Council archive · source document
07/2125 - Op Works - Bulk Earthworks [As Published] · 142007.2125
NGOSA:COUNGIL IDAS Devélopment’Appiication Decision Notices : 8
25.
26:
QF.
28.
29.
36.
‘Gourieil: rae endorsement ‘ofthe: Plan of Survey.
‘drainage §
All site didiiage shallbe by means.or gravi
All, connections. 16 sewer * systent. ‘shall be. Carried -out: ‘either iby Council or by’ a Couneil approved
: Contractor andatno:cost:to Council: Any: ‘connection.te a water main shalt be'undertaken:by:- Council.
Any alteration: 6k a'public utility or other-facility necessitated: ‘by: the: development of'the Jand‘or associated
construction works either. internal orexterrial to the'site: Shall-be at-no. costo Council.
Stormwater. isto be-disposed of:on:site‘so:as' ‘to'cause o:scour‘or damage to ddjdining properties to‘the
Sfaction-of the Manager Land. Development. Al ‘Development Permit:for Building’ Works
fed-unti a Development Permit for: Operational Works: ‘Has bé6n issued in: regard" to: the
‘Shall not be
gysterns,
“SEP o;\dplabase\onestopidécisinn oc,
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2125 - Op Works - Bulk Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.