Council archive · source document
07/2125 - Op Works - Bulk Earthworks [As Published] · 142007.2125
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
If yes, is what the proposed operational work is associated with (Tick applicable box/es)
A material change of use that is assessable under the planning scheme 1 No Yes H
Reconfiguring a lot that does not increase the total number of lots and DD No El Yes
does not increase the total number of lots abutting the State-controlled
toad
Other OO No 0 Yes
ff yes to “other”, and answers to questions in this Section of the checklist indicate the proposed operational work is assessable under
IPA, schedule 8 - Answer (a) to (c) below
IP Regulation, schedule 2, table 2. item 3
Disclaimer:
While the Department of Local Government, Planning, Sport and Recreation (DLGPSR) believes that this information contained on this
form and provided as part of this process will be of assistance to you, itis provided on the basis that you will not rely on the information
without first making your own enquiries regarding the interpretation and application of the applicable legislation to your circumstances.
To the full extent permitted by law DLGPSR expressly disclaims all liability {including but not limited to liability for negligence) for errors
or omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your
teliance on this process and the information contained on this form
Proposal ID
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2125 - Op Works - Bulk Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.