07/2125 - Op Works - Bulk Earthworks [As Published] · 142007.2125

of 56

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Ma. ,

 

 

 

Ground Enginéering Contractors

 

AUSTRALIA - SOUTH AFRICA = EUROPE - CHINA MIDDLE EAST
It is estimated that the ground treatment works (including geotechnical testing) will take with the
use of one Impact Compactor the approximate periods shown below for completion excluding
delays caused by inclement weather or site stoppages:-

= Building Area: ~ 2 weeks
_ = Car Park Area: 3 weeks

Should you- ‘fequire further clarification or wish to discuss the above further please do not .

hesitate to contact the undersigned.
For and On Behalf Of LANDPAC

Kevin McCann pip. eng. mBA,FAICD

A.BN. 12 069 528 696

PO BOX 132, SEVEN’ HILLS, NSW 1730; ‘groundimprovement@landpac. com.au FAX: (02) 9836 8162 -
_ Sydney{02y 9838 7044; Brisbane-(07) 3832 7666; Perth-(08) 9421 1644; Melbourne-(03) 9525 5690:
DIRECTORS: E J COOK, T R COOK, KT McCANN.”

 

Used in these records

About this file

File size
3.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2125 - Op Works - Bulk Earthworks [As Published].pdf · 3.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.