundwater depths and’ ground moisture conditions are
affected by climatic conditions and soil permeability, and will therefore vary with time.
Carpark Area (Pits 1 to 14)
. Filling: Filling in the pits was encountered to depths of up to 1.6m in Pits 1,2, 3, 5, 6-and 7 in
. the soutti east: third. of the site, and to depths of up to 6.0m in the remainder of the test pits in
the north west two thirds of the site. It is noted that the depth of fill is likely to be larger in the
north west part of the site where an existing topsoil stockpile precluded access for testing.
Where the fill was shallow, and the upper part of some of the deeper areas of fill, the material
comprised.poorly compacted ‘clean’ fill comprising sand, clay and gravel. Where deeper, the
fill was poorly compacted and included significant content (up to an estimated 25% to 50%) of -
building demolition materials including timber, bricks, concrete, steel sheeting, wire, timber,
Report on Geotechnical investigation =» " : Project 33984
- Proposed Bunnings Warehouse, Eumundi-Noosa Road, Noosavite . : , 16 August 2006
Page 37
11] Sougtas Partners Page 4 plastic, tyres, as well as tree roots. Hydrocarbon odour was detected in Pit 4. The fill is evidently: ‘uncontrolled’. . . a . . Silty Sand/Silty Clay: Generally loose to medium dense silty sand.or firm to stiff silty clay, - representing a former topsoil or subsoil layer was encountered to thicknesses ranging up to 0.6m in Pits 1, 3, 7 and 11, but not in the other pits. : . : . Silty Clay: Stiff, and stiff to very stiff silty clay was encountered in all pits and extended to termination of Pits 1, 3; 4, 8 to 10 and 12 to 14 at depths of 3.3m to 6.3m. In the remaining pits (Pits 2, 5 to 7 and 11) where the overlying fill was typically shallow, very stiff to hard clay was encountered to termination of the pits at depths of 7.8m to 3.7m | No ‘free groundwater was encountered in thé pits outs? excavation. It should be noted: that groundwater depths and ground moisture conditions €fe*aftected by climatic conditions and soil permeability, and will therefore vary with time. Elevated levels, including perched groundwater, could be expected in the fill and underlying silty s4ni@ layer, during.or after periods of wet weather. 6.0 LABORATORY TESTING Laboratory testing was carried. out on séléctéd, samples,recovered’ during the -field work and comprised shrink swell index teSisemersoneclassatests ait, soaked. CBR tests. The test report sheets are appended to this. répért, and,are s farised in thie following tables. The soaked CBR samples were remoulded to a cijedensilfratio of98% (relative to standard compaction) at close to optimum moisture cont id soakeds6éfour daySiynder a 4.5kg surcharge prior to testing. able 1 — Summary’6f-Shrink Swell Tests Bore ‘Depth “& Desctiption | ae Swell | Shrink | - Pocket No (m) age (%) (%) Swell Penetometer . Index Tests on Swell (%) Samplte (kPa) Before'| After __ : : . : ‘Test. Test 16 1.5-1.95m_| Silty Clay 1.5 -0.2 08 . 300 280 _ 20 1.0-4.45m_| Silty Clay 16 0.3 1.0 >600 550 The plasticity result indicates the sample is of low reactivity and softens slightly on soaking. Table 2 - Summary of Emerson Class Tests Bore/Pit Depth (m) Description Emerson Class No. : _ Pitt 0.5-0.9m Silty Clay Filling - 6 “- Pit2 "| 0.15-0.2m Gravelly Clay Filling “6 Pit 5 0.2-0.5m Silty Clay — _6 Pit7 0.2-0.8m Silty Clay Filling 6 Bore 15 1.5-1.95m Silty Clay 6 Bore 17 1.5-1.95m : Silty Clay 6 Bore ‘19 1.5-1.95m Silty Clay 6 Bore 22 1.5-1.95m . Silty Clay 6 The results of the Emerson class tests indicate the samples tested are of slight dispersivity. Report on Geotechnical Investigation | . " Project 33984 Proposed Bunnings Warehouse, Eumundi-Noosa Road, Noosaville : a 16 August 2006
Page 38
(a Douglas Partners Gestechals - Eeviresecd Crewetuctiar Page § Table 3 - Summary of Compaction and CBR Test Results . Optimum Maximum Pit Depth Moisture Swell. CBR No. (m) Description Oe Content | (%) (%) (%) 1 0,5-0.9m Silty Clay Filling ‘1.68 21.2 1.7 40 0.2-0.8m _ Silty Clay Filling 1.61 21.5 27 . 3.0 7.0 COMMENTS 7A Proposed Development Information provided by Bunnings indicates that be the development i is to comprise the construction of a Bunnings Warehouse, comprising a part mas , part metalgc clad, slab-on-ground building with -associated outdoor covered retail areas, as Wal ies driveways andJarge areas of carparking. The site slopes down to the north and north west, and: dup J to. 5m to ye fill and locally upto 10m, including a large. quantity of imported filiais required jorm a level Building platform. Details of ‘ proposed retaining walls, if any, are not known 7.2 Ground Conditions The subsurface conditions, as ed eviouslysi ve teport, generally comprised: . ‘uncontrolled’ c Balen sand ands fravel filling with significant demolition material and some hydrocarbon e@h srt ion nee _*. anold topsoivsi oi of silty'sand orm to stiff clay, up to 0.6m thick; « . Stiff, very stiff SR resi sual clays “encountered: in th iiding area only, ontomely weathered, extremely low and very ‘low strength claystone and'siltston a : 7.3 Site Classification Site classification of foundation soil reactivity in accordance with AS 2870-1996" strictly only: applies to residential footings and not to commercial or industrial buildings. Such classification, however, provides an indication of the propensity of the ground surface to move with seasonal variation in moisture, and has been used (along with general climatic zoning and general éxperience) to assess the potential depth: of seasonal cracking and potential for softening under, soaked conditions. Due to the large depth of uncontrolled filling present, the site would be strictly Class ‘P’ (problem site) requiring design by engineering principles (i.e. prescriptive AS2870 designs would not apply for a house). The shrink-swell index values obtained in the laboratory testing were input into DP’s in-house program ‘REACTIVE’, to calculate the characteristic surface movement value (y,) in general accordance with AS 2870. It should be noted ‘that AS 2870 provides recommended values of change in suction (Au) and depth of suction (H,):for major and-regional centres: throughout Australia. Based on previous experience i inthe general area and on. published’ data by Fox’, relating climatic ' 24s 2870-1996 Australian Standard “Residential Slabs and Footings - Construction’ Standards Association of Australia, ? Fox E, “A Climate-Based Design Depth of Moisture Change Map of Queensland and the Use of Such Maps to Classify Sites Under AS 2870 19967 Australian Geomechanics, Vol 35, No 4, December 2000. Report on Geotechnical Investigation . Project 33984 Proposed Bunnings Warehause, Eumundi- ‘Noosa Road, Noosaville . 16 August 2006
Page 39
€)) Dougias Partners
Gusirsteis-Exckvonre-Creestver .
Page 6
conditions to suction, a value: of 1.2 pF was .adopted for ‘Au and 1.5m for H, in the ‘REACTIVE
calculations. A cracking depth of 0.5m was used. in the analysis, based on 0.33Hs. /
The results of the analysis indicates that the shrink swell: movements in response to seasonal
“moisture variation are.estimate to be:10imm to 20mm,.consistent.with a Class ‘S’ slightly reactive
site.
As mentioned previously, whilst site classification in accordance with AS 2870 strictly only applies to
- residential and not industrial structures, it serves to indicate that care is required in design,
particularly regarding the use of brittle materials such as brickwork, blockwork. and tiles. It is
important that adequate articulation jointing is allowed tor in design, that adequate.site maintenance
is carried out in accordance with BTF 18°, and that all works are designed to minimise soil moisture
content change.
It should be noted that any proposed cut and fill earthworks Thay’ result in the building being partly
founded ori natural clay and: partly on either cla As) imported engineered filling: It is recommended
that structures straddling the cut to fill boundary‘of, the proposed plattorm be founded in materials of
similar strength and compressibility, unless adequa e articulation and‘joint detailing is allowed for in
the structure, to accommodate potentialtdifferential "S6ttléments. Comments on settlement of bulk
filling later in this report should.also be noted design.
7.4 Excavatability
riet ulk excavation to form the. building pad as well
recompaction of existing uncontrolled fill, as well .as
as possible excavati 1 attic
iontot fo tation 5, pavements and underground services.
localised excavations {
Based on the conditions’ encount®red to the depth of the test bores, it is estimated that bulk
excavation may be undertaken by ‘tedium “sized excavation plant, such as a 25-30t hydraulic
excavator, for cut in existing filyand Very stiff and hard and weathered claystone and siltstone. of
extremely low or very low strenigthé Where claystone and siltstone rock stronger than very low
strength is encountered (if anywhere), excavation rates will be slower and may require the use of a
. ripping tyne or pneumatic rock breaking tools, particularly in confined excavations.
It should be-recognised that the above éxcavatability estimates are based on materials encountered
at test locations only and that conditions may prove more difficult (or easier) for excavatability
between and beyond these test locations.’
7.5 Re-Use of Excavated Materials and Workability
From the results of the test bores, it is concluded that the majority of the clay and existing clean
“uncontrolled” filling materials won from excavation at the site will generally be suitable for re-use as
bulk filling. Such re-use is contingent-upon particle size distribution being controlled along with
moisture content, and upon minimum: placement and compaction’ requirements being met, all as
indicated in this report. Sorting ‘of the fill containing demolition material (typically encountered in the
areas of deeper fill) will be required to remove potentially deleterious material or material that will
inhibit effective compaction, such as timber, tree roots and other organic matter, particles over
250mm that cannot be broken down or crushed .and larger metal objects. Existing bricks, blocks and
° BTF 18 “Foundation Maintenance and Footing Performance: A Homeowner's Guide", CSIRO 2003.
” “Report on Geotechnical investigation " Project 33984
. Proposed Bunnings Warehouse, Eumundi-Noosa Road, Noosaville. not . _ 16 August 2006
Page 40
(14)] Dougtas Partners
Page7
concrete could be reused provided they are crushed to suitable particle size and are blended with
soil materials.. Hydrocarbon contaminated soils (as encountered i in Pit 4) should be appropriately
remediated or spoiled (if allowed).
The fill moisture content could be well outside suitable placement moisture, and significant moisture
conditioning will be required, with careful control and observation by experienced geotechnical
personnel. Care should be taken not to over-wet any high plasticity clayey soils which can'lead to
problems associated with trafficability and workability. Clay soils should not be over-compacted (ie.
-not more than 102% Standard) and dry of optimum as this can lead to future swelling and softening
under changes to moisture content or inundation from water.” ."
Where. clay soit’ is reused as engineered filing, it. is ; recommended that the: final platform ‘be
completed with a minimum of 150mm of imported, low plasticity, clayey granular material (minimum
CBR 15%) to reduce the effects of seasonal moisturétehan Je and foundation soil reactivity under
buildings, to reduce the pavement gravel thicknesses and iftiprove pavement life, and to improve
surface trafficability particularly during or after pefio ods, of wet weather.
7.6 Site Preparation and Fill Compaction
The approach to subgrade preparation intareas of deep, uncontrolled fill will depend on tolerable
. settlements. In the area of the building whe heuncontoled filtis shallow, the existing fill should
‘be excavated and recompactes “ont replaced.with seléct gran ilar fill as described later in this section
of the report.
In pavement areas ther fevare areastofi 30 Bppoorly\eo mpacted uncontrolled fill that contain some
deleterious materialshe seitlements ee ype, of fill cannot be reliably predicted, however as a
guide, total settlementsef up to%8% of filltthickness occurring over.a 20 year period could oceur in
relatively clean fill, with pogsible large differégtial, settlements where looser pockets occur in the fill.
The clayey fill appears dry, and larger ler ‘collapse’ type settlements could also occur when the fill
becomes wet, Where: there arek init organic materials present, larger settlements will also be
experienced, . es
There are'several options that could be considered for areas of deep fill as follows;
. Option 1 — Low Risk: Remove and sort the uncontrolled. fill to remove unsuitable materials
(such as timber, metal and deleterious, soft, wet or highly compressible material or topsoil
material rich in organics or root matter), and reinstate the excavation with the ‘clean‘ sorted fill
compacted in layers. Inert building material such as bricks and concrete could be reused by
blending with soil fill provided they break down (or are crushed) to a maximum particle size of
-- 75mm. Total settlements of the fill of the order of 1% of fill thickness could be expected over a
20 year petiod, with very small to negligible differential settlements (except those associated
with fill depth). It is estimated that in the lower fill, up to 25% to 50% of material would be
unsuitable, but depending on practicality, of sorting the material, a large part of the lower
levels of the fill may need to be spoiled. : .
. Option 2 — Very High Risk: Excavate existing uncontrolled fill to 2m below design subgrade
level, proof roll and compact the subgrade, removing and replacing and any soft or wet areas,
then reinstate to design subgrade level with clean select fill compacted in layers. This option
will partially reduce total settlements and assist with reducing differential settlements, although
.. Settlements will still be a similar order of magnitude to those for the existing uncontrolled fill.
Report-on Geotechnical investigation Project 33984
Proposed Bunnings Warehouse, Eumundi-Noosa Road, Noosaville 16 August 2006
Page 41
pavement Subgrades, except as indit; “1)) Dougtas Partners “Page 8 * This option would only typically be suitable where large settlements could be tolerated (e.g. unsealed hardstand areas). Option’ 3 — High Risk: Similar to option 2, but after excavation to 2m below design subgrade, treat the subgrade using Landpac deep impact compaction to remove some of the settlements from the remaining underlying fill and then reinstate to design subgrade’ using compacted fill. This technique will remove significant voids from the uriderlyinig fill and thereby reduce the potential for collapse type settlements. Previous experience using this technique has removed up to 200mm of future’ settlement from deep uncontrolled fill. Previous experience also indicates that the lightweight ‘Broons’ square roller (sometimes promoted for this purpose as a low cost alternative), would not remove sufficient settlements i in this particular case. Table 4— Estimated Fill Settlements Material : Estimated Possible Order of Magnitude of |@, Long Térm Settlements for 6m of Fill Option 1-- Remove, sort and recompactél; Up to:60mm existing fill” A Option 2 — Excavate 2m, reinstate with sorted AL Up to Sooqim or more* controlled fil : Bn. ' [Option 3 — Excavate Om, treat with iC - Up to 150mm* Limpactor, reinstate with sorted controlled TiN | "material ich in organics or ro a Ds, Note: * but higherWwhere highly, déléterious materials exist at depth . Remove any, ‘uncontrolied’gor dele jous, ‘Sot, wet or highly compressible material or topsoil Where clayey soils areXencountered at formation level, assess moisture contents, which should be adjusted so they rerifythe range OMC -2% (dry) to OMC +2% (wet), where Omc i is the optimum: moisture content'at'Standard compaction. : Test roll the complete surface of the subgrade beneath the proposed embankment pad or pavement, in order to detect the presence of any ‘soft or loose zones, which should be excavated out and replaced ‘with approved filling. Test rolling should be carried out with a . smooth drum roller with a minimum, Static weight of 8- tonne. Compact the tyned natural foundation soil to a minimum density index of 80% (sands) 0 or minimum dry density ratio of 97% Standard (clays). Any controlled filling should be adequately keyed into natural residual slopes (if any) by means of a benched Interface. . Approved filling, should be placed in layers not exceeding 200mm loose thickness, with each layer compacted to: a minimum dry density ratio of 97% Standard. Where filling is clayey, . moisture content within the filling should be maintained within OMC -2% (dry) to OMC +2% (wet): during and after compaction. Imported filling should preferably comprise low plasticity materials: (maximum. plasticity index of 50%) with a maximum particle size of 75mm (after .break down during compaction). Report on Geotechnical investigation " Project 33984 Proposed Bunnings Warehouse, Eumundi-Noosa. Road, Noosaville 16 August 2006
Page 42
fA Douglas Partners
“Page 9
. Any compacted silty or sandy silty clay foundation soil at or close to footing formation level
should be sealed or covered as soon as practicable, to reduce the opportunity for occurrence
of desiccation and cracking.
°. , ‘Level 1 tasting of filling, in ‘accordance with AS: 37984 j is recommended if the filling is to be
used for support of buildings and pavements.
The base of all soil trench excavations (if loosened) for any upper level strip and small pad footings
should be compacted by hand-guided compaction equipment such as ‘frog’ rammer or plate
vibrator, to the dry density. ratio as above. Where rock is exposed-.at the base of the trench
excavation, loose debris should be removed prior to pouring concrete.
in this report. To maintain’ compaction of thé batter,*iPis{yecommended that the fill platform be
Batters in any proposed controlled fill should be terns cr slope angles indicated tater
atter slope’
compacted in layers slightly wider than the. final
profile.
lignment, prior to’ trimming the final
The above procedures will require geotechnical inspection and .testit g services by qualified and
experienced geotechnical personnel during eee
lt should be noted that the investigation was Sin ned en inantly during dry weather and that the
high plasticity clays and near supe oils will durin prolonged wet weather or changes in
moisture condition and: may vol tin a ganity ee rigpilty problems, as indicated previously i in
_ this’ report.
7.7: Batter asope
Batter slopes cut to no dedper than m maviae designed for temporary and long term conditions as
presented inthe following table:
, Table 5 — Cut Batter Slopes
Materily” : Safe Batter Slope (H:V)
Short Term ‘Long Term
‘| Controlled Fill, Silty “Sand, ‘Stitt to, i an
Haid Clay :
‘Extremely low strength claystone and a 2
siltstone
Very low strength claystone and 0.75:1 1.5:1
siltstone _ :
The above temporary batter slopes are suggested with respect to slope stability only, and do not
allow for lateral.stress relaxation which may. result in movement of nearby inground services or
shallow footings. If such services are settlement-sensitive, and are located such that a linear spread
at 1H:1V outwards, down and away from the base of-the service,: intersects the cut face, then the
excavation’ may have to be positively supported.
The soil slopes may need to be flattened to 3H:1V or less, in order to allow vehicular access for
maintenance of grass.
* AS 3798-1996 Australian Standard “Guidelines on earthworks for commercial and residential developments’, Standards
Australia
Report on “Geotechnical Investigation . ° _ _ . Project 33984
Proposed Bunnings Warehouse, Eumundi-Noosa Road, Noosaville st . 16 August 2006
Page 43
(13) Douglas Partners
Page 10
All batter slopes, need to be topsoiled and grassed to reduce the risk of erosion and deterioration.
Lined open drains should be constructed across the top of cut and fill batter slopes to minimise
overland water flow down the batters. .
Where steeper temporary batter slopes are required, measures such as “hit and miss” construction
or soil nail walls may be suitable. Detailed assessment for these measures is outside the scope of
this report. Steeper temporary slopes may also be possible subject to detailed inspection by
experienced geotechnical personnel during construction. Near vertical.excavations are likely to be
suitable for shallow trenches (less than 1.5m depth) such as required for installation of underground
services and foundations. All trenches deeper than 1.5m should be shored or battered for stability
whenever personnel are to enter the trench. : , .
7.8 + Settlement of Controlled Filling
yon “ Re, .
Where bulk filling is placed under controlled ¢Ohditions, there i$, potential for ‘creep’ of the filling
material as the filling settles over time under. self Weight. \ ,
Potential movements for such filling cant estimatehgee percentage ‘of the layer thickness. Such
settlement may be in:the order of 0.5% toal%, of to filhicknoss for clayey filling over a 20 year
gl ular rockymaterials, a lower percentage might.be
period. Where filling predominantly, comprisé
prises*glayey material,a higher percentage
appropriate, and where the filliffg»predominahtly ¢o
might be appropriate.
Under self Weight will vary in accordance with the depth of
Estimates of bulk fillingscreep settle Ne
| meneayhers filling thicknesses are varied, such as over
filling. This may lead“t"différential si
existing sloping grounds ‘
‘The creep settlement estimates. of bk filling under self weight must'be added to the settlement
estimates of upper level footings,.in engineered filling,-and:compared with settlement estimates for
footings founded ‘in rock. The ‘designer must be aware of the potential for large’ differential
settlements where footings in t same structure are founded’ in materials of differing
compressibility, such as engineered bulk filling and natural clays.
7.9 Footings.
Based on the ground conditions encountered in the bores, it is expected that suitable foundations for
the building will comprise a combination of high level strip and pad footings, with slab stiffening to
suit anticipated site movements (where required), and bored -piers ‘to support heavily loaded or
movement-sensitive. parts of the building... . a :
High level strip:and pad footings founded in engineered fill prepared in accordance with this report,
can be designed using the allowable bearing pressures indicated in the following table. Footing
Settlements are estimated to be around 1% to 2% of footing width, in addition to any shrink-swell
and bulk fill settlements (indicated previously in this report). The potential movements are noted,
and the building and slab in particular need to be detailed to accommodate these movements.
Dowelling of the slab is recommended where differential settlements are a significant risk. The
potential for differential movements between.any piled. sections of the building and those supported
‘on fill is noted and will need to be accommodated.for in design. : : .
Report on Geotechnical tnvestigation - Project 33984
Proposed Bunnings Warehouse, Eumundi-Noosa Road, Noosaville 16 August 2006
Page 44
(})] Dougtas Partners
Page 11
Table 6 - Footing Design Parameters
Material Strip and Pad =| ‘Allowable Shaft Allowable End
Footings (kPa) Adhesion Bearing Pressure
(kPa) : (kPa)
Stiff clay,-medium dense sand, 150 15 NWA
controlled fill : ,
Very stiff and hard clays 300 “25 400.
Extremely tow strength claystone| °° 450 —- . 30 500 .
and siltstone _ : _ : . _ a
4 Very low strength .claystone and * 600 35 600
siltstone .
Bored piles should extend through filling and found in eit hard clays or weathered claystone and
siltstone at depth. Bored piles should found a minimumPofttwo to three pile diameters and can be
designed using the allowable parameters indicated/in the tablétabove.
These values. have been calculated using a facta of safety of 2.5.Where.limit state methods are to
be used to design the piles, the factoréd design geotechpical strength, (R",) can be calculated: by
multiplying the allowable value’ by the safety factor (t-determine ultimate values), and applying a
suitable geotechnical strength reduction factor(>,). Where,no-pile testing is carried out, a 4, value of
0.5 is suggested. . :
Ground conditions can vary, it is essential pat piléjexcavations be inspected by experienced
Douglas Partners geotechnical personnel to ensure the ground conditions agree with the design
assumptions and to ensure, that theye Seno, soft onloose material remaining at the base of the
excavations, or smeatjon the oo . . a
Experience ‘indicates thatybored Riles (loaded as per the table above) are likely: to undergo
settlements in the order of 1%zto 2% ‘of, the pile diameter.
Although no groundwater ingressywas encountered during the field investigation, groundwater
conditions can vary, and some ingress ‘into pile excavations might be encountered during
construction, requiring appropriate management.
7.10 Retaining Walls
At the time of the investigation, it was not known where; arid to: what. height retaining walls were
‘ proposed to:be constructed. .In.general, however, it is recommended that all retaining structures be
engineer-designed and constructed to adhere to the following loads and procedures:
* ~ ‘Active’ earth pressure conditions should be adopted where the retaining structure is not
braced. Where the structure is braced from lateral or rotational movements, ‘at rest’
conditions (K,) should-be adopted.
° Depending upon the material to be retained behind the wall, the lateral pressure coefficients
given in the following table are recommended for design. The factors for clay include ‘some
allowance for limited swell pressures exerted by the retained soils. The tabulated values are
_unfactored. . : oS
Report on Geotechnical investigation Project 33984
Proposed Bunnings Warehouse, Eumundi-Noosa Road, Noosaville . 16 August 2006
Page 45
())] Dougtas Partners
Oaetrcheies + feriraearent! - Growstester
Page 12
Table 7 — Earth Pressure Coefficients (non sloping crest backfill)
Material Unit Ky K,
. ot . Weight. (braced *(unbraced
_ ao et: (kN/m®)- structure) _|_ structure)
Controlled fill, stiff or very stiff silty clay 20 - 0.60 0.45
Very low strength claystone and siltstone 20 0.35 0.20
° Passive resistance at the toe should. be ignored in the zone where future disturbance (eg.
services trenches) could occur.
. Due allowance should be made for surcharge loadings (over and above the lateral earth
pressure coefficients presented above) where the fini inished ground level above retaining walls
_is above horizontal and where additional loading igtikely to be applied from existing or future
upslope structures; or from: traffic: *: . . .
eit is recommended that provision be madé’in design folabuild-up of hydrostatic pressure
behind the wall, as described above, unless full wall heigh drainage is installed behind the
wall. Drainage material behind the wall (as ‘above)Should be ingtalled for the full height of the
wall, for a width of at least -0. amfbe, free dratding and granular? and have a perforated or
slotted drainage pipe at the heel of thevwall.
iS, report Can be adopted for retaining
. Allowable bearing press: in
ae ye one-third to allow for the effects of the
~ wall strip footings provided.
lateral thrust from the wal
7.11 Pavements ani
The results of the soakedtCGBR 18 its condticted on selected subgrade samples of the clay filling
indicate subgrade CBR values, of 3% and 4%, and it is recommended that a design CBR value of
3% be adopted for design. For rigid pavements and slab on ground, a modulus of subgrade reaction
(k) of 25kPa/mm or a soil mecutgena for short term load and 1SMPa‘ for long term load could
be used for design.
These values are estimated to be close to a lower bound value for these. materials and are based on
the assumption that. the topsoil will 'be stripped prior to pavement construction. It is also contingent
upon adequate site preparation by proof rolling (to detect any unsuitable soft or loose material) and
subgrade compaction to a minimum density ratio of 98% Standard,
Ground conditions can vary and it is-recommended that the CBR value be confirmed by sampling
and testing during construction.
The above recommendations are based on the provision and maintenance of adequate s surface and
subsurface drainage. °
On-ground building and basement floor slabs ‘(ie. floating slabs) should be detailed so they can
move independently of any pile supported elements of the building. Dowelling of floor slabs will
minimise differential movements between adjacent slabs.
For loaded areas of different Proportion or different load intensity to standard wheel loads, DP
should be contacted for further advice. .
Report on Geotechnical invesiipation . : oe : . Project 33984
Proposed Bunnings Warehouse, Eumundi-Noosa Road, Noosaville . my fo 16- August 2006
Page 46
41}} Douglas Partners Page 13 7.12 Erodibility and Erosion Control Fine grained soils are prevalent at the site, although the Emerson Class tests indicate that the surface materials are of low dispersivity. Given the potential falls across the site and the fine grained soils present, it is expected that there is significant erosion risk associated with surface water flow. Erosion control measures will require detailed. design; however, it is expected that, as a minimum, measures will need to include silt fences, hay bales and measures to limit water runoff velocity (such ‘as swales or benches) and prompt installation of topsoiling’ and grassing or hydromulching in completed areas. A temporary detention basin may need to be considered. . It is recommended that adequate lined collector drainage be installed at the top/crest of all batters and that all drainage is discharged off-site via pipes or linéd-channels. 7.13 Earthquake Site Factor In accordance with AS1170.4-1993°, the earaiquake site factar, (S) is dependent upon the subsurface conditions at the site, and in particularyw habmraterials napus are founded on. Hence, there are Potentially two site facta for the or ‘« where structures are founded on contre weathered siltstone and clays Sioney( as antici factor (S) of 1.0 be adoptedior; Se * where structures are founded factor (S) of 1.5 bedddpted. f ill (inclu liga recompacted fill), residual soils. and lor the building), it is recommended that a site ry; ene yoconoed fill, it is recommended that a site These factors have bee! For General Structures”. Reviewed by: DOUGLAS PARTNERS PTY LTDa, Scott Reid . Andrew Middleton Geotechnical Engineer , : Senior Associate 5 Ast 170.4 — 1996 Australian Standard “Minimum design loads on structures, Part 4: Earthquake loads", Standards Australia Report on Geotechnical investigation Project 33984 Proposed Bunnings Warehouse, Eumundi-Noosa Road, Noosaville . 16 August 2006
Page 47
“308 ose EUMUNDI 2, TEST LOCATIONS ARE APPROXIMATE ONLY AND ARE SHOWN WITH REFERENCE TO EXISTING SITE FEATURES. O:\Geotech projects\33984 — Bunnings Noosoville\Orawings\test location plon 33984.dwg NOTES: : 1. ADAPTED FROM DRAWING 7050-01B PROVIDED BY PMM. LEGEND +> TEST BORE LOCATION AND NUMBER a TEST PIT LOCATION AND NUMBER f j Douglas Partners - Geotechnics + Environment - Groundwater ™E TEST LOCATION PLAN Proposed Bunnings Warehouse Eumundi-Noosa Road, Noosaville quent: BUNNINGS GROUP PTY LTD DRAWN BY: APPROVED BY: SAR SCALE: BIDOO TARE -| PROJECT Nox 33984 DRAWSG No: ft DATE: Sychey, Hewcastie, Canptetitom, Bristane, Melbourne, Tomsvitie, Cairns, Perth, Darvin’ Hot tergong, Wyong OFFICE: BRISBANE AUGUST 2006 1
Page 48
if idlephortig: ‘OF cilingy please: ake for,
‘Kerri Coyte (07) 5449 5223 a 5.0cT 2004
23438:DA
Your,Reli (6631
‘Email: po2@nodsa:qld.gov.au
2:1-October:2004
Pike Mirls McKnoulty" Ply Ltd:
PO.Box:3797.
SOUTH BRISBANE: ety: 4101
ritten ‘repr
Couhcit: about ‘the: conditions. contained ‘within. the development approy
apptoval! (Séction 4: ng A 27: of: the Integtat d Plannitig Act), é
should be provided. to ‘Council, This will avoid untiéeessat'y delays
commencement 6f the submittér’s appeal:period of 20 ‘business days. Please:
‘the Development: Perthit doesnot’ take-éffect and:cannot' be: acted’ upon,-uniti ‘te end-of | -
‘the:submitter’s-appeal period.
Award:Winner - Austiralian-Clean:Beach NOOSA COUNCIL auysreeucn
Challenge:2004 Litter Prévention OPelicain Stiver ewantiy PO Box tit Tewantin.Q-4363
Phowe: 07-5449 5200: Fax: OF 5447-1062
Email: [email protected], .
Page 49
Should: you: wish to- obtain, more-iniformation about Coundil’s decision, ‘the reports and
staff: commendations-and:Gouncil Minutes regarding ‘this: jlicdtion are available for
Tt would ‘assist: Goitticil
staffif you co this:letter with you.” _—
‘Yous faithfully,
Kay >
Kerri Coyle
ACTING MA } GER. LAND USE .
Award Winner - ‘Australian Clean ‘Beach
Challen 2004 itter P
nh
Page 50
i ‘APPLICANT DETAILS, aan
13 OWNER DETAILS
ce
INTEGRATED PLANNING ACT 4997, $3:5115, IDAS DEVELOPMENT.APPLICATION
IN Foti 6 - Decision Notice
FileNo: 234380, Date of ecision: 44 Ociober 2004
“Name: Fo PIKE MIRES: MOKNOULTY pry LTD
Phone:no; 3846. 3344 - Fax:noz 13846:7844 - "Mobile:
Ty BRORERTY. DESCRIPTION.
‘Street address; 178-162 EUMUNDI'NG
‘Suburblécaity | NOOSAVILLE.
Real property. . LOT A'RP 139192, LOT 21: RP’ 867627, LOT25:;RP 151408, COUNTY’ OF MARCH, PARISH.
description: OF TEWAN: IN .
Naiié: o BUNNINGS PROPERTIES PTY TD
eb ieeencamcemanresinme ernst
Referral Agency Address; ‘ ‘Basis
Departrieht of -Maity POBOx 183 Gympie-4570 o Advice
Roads .
ie APPLICATION TPE :
~ Development Development Detalls === reliminary Development
: Approval © Permit
Material Change: of Use Showroom & ‘Nursery (Bunnings’ . , NO. YES!
. Waretiouse)! . :
Lot-Reconfiguration Slots'to 2'iois. NO YES
if: : DECISION, DETAILS
Couttci ‘on ta October 2004 decided: to:.
A. ‘Refuse:the:Matetial Changéiin Use:component;
B. —_Approve'the:recorifiguration ‘ofa lof component, subjéct to conditions.
iv APPLICABLE:CODES:
The develops SFmust.compl -withsthe. following: codes: for self assessable devel
approved: Lundet: this: Developinent: Perrnit:-.
Not applicable.
Page 51
NOOSA COUNCIL IDAS.Devetopment Application Decision: Notics te SUaMESONS eT __ dt ds. rowth of.industrial: ‘activities within the :Shiré by- introducing al devélo) t, , 2. act: pon the‘ability:of: ithe Shire:Business Céntré to: ‘operate as:the ‘and ‘administrativé centre. . Bic d to demonstrate’ that:the’ proposed ncaa inrétailshowroom‘floor: “Space will’ sdvei n re ‘Busine: . . . . 4 S. 6 a! 8. lave signific icant: cadverse impact: ‘on the apetation: ‘of the Eumundi Road d, Rene:Strest-and Eenie Creek Road. 9. lasignificant _fustifi cation, has: be ni provided : that would warrant approving change’ ‘ofuse:given the:confl I application jare attached. a TASsEssi WENT MANAGER.” rere saree | :Namé: Noosa Council , ‘Signature: y- Date: 24/40/04. - ASEP o:\database\onestopWecision.doc.
Page 52
NOOSA COUNGIL IDAS Devélofimelt Application Decision Notice © , . . 3:
ca ads -_ Noosa Council Conditions
INTEGRA TED. PLANNINGAGT 997,,l AS. DEVELOPMENT APPLICATION.
1. Forthé burpdse of these conditions, .the following definitions-apply: - >
Tide A ‘Plan: ‘of. Survey. ineahs: the; plan: for the: econtiguration. ‘of a lot! required! to be. éhdorsed; by:
12. As
‘eniginger N] I fed Queensland: pursuantto! the’ al Epalnears ee ‘Ket: 4
43. The person 1 geting on this, permit’ mieans. any person or: dompaiy Who undertakes development
" ‘pursuant-to:this permit. : :
1:4. AS'2890:1 -—-1993.Méans:Australian Standard: loro Set Carpar ig - AS 2890.1~1993..
2..
3. 5 } ing tecurany pers is. ‘four (4) years
frotr rine ey hi pertnt ; AECL during : i ; condi ignss must han is
Operational works completed, andithe: i /
4:
‘5
, pay
the’ Plan-of' Suivey.
6. Prior to. undertaking any, excavation, the. person acting: :on ‘this: permit: Shall contact public utility service.
providers to. ascertain the location of their uriderground': Services.
4. For, thie be ob classes ‘of: work associated with development, a Development Rermit'for Operational!
works relating to:that class: of work. He application
TA, Ades
7:2, .Slte-Civil Works
7.3, Frontage:works
7:4. ‘S@wer'réticulation’including new:mains
#5, Water fticuation ,
8.
SEP. Gildotabssatonelicpluéciston'dee:
Page 53
10.
11.
12.
49,
14,
15.
16.
‘NOOSA. COUNCIL IDAS Development Application Decision Notice Lo Lo : *
development:
is ‘permit: damages: ‘any. Gouncif:property or fai lities (SuCh-as underground.
ewerage): ; trough. any cause vhatsoev'
If any ‘person acting under t
drainage, water ‘supply: and
and ‘Devetopment
4 Manager: » Land
‘cary, ou ‘he. rectification: Works,
Development:
Any: dariage’ 10:
Edmund Noosa Ro
_A Development ‘Permit’ for: ‘Operational Works:shall be.obtalnad-prior-to:the: commenceme, f
‘Footpath and: ‘property alignment levels maybe: obt
‘fequest: “The footpath 4s 'to.-be Constructed, taking, ‘care. “to: “protect any: sign
i rontage of ‘the: site.. The. sit shall: ‘have ER slip: resistants Surface.
. ~underground:services.
“The ‘conc te. oor is to. be Aosigned ‘and _consirusted ‘to. ensure: pedestrian i Safety ‘using nresilp
ior‘to works’ being taken Qn’ maintenance, the, remainder ‘of'the footpath aréa-shalli’be ‘topsoiled and
‘established with:couich oF ‘buffalo turf, free ofweeds. .
crossings to ‘the site:
ince. with Councit's Standard speciiatons prior to commence
The following:sieps shall'be unde taken prior to-commencement of any consthuction:-
15:41. The:
al ‘Contractor shall give: ‘Councils Inspector seven (7): dayS* ‘notice .of- intention to
OTK:
“45'2. The Principal Contractor. Or-any of his ‘Subeonttaictols shall: not undertake: any’ works unless: each
contractor has “public. ‘liability ‘insurance ‘in the sum of'$16; 000,000 and copies. -of current public
liabilityinsurance policies:are-submittédto- Council's: inspector:
45:3. The:Principal Contractor shall. nominate a site representative’ afid give-a‘telephone number*that
can reach‘the site- representative: vat any:time during:a 24-hour day.. ©
15:4. ange: to-meet on-site-with ‘Councis:lispector to.obtain Council's
‘in accordance with’ the Manat of
15:5. 4 hi
I Devices and: ‘Departinent: of Ttansport (Main ‘Roads. Division) Roadworks
Uniform Traffic, C
‘Signing Guide:
Operational works ghallibé:cairtied. outiin a manner that-prevents:+
16.1. -Pollution‘of'a'waterway
16.2.. Dust/sandinuisance:to.residents-in'the vicinity:
SEP. ‘o:WatabeselonestopWiédisionidoc
¥
7a.
e
‘
Page 54
47:
“18:
19,
"20.
24,
22.
23.
24.
NOOSA: CQUNCIEIDAS Dévélebinént Application Decislon Naltee . - 8
46:3: ‘Transfer of dirtand-debris orto a:public-road
Dba dbove:ambieritimeasured at the'lot’boundati
164. Excessive noise:(6és than 4
: Excessive Ifaffic:delays (léss than S:minuté,délays) a
Prior to: endorsement: of the: Plai of Survey, @ registered ‘practicing Geotectinical Engineer shail’ subtiit
site: classifications: Teports: for’both parcels. The: exterit ‘of sinegntratled: fill arid ‘each: lot site classification
shal bet shoWnion actretes, yundsy survey: plan..
Engineer shall prepare: éiigiri
ich:shallbe submitted in: conjunction’
from ‘a registe id Professional Civil Engineer
Cj Operational, Works issued bi
at’ hefshe. has: isuperniged those: "Works anid | ‘that '
and, sewer reticulate
footpaths: ravings sh
Ail daciared plants, f stu ing but:not iimitey:te> Gi \ ‘Bi hi, (Bacéhiaris. halimifolia), Giant: Rats Tail
Giass' (Spordbolus, pyramidalis :and’ S.. natatensis),. sand Salvinia nidlésta:; shall:bé éléared from. the site:
prior to’ Council ‘endorsement of the: Piai.of Suivey,,
Under State: Legislation, ‘Gall’ Fly ‘(Rhopalomyia Califormicay: is: Hot.a, fecognised. means: of control ‘or
destruction ofgrouridsél bush. Any:existing Declared. Noxious:Plants:under Rurat Lands: ‘Protection Act’
(1985), which. havea: coritrol category:of P2; P36’ P4, ‘shall be’ controliéd: in:a: manner ‘pursuant to: the:
Rufst Lani Protection Act! “(1985).,
é dication works:shall be:a:minimum of: thirty. (80)
fficer ‘will fot ‘Undertake an; inspe tion the
the - site stall be- Yetained’ except ‘wheré removal. is ‘required to “enable
S68 or pegging of. ‘surveyed boundaries,
Prior'to commencement of-any:operatlonal works: -arising: out-of this permit, security in the:sum of. $5:000
must.be: lodged with Noosa. Couricil ‘Sécuré perfortrance of a ai if this: permit; The security
Shall. ‘be in the: fortn of cash: or. unconditional’ ‘trading ‘bank: guarantee: acceptablé ito the Manager.- Land
Development:
The 'sécirity ‘will. be r id upon, satisfactory: performance. ‘of ‘ail’ “thes on fis Of this permit Bnd: any
‘other. related: development permits for operational WOrkS; less ‘any Costs incurred by" Council-in ensuring
-Corpli ‘With: thesé ‘Conditions: or:for any-additiona inspection: incurred for substaridatd:Wwork:-or work
undertaken not: in accordance-with this permit. : .
SEP osdatabasatonestoptdétision.doc,
Page 55
NGOSA:COUNGIL IDAS Devélopment’Appiication Decision Notices : 8
25.
26:
QF.
28.
29.
36.
‘Gourieil: rae endorsement ‘ofthe: Plan of Survey.
‘drainage §
All site didiiage shallbe by means.or gravi
All, connections. 16 sewer * systent. ‘shall be. Carried -out: ‘either iby Council or by’ a Couneil approved
: Contractor andatno:cost:to Council: Any: ‘connection.te a water main shalt be'undertaken:by:- Council.
Any alteration: 6k a'public utility or other-facility necessitated: ‘by: the: development of'the Jand‘or associated
construction works either. internal orexterrial to the'site: Shall-be at-no. costo Council.
Stormwater. isto be-disposed of:on:site‘so:as' ‘to'cause o:scour‘or damage to ddjdining properties to‘the
Sfaction-of the Manager Land. Development. Al ‘Development Permit:for Building’ Works
fed-unti a Development Permit for: Operational Works: ‘Has bé6n issued in: regard" to: the
‘Shall not be
gysterns,
“SEP o;\dplabase\onestopidécisinn oc,
Page 56
All dit
Of metres.
Thé boundaries shown on this
be used ‘for tinal dé
[ NQOSACOUNTIL ©
‘APPROVED SUBJECT TO CONDITIONS :
ON SERMIT,
DATE
HOR MANAGER LAND.D!
sion should’ not
led engineers design.
jensions ond areas ore approximate only,
Gnd. are subject to SUEY: and" Couneil .oppra'
Dimensions hove been rounded io. ‘the. néorest
81
St
SP Tfe182
._('5as}
. GVO"
152.3.
426 ha -
bo
| RP 802360
Ls
14
SP 1O7s8
Fgurune 8
220.5, \
: 50
SP 107541 |
ye
RP od Tt4S!
26
SP 151406
m Emt C.
a SP 107541
PROJECT
PROPOSED SUBDIVISION:
. CENT,
LEVEL “DATUM SCALE — : oo AEN 910370440
0 of r 83: - iN Se wey a uaevneun <¥
£2000. OVER Lor 1 ON RP 183192; aeauen Wal SIREET. WES eta ” PIKE sitRLS MeKHOULTY
aad a i A 7 A LAND SURVEYORS
‘osicitt coe ROTOR LOT 21 ON RP 867627 & SOUTH BRISBANE’ BC: OLD 4106 TOWN PLANNERS,
Sieve * LOT 25 ON SP 151406 TELEPHONE ‘07 3846 3348
=: - ~ — — FACSIMILE 67 3846 Taka
‘ . Com. by SSZAWP: Parfih. TEWANTIN ab Ret. ernal) pevneteme,com.ay F Reference
7o [es OG Hot GESprop seek. Maborty. NOOSA SHIRE GOUNCIL 6631 6631-07 B
PIKE, MALS, MeKNOULTY' PTY Lo
Used in these records
07/2125 - Op Works - Bulk Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.