Information Request MCU24 0085
Figure 1 – Areas of additional gross floor area (shown in yellow hatch)
Information Required
1. Provide amended plans that demonstrate compliance with Acceptable Outcome AO11
and Performance Outcome PO11 of the Medium Density Residential Zone Code by
reducing the plot ratio to a maximum of 0.4:1.
Issue – Proposed Connection into Existing Stormwater Infrastructure
Barlow Shelley’s Roadworks and Stormwater Drainage Plan (C201, Rev. A) proposes to
connect into an existing stormwater manhole in the verge fronting 22 Grant Street, Noosa
Heads. For clarity, this “stormwater manhole” will be referred to as “stormwater pit”
In January 2023, Council approved the removal of this existing stormwater pit as part of
OPW22/0234. As part of this approval, a new stormwater lintel and pit will be constructed
further downstream. A copy of the approved plans for OPW22/0234 are attached this
information request.
Council recommends that the proposed Roadworks and Stormwater Drainage Plan be revised
to incorporate the ongoing/future works downstream.
Information Required
2. Provide an amended Roadworks and Stormwater Drainage Plan that includes the
ongoing/future works downstream (i.e., the removal and relocation of the existing
stormwater pit fronting 22 Grant Street). The amended plans must be prepared by a
suitably qualified person (RPEQ).
Page 2 of 6