2021-10-08 SM - Item 1 - Attachment 1 - Draft Coastal Hazards Adaptation Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Criteria Criteria Description
Monetary costs to build/implement an adaptation option (further
Cost detailed studies to confirm costs may be required), either by
Council or private land owners
Whether an adaptation option will have adverse impacts on
Environmental
environmental values e.g. Matters of State Environmental
Impact
Significance
Whether an adaptation option will have adverse impacts on other
Social Impact social values or is likely to have community support e.g. access,
amenity, property values
Reversible/ Whether an option is able to be ‘reversed’ or adapted to cater for
adaptable future needs
Whether an option is technically feasible (i.e. is effective in
mitigating the risk and is implementable)
Whether an option is able to be readily approved (i.e. is
Effectiveness
consistent with current planning policy or legislative requirements)
Whether an option provides a long-term solution to the coastal
hazard risk, or is suitable for use as an interim option
Table 3 - Adaptation options assessment criteria
Reference Box #3
Assessing adaptation options
Using the criteria set out in Table to score each option, a “traffic light” system was then used to group
the options for deliberation as follows:
Proceed (‘GO’): an option is considered suitable with no other adverse impacts, and requires no
further development (i.e. studies, design etc). These could also be defined as “No Regrets”
options
Investigate Further (‘SLOW’): an option may be suitable, but should be subject to further
detailed assessment at specific locations e.g. cost-benefit analysis or lot-scale surveys
Unfeasible (‘STOP’): an option is not considered suitable at a location and may not be
considered for further detailed analysis.
Having gathered information on potential adaptation options, an important next step in the project
was to undertake more detailed and rigorous socio-economic analyses (known as a cost-benefit
analysis) of the short-listed options using a range of social, environmental and economic criteria,
data and other information. This component was critical to informing the selection of the adaptation
actions presented in this plan.
For the most part, options included for this final stage of analysis were those that scored highly
within the ‘Investigate Further’ category. In addition, based on feedback from Council staff and the
community, it was determined that a number of options rated as ‘Unfeasible’ should also be
included to provide greater certainty and confidence that these actions should not form part of a
coastal hazards adaptation plan for Noosa.
Noosa Council – Coastal Hazards Adaptation Plan Page 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.