Approved Plan MCU20-0126 & OPW20-0210
Original PDF page 5, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn ACCEPTABLE BIN ENCLOSURE /
RAINWATER TANK ENCLOSURE OPTIONS
ALUMINIUM HORIZONTAL OR TIMBER HORIZONTAL
SCREEN FOR REFUSE BIN BATTEN SCREEN FOR
AREA / WATER TANK REFUSE BIN AREA /
WATER TANK
ACCEPTABLE FENCING OPTIONS IF
CLIENT REQUIRES IN THE FUTURE
FRONT FENCE & SIDE BOUNDARY
SLIDING GATE FENCE
1800h BLACK POWDER COATED
PALISADES TYPE FENCING ( MIN 70% 1800mm HIGH BLACK
TRANSPARENT). COATED WIRE MESH TO
1.0m MIN SETBACK OFF FRONT SIDE BOUNDARY
BOUNDARY (IF CLIENT REQUIRES) (IF CLIENT REQUIRES)
MCU20/0126 & OPW20/0210
NNOOSA COUNCIL
APPROVED PLAN
2 FEB 2021
-
6 Lorraine Avenue
Marcoola Beach, QLD, 4573
07 5448 8500
[email protected]
www.buildingsuncoastgreen.com.au
QBCC Licence No. 65942
H 04.11.20 RFI CHANGES SB DJ
G 03.11.20 INSERT CIVIL / ADD LANDSCAPE SB DJ
F 27.10.20 CHANGES NAME ON DWGS SB DJ
E 19.10.20 INCREASED MEZZANINE SB DJ
D 15.10.20 CLIENT CHANGES / INSERT SURVEY SB DJ
C 05.04.19 CLIENT CHANGES TB DJ
B 16.11.18 CONCEPT TB DJ
A 05.11.18 CONCEPT TB DJ
Issue Date Subject Initial Auth
Amendments
Client MV SIESTA PTY LTD
LOT 13 GATEWAY DRIVE
NOOSAVILLE
Drawing Description
3D VIEWS
Drawn SB Checked DJ
Scale 1 : 100 Date 05.04.09
Project No. 13-2018 Sheet No. 05 OF 09
CONCEPT Issue
H
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.