Council archive · source document
Development Application - Part 1 of 2 - Covering Letter, IDAS Forms 1 & 6 · OPW11/0308
SCE:' ^F^<<<
I I I ^,ui ^ ,iIi lrl ^ ^l
B03833f
THIS IS THE NEXT PART OF A
MULTIPLE PART RECORD
Part Of
Application number:
PART (3) doe
Development Counter
0 1 SEP 2011
Maroochydore
a2 $O 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 14 pages
Page 2
Page 3
B0413736
31 August 2011
The Chief Executive Officer
Sunshine Coast Regional Council
Locked Bag 72
Robin Sunshine Coast Mail Centre QLD 4560
Russell
& ASSOCIATES PTY. LTD.
Attention: Design Engineer
A.B.N. 78 010 589 661
Dear Sir, 0 2 SEP 2011
RE: BUNNINGS GROUP LTD,fEUMUN1'jQ,SA, ^00SAVILI F
Our Reference: H027
We have been engaged as Consulting Electrical Engineer for the design of Energex
electricity reticulation and Council street lighting on the above subdivision. Details of the
subdivision are contained on the Suhclivisiou Details Sheet enclosed.
Our design will be submitted to Energex for their approval of the electricity reticulation.
However we now request your approval of the following specific items, for which Council
is responsible:
Approval of footpath alignments specified on the enclosed plan, for proposed poles,
street lighting columns and underground cables;
(as applicable) formal approval of the works proposed on any existing Council-
controlled road, as required by the Electricity Act 1994, S. 102;
approval of the street lighting design;
confirmation that the electricity reticulation and street lighting, as designed, satisfies
the requirements of Council's development approval for this subdivision.
Thank you for this assistance.
QUALITY Yours faithfully.
MANAGEMENT
SYSTEM
Murray Hobbs
Regional Manager
Murray M bbs
4 Wakefield St for ROBIN RtSSELL. AND ASSOCIATES PTY LTD
Woombye Qld 4559
Consulting End. Works plan
Electrical Engineers Subdivision Details .Sheet
Specializing in IDAS Forms I & 6
electricity distribution Cheque & developer's authority
Robin Russell QlLecme Pal'ntent Form & Receipt
RPEQ 1546
21 Nicholas St. McDowall,
Queensland 4053, Australia
Sunshine Coast
Ph (07) 5442 1758
Fax (07) 5442 2758 1^^^^630 Ic .j
Head Office
Ph (07) 3872 5555 rhr. n,c
Email: mhOrobrus.com.au -19
Page 4
UUI Integrated Development Assessment System form wow
Nom=
Application details-IDAS form 1
(Sustainable Planning Act 2009 version to effective t8 December 2009)
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all necessary
information and documentation will result in your application not being a properly made application.
For all development applications, you must:
• complete this form (Application details-IDASform ')
• complete any other forms relevant to your application
• provide any mandatory supporting information identified on the forms as being required to accompany your
application.
Attach extra pages if there is insufficient space on this form.
All terms used on this form have the meaning given in the Sustainable Planning Act2009 or the Sustainable Planning
Regulation 2009.
This form can also be completed online using Smart eDA at www.smarteda.gld.gov.au
Applicant details (note: the applicant is the person responsible for making the application and need not be the owner of
the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is correct. Any
development permit or preliminary approval that may be issued as a consequence of this application will be issued to the
applicant.)
Name/s (individual or company name in full)
F G M Group Pty Ltd c/- Robin Russell & Associates Pty Ltd
I
For companies, contact name IMurray Hobbs
Postal address Wakefield Street
oombye Qld 4559
Contact phone number 1 (07) 5442 1758
Mobile number (non-mandatory)
Fax number (non-mandatory)
e-mail address (non-mandatory)
Irobrus.com.au
Department of Infrastructure and Planning QplanQueensland
^^ Government
Page 5
i. What is the nature of development proposed? (tick all applicable box/es)
material change of use of premises
building work
Iv operational work
reconfiguring a lot
2. What type of approval is being sought?
development permit preliminary approval q both-provide details below
Iv
/ q
3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?
IV( No
Yes-complete table A and then go to question 5
q
Table A-name of each local government area in which the mobile and temporary ERA is proposed to operate
4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)
Table B-street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises
3q street address/lot on the plan
street address/lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
water e.g. jetty, pontoon)
Street address Lot on plan description Local government area
(e.g. Logan, Cairns)
Unit Street Street name and official suburb/ Post- Lot no. Plan type
no. no. locality name code and plan no.
178 Eumundi-Noosa Road, Noosaville 4566 $0
F2. I I b^^
Application details-IDAS form ,
Version r.o 18 December 2oo9
Page 6
Jul
Table C-premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g. channel
dredging in Moreton Bay)
Coordinates Zone Datum Local government
(note: place each set of coordinates in a separate row) reference area (if applicable)
Easting Northing Latitude Longitude
El GDA94
q WGS84
q other
. Total area of the premises on which the development is proposed (indicate hectares or m2)
6. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm, etc.)
vacant land
. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.)
electricity reticulation and street lighting
8. Is owner's consent required for this application? (refer to notes at the end of this form for more information)
El No
Yes-complete either table D, table E or table F as applicable
Table D
Name of owner/s of the land
I/We, the above-mentioned owner/s of the land, consent to the making of this application.
Signature of owner/s of the land
Date
Application details-/DAS form r
Version i. o 18 December 2009
Page 7
LJUI
Table E
Name of owner/s of the land
q The owner's written consent is attached or will be provided separately to the assessment manager
Table F
Name of owner/s of the land TGM Group Pty Ltd
Iv By making this application, I, the applicant, declare that the owner has given written consent to the making of the
application.
9. Does the application involve a state resource? (e.g. the application involves state land, or taking quarry materials.
Refer to the notes at the end of this form for more information)
Iv
No
LI
Table G-state owned resources (provide de tails for each state resource in a separate table)
Nature of state-owned resource
Nature of evidence required (tick the
applicable box and attach a copy of the Evidence of an allocation of, or an entitlement to, the resource
evidence to this form)
Evidence the chief executive of the department administering the
resource is satisfied the development is consistent with an allocation
of, or an entitlement to, the resource
Evidence the chief executive of the department administering the
resource is satisfied the development application may proceed in the
absence of an allocation of, or an entitlement to, the resource
to. Identify if any of the following apply to the premises (tick applicable box/es)
adjacent to a water body, watercourse or aquifer (e.g. creek, river, lake, canal)-complete table H
q
on strategic port land under the Transport Infrastructure Act 1994-complete table I
q
in a tidal water area-complete table J
q
Table H Name of water body, watercourse or aquifer
,rho„ details-IDASform i
>ion 1. o 18 December zooq
Page 8
Table I I Lot on plan description for strategic port land I Port authority for the lot
Table 1 Name of local government for the tidal area (if applicable) Port authority for the tidal area (if applicable)
ii. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water, etc.)
No Yes-ensure the type, location and dimension of each easement is included in the plans submitted
Iv q
12. Does the proposal include new building work or operational work on the premises? (including any services)
LI 13 Yes-ensure the nature, location and dimension of proposed works are included in plans submitted
13. Is the payment of a portable tong service leave levy applicable to this application? (refer to notes at the end of this
form for more information)
No-go to question 15 Yes
Iv q IPLSL is payable by the applicant for civil operational works approval
14. Has the portable long service leave levy been paid? (refer to notes at the end of this form for more information)
q No
Yes-complete table K and submit with this application the yellow local government/private certifier's copy of the
I^.
receipted QLeave form
Table K Amount paid Date paid QLeave Project Number (6 digit number starting with A, B,
E, L or P)
11, 077.00 09/06/11 E087976
15. Has the local government agreed to apply a superseded planning scheme to this application under section 96 of
the Sustainable Planning Act 200.0?
C No
Yes-please provide details below
q
Name of local government Date of written notice given Reference number of written notice given
by local government by local government (if applicable)
5 Application details-IDAS form i
Version 1. o 18 December 2009
Page 9
16. List below all of the forms and supporting information that accompany this application (include all IDAS forms,
checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this question
does not apply for applications made on-line using Smart eDA)
Description of attachment or title of attachment Method of lodgement to
assessment manager
Electrical Works Plan (plan numbers) post
Subdivision Details Sheet, Client Cheque & Authority Form post
PLSL Notification and Payment Form & Receipt post
17. Applicant's declaration
Fv By making this application, I declare that all information in this application is true and correct (note: it is unlawful to
provide false or misleading information).
Notes for completing this form
Question 8:
• Section 263 of the Sustainable Planning Act20o9 sets out when the consent of the owner of the land is required for an
application. Section 26o(i)(e) of the Sustainable PlanningAct2009 provides that if the owner's consent is required
under section 263, then an application must contain, or be accompanied by, the written consent of the owner, or
include a declaration by the applicant that the owner has given written consent to the making of the application.
• Owner's consent is not required for a mobile and temporary ERA.
Question 9:
• Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
regulation may require the application to be supported by certain evidence prescribed under the regulation. Schedule
14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is required to be
given, and the evidence required, to support the application.
Question 23:
• The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable long
service leave levy is payable.
• The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy are
prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.
Question 14:
• The portable long service leave levy need not be paid when the application is made, but the Building and Construction
Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development permit is issued.
• Building and Construction Industry Notification and Payment Forms are available from any Queensland post office or
agency, on request from QLeave, or can be completed on the QLeave website at www.qleave.qld.gov.au. For further
information contact QLeave on 1800 803 481 or www.gleave.qld.gov.au.
lion details-IDAS form i
rn 1.018 December 2ooc
Page 10
qq[
Privacy-the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a purpose
outside of the IDAS process, except where required by legislation (including the Right to Information Act 2009) or as required
by Parliament. This information may be stored in a departmental database. The information collected will be retained as
required by the Public Records Ac-tZoa.
OFFILE 'm e'^
`'
Date releived
NOTIFICAIMON OF, ENGAGEMENT
To Ma _-il. I have been engaged as the private certifier for the building work referred
Building
Date of engagement Name BSA Certification license number
classification/s
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)
Date receipted
QLeave Project Amount paid form sighted by Name of officer who
Description of the work Date paid
Number ($) assessment sighted the form
manager
The SustainablePlanningAct2009(SPA) is administered by the Department of Infrastructure and Planning. This form and
all other required application materials should be sent to your assessment manager and any referral agencies.
ition details-IDAS form 1
on 1.018 December 2009
Page 11
Building or operational work assessable against
a planning scheme-IDAS form 6
(Sustainable PlanningAct 2009 version i.o effective 18 December 2009)
This form must be completed for development applications for building works or operational work assessable against a
planning scheme.
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all necessary
information and documentation will result in your application not being a properly made application.
For all development applications, you must:
• complete Application details-IDASform i
• complete any other forms relevant to your application
• provide any mandatory supporting information identified on the forms as being required to accompany your
application.
Attach extra pages if there is insufficient space on this form.
All terms used on this form have the meaning given in the Sustainable PlanningAct 2009 or the Sustainable Planning
Regulation 2009.
This form can also be used for development on strategic port land under the Transport /nfrastructureAct1994.
This form can also be completed online using Smart eDA at www.smarteda.gld.gov.au
z. What is the nature of the work that requires assessment against a planning scheme? (tick applicable box/es)
building work-complete table A operational work-complete table B
q IV I
Table A
What is the nature of the building work made assessable in the planning scheme (e.g. building, repairing, altering,
underpinning, moving or demolishing a building)?
What type of approval is being sought? (if you have indicated multiple works in the above question, please use an
attachment to this form to detail each approval request)
development permit preliminary approval
q q
Are there any current approvals associated with this application? (e.g. material change of use)
List of approval reference/s Date approved Date approval lapses
Department of Infrastructure and Planning Qplan Queensland
Gnuprnmwnt
Page 12
V
Table B
What is the nature of the operational work made assessable in the planning scheme? (tick applicable box/es)
EJ road works F] stormwater water infrastructure
q
drainage works earthworks sewerage infrastructure
q q q
landscaping 0 signage F1 clearing vegetation under the planning schen e
q
other-provide details lectricity reticulation and/or street lighting
q3
What type of approval is being sought? (if you have indicated multiple works in the above question, please use an
attachment to this form to detail each approval request)
development permit El preliminary approval both-specify below
q q
Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
No Yes-specify the number of lots being created
q
3 q
Are there any current approvals associated with this application? (e.g. material change of use)
No Yes-provide details below
q
3
List of approval reference/s Date approved Date approval lapses
2. What is the dollar value of the proposed building work? (inc GST, materials and labour)
J $Unknown at this stage
3. Confirm that the following mandatory supporting information accompanies this application
Confirmation of Method of
lodgement lodgement
All applications for operational works
site plans drawn to scale which show the following:
3 confirmed
q
• the location and site area of the land to which the application relates
(relevant land)
• the north point
• the boundaries of the relevant land
• the allotment layout showing existing lots, any proposed lots (including the
dimensions of those lots), existing or proposed road reserves, building
envelopes and existing or proposed open space (note: numbering is required
for all lots)
> , heme-IDAS form 6
Version 1.0 18Oecember 2009
Page 13
I
D
HUH
• any existing or proposed easements on the relevant land and their function
• any access limitation strips
• all existing and proposed roads and access points on the relevant land
a statement about how the proposed development addresses the local 03confirmed
government's planning schemes and any other planning documents relevant to
the application
Applications for operational works involving earthworks (filling and excavating)
drawings showing: q confirmed
• existing and proposed contours
• areas to be cut and filled
• the location and level of any permanent survey marks or reference stations
used as datum for the works
• the location of any proposed retaining walls on the relevant land and their
height
• the defined flood level (if applicable)
• the defined fill level (if applicable)
Applications for operational works involving roadworks
drawings showing:
q confirmed
• existing and proposed contours
• the centreline or construction line showing chainages, bearings, offsets if the
construction line is not the centreline of the road and all intersection points
• information for each curve including tangent point chainages and offsets,
curve radii, arc length, tangent length, superelevation (if applicable) and
curve widening (if applicable)
• kerb lines including kerb radii (where not parallel to centreline) and tangent
point changes (where not parallel to centreline)
• edge of pavement where kerb is not constructed
• position and extent of channelisation
• location and details of all traffic signs, guideposts, guardrail and other street
furniture
• pavement markings including details on raised pavement markers
• catchpit, manhole and pipeline locations
• drainage details (if applicable)
• cross road drainage culverts (if applicable)
• concrete footpaths and cycle paths
• location and details for access points, ramps and invert crossings
• changes in surfacing material
Page 14
IqC
Applications for operational works involving stormwater drainage
drawings showing: confirmed
• existing and proposed contours
• drainage locations, diameters and class of pipe, open drains and easements
• manhole location, chainage and offset or co-ordinates and inlet and outlet
invert levels
• inlet pit locations, chainage and offset or co-ordinates and invert and kerb
levels
Applications for operational works involving water reticulation
drawings showing:
q confirmed
• kerb lines or edge of pavement where kerb is not constructed
• location and levels of other utility services where affected by water
reticulation works
• pipe diameter, type of pipe and pipe alignment
• water main alignments
• water supply pump station details (if applicable)
• minor reservoir details (if applicable)
• conduits
• location of valves and fire hydrants
• location of house connections (if applicable)
• location of bench marks and reference pegs
Applications for operational works Involving sewerage reticulation
drawings showing: confirmed
• location of all existing and proposed services
• location of all existing and proposed sewer lines and manhole locations
• location of all house connection branches
• kerb lines or edge of pavement where kerb is not constructed
• chainages
• design sewer invert levels
• design top of manhole levels
• type of manhole and manhole cover
• pipe diameter, type of pipe and pipe alignment
• location of house connections (if applicable)
• sewer pump station details (if applicable)
Applications for operational works involving street lighting
drawings showing: confirmed
• location of all light poles and service conduits
• location of all other cross road conduits
• type of wattage and lighting
• any traffic calming devices
• additional plans for roundabouts and major roads (if applicable)
• details of any variations to normal alignment
• details of lighting levels
Page 15
I
Applications for operational works involving public utility services
drawings showing:
3q confirmed
• any existing light poles and power poles
• any existing underground services
• details of proposed services
• alternation to existing services
Applications for operational works involving landscaping works
drawings showing:
confirmed
• the location of proposed plant species
• a plant schedule indicating common and botanical names, pot sizes and
numbers of plants
• planting bed preparation details including topsoil depth, subgrade
preparation, mulch type and depth, type of turf, pebble, paving and garden
edge
• the location and type of any existing trees to be retained
• construction details of planter boxes, retaining walls and fences
• the proposed maintenance period
• irrigation system details
Notes for completing this form:
• This form can also be used for development applications for building works or operational works assessable against
the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is mentioned, take it to
mean the land use plan for the airport land.
Privacy-pleasgT fec•ta.your assessment manager for further details on the use of information recorded in this
form.
f! ,
UZS
Ali,
hYdore
The Sustainable PianningAct2009 is administered by the Department of Infrastructure and Planning. This form and all other
required application materials should be sent to your assessment manager and any referral agencies.
>Ianning scheme-/DAS form 6
Version i. o r8 December 2009
Used in these records
Development Application - Part 1 of 2 - Covering Letter, IDAS Forms 1 & 6Related documentApplication case desk ↗
About this file
- File size
- 2.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.