Original source · versioned page text
05 Taylor Court D.a -Rfi-a
Attached to the e-mail Updated architectural and landscape plans - MCU18/0120 & RAL18/0013 OPW18/0197.
Original PDF page 2, section 3. The text section number identifies this passage in the reader.
2
19
"
c
1
e
Chan
(PDW)1.5 M PEDESTRIAN ACCESS
5 6'
4
111187 11 1
1
12
9
°
CONCRETE FOOTPATH
ge of
1
6.17
12
C5 C5
6
0.
. 00"
.2
48.8
11
SP197517
12
0.
2
61
5
5
44
9.
0.
C O O R O Y
0
4
12
90
27
grade
11
0
0.
9.
90
55
7
11
SHEET INDEX - WORKING DRAWINGS A1 COM
L
9.
W
ANDS
35
at
P t y
12
Sheet No. Sheet Name Rev Description Date
e r
0.
PWD SHARE
TENANCY 08G.F TENANCY 09G.F TENANCY 10G.F
CONTAINER
TENANCY 06G.F TENANCY 07G.F
p
25
70
LAYDOWN
1 COVER D.A- RFI-A
lo
TURNING
G.F : 66.4 m2 G.F : 77.2 m2 G.F : 76.8 m2
20 PDW
G.F : 98.4 m2 G.F : 97.2 m2
t
12
RETAIN
26
27
28
t
CAPIN
SPACE
12
e
FFL 120,500 FFL 120,500 FFL 120,500 FFL 120,500 2 Site Plan D.A- RFI-A Landscape, HRV, Footpoath
LANDSCAPING
FFL 120,500
0.
d
RETAIN
12
0.
Ba
BAY
44
80
fro
3 Parking Plan D.A- RFI-A
0.
ck
81
m
ING W
4 Floor Plans A D.A- RFI-A
o
TENANCY 11G.F
f
DB
ING W
l a
5 Floor Plans A D.A- RFI-A
G
G.F : 77.8 m2
12
Y
yb
HATCH DENOTES 12.5 x3.5 HRV LOADING ZONE
D
ALL
PROPOSED UNDERGROUND
0.
11
FFL 120,500
ac
6 Elevations D.A- RFI-A
T
MH WATER TANK REF. CIVIL ENG.
a
22
ALL
e
9.
11 .02
k
n
ls
11
06
7 Floor Plans B D.A- RFI-A
d
8.
ke
t
11
11
r
9
12
s
90
ap
r
ur
8.
116.07
11
5
8 Floor Plans B D.A- RFI-A
b
0
.6
96
fa
.6
7.
l
H o l d i n g s
11
o
21
116
3
3
3
9 Floor Plans B D.A- RFI-A
c
tt
PROPOSED
24
e
9.
7.
23
e
12 .50
91
MH
d
f
77
10 Floor Plans B D.A- RFI-A
e
12
0.
C O U R T
12
fro
atu
SP197517
11
11
H
52
0
INDUSTRIAL See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.