Council archive · source document
07/2125 - Op Works - Bulk Earthworks [As Published] · 142007.2125
Ground Fagineering Gontractors AUSTRALIA - SOUTH AFRICA = EUROPE ~ CHINA - MIDDLE EAST , Page 2 of 2 The above is all inclusive of: - provision of all plant and equipment with experienced operators, and supervision of the works. . The following assumptions have been made: ¢ No material will'be required to be imported onto or exported off site by Landpac. . Existing services (if any) on site will be identified and readily marked i in the compaction areas, No allowance has, been made for the following: - Should you require further clarification, pléase do not-hesitate to contact the undersigned. This - quotation: will remain: valid for 60:days: Rates and payments are subject to 10% GST and. are « Any works to existing services . Site preparation Excavation and backfilling of areas with deleterious material - Disposal of Contaminated, Unsuitable or Excess Soil. Bulk Earthworks. - payable within 30 days of invoice to Landpac’s offices. For and On Behalf Of, LANDPAC TECHNOLOGIES PTY LTD Kevin McCann pip. Eng. MBA, FAICD . Date: 6 August 2007 A.B.N. 12 069 528 696 PO BOX 132, SEVEN HILLS, NSW 1730, groundimprovement@landpac. com.au FAX: (02) 9838 8162 Sydney-(02) 9838 7044; Brisbane-(07) 3832 7666; Perth-(08). 9421 1644; Melboume-(03) 9525 5690 _ DIRECTORS: EJ COOK, TR cook, KT. McCANN
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2125 - Op Works - Bulk Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.