07/2125 - Op Works - Bulk Earthworks [As Published] · 142007.2125
Ma. ,
Ground Enginéering Contractors
AUSTRALIA - SOUTH AFRICA = EUROPE - CHINA MIDDLE EAST
It is estimated that the ground treatment works (including geotechnical testing) will take with the
use of one Impact Compactor the approximate periods shown below for completion excluding
delays caused by inclement weather or site stoppages:-
= Building Area: ~ 2 weeks
_ = Car Park Area: 3 weeks
Should you- ‘fequire further clarification or wish to discuss the above further please do not .
hesitate to contact the undersigned.
For and On Behalf Of LANDPAC
Kevin McCann pip. eng. mBA,FAICD
A.BN. 12 069 528 696
PO BOX 132, SEVEN’ HILLS, NSW 1730; ‘groundimprovement@landpac. com.au FAX: (02) 9836 8162 -
_ Sydney{02y 9838 7044; Brisbane-(07) 3832 7666; Perth-(08) 9421 1644; Melbourne-(03) 9525 5690:
DIRECTORS: E J COOK, T R COOK, KT McCANN.”
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2125 - Op Works - Bulk Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.