¢/)] Douglas Partners
Page 3

each test location inferred from a site survey drawing. Approximate test locations are indicated on
Drawing 1 attached.

‘Al field work was undertaken in the presence of a geotechnical engineer who -positioned test
locations, logged test: pits, and collected soil samples, and a senior geotechnician who logged the
bores and-collected soil samples.

5.0 FIELD WORK RESULTS
The subsurface conditions observed in the. test bores and pits are described in detail on the test

bore and test pit report sheets attached, together with notes, defining the classification methods and
descriptive terns used. :

  
   

In summary, the subsurface coriditions ‘generall compristiyuncontroted filling overlying silty
sand, then slity clay, claystone and siltstof ne? The sub: uptace conditions encountered are
summarised on Figures 1 and 2 following and ated ther >

Building Area (Bores 15 to 22)

. Filling: Filling in the val pies in the f tg ilding area was encountered to 0.15m depth and
comprised loose gravel, ably pl csor traffigability. This filling is assumed to be
‘uncontrolled’ in the absé ecords indicating, otherwise, although it appears moderately

. well compacted.

fee Silty Sand: Gefprall Sito loose tog aes dense ‘silty sand, possibly representing a former
subsoil layer (difectly beléw,topsoil)yin Bo! eSy15, 18 and 19 to depths of 0.45m to 0.6m.

     

    
  
  

ee ol

° Silty Clay: + Stiff to verysstiff silty, clay (but firm to stiff to 0.9m depth in Bore 20) grading to very
stiff to hard with depth nee en Sintered i in all bores and extended to the termination of Bore
16 at 6.45m depth and to depths:of 2.4m to 5.7m in the remaining bores.

. Claystone and Siltstone: Extremely weathered, extremely low and very low strength
‘ claystone and. siltstone was, encountered below the. silty clay and continued to termination: ‘of
the bores at 6.24m to 7.92m. . .

Free groundwater was encountered at 4.0m depth in Bore 15, 16, and 18, but was not observed in
any other bore. It should be noted that groundwater depths and’ ground moisture conditions are
affected by climatic conditions and soil permeability, and will therefore vary with time.

Carpark Area (Pits 1 to 14)

. Filling: Filling in the pits was encountered to depths of up to 1.6m in Pits 1,2, 3, 5, 6-and 7 in
. the soutti east: third. of the site, and to depths of up to 6.0m in the remainder of the test pits in
the north west two thirds of the site. It is noted that the depth of fill is likely to be larger in the
north west part of the site where an existing topsoil stockpile precluded access for testing.
Where the fill was shallow, and the upper part of some of the deeper areas of fill, the material
comprised.poorly compacted ‘clean’ fill comprising sand, clay and gravel. Where deeper, the

fill was poorly compacted and included significant content (up to an estimated 25% to 50%) of -
building demolition materials including timber, bricks, concrete, steel sheeting, wire, timber,

 

Report on Geotechnical investigation =» " : Project 33984
- Proposed Bunnings Warehouse, Eumundi-Noosa Road, Noosavite . : , 16 August 2006

Used in these records

About this file

File size
3.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2125 - Op Works - Bulk Earthworks [As Published].pdf · 3.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.