               25.    Easements of between 3 and 10 metres must be provided over all Unitywater sewers located
                      within property boundaries in accordance with the SEQ standards. Easements shall be
                      centred over the pipe. Easement terms shall be the most current registered dealing held by
                      the Department of Natural Resources & Mines and shall not be altered or amended.
               26.    Written approval to enter and construct must be obtained from the owners of properties
                      through which external watermains will traverse. This must include approval for an easement
                      over the mains, and be submitted with lodgment of the associated development application
                      for Operational Works.
               27.    A minimum clearance of 1.5 metres must be maintained between Unitywater sewers and
                      proposed building envelopes, buildings and other structures.
               28.    Stormwater retention systems and gross pollutant traps must maintain a minimum clearance
                      of 1.5 meters from Unitywater water supply and sewerage infrastructure
               29.    Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from Unitywater
                      water mains and 1.5 metres from Unitywater sewerage mains. Landscaping plants within
                      these clearances must be low growing when mature and suitable Unitywater approved
                      varieties.
               30.    Construction works undertaken in the vicinity of Unitywater water supply or sewerage
                      infrastructure must not adversely affect the integrity of the infrastructure. All costs associated
                      with repair, replacement or alteration of infrastructure must be met by the applicant.
               5.     REFERRAL AGENCIES

               Not Applicable
               6.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
                      Building and Construction Industry (Portable Long Service Leave) Levy
               1.     The QLeave levy must be paid prior to the issue of a development permit where it is required.
                      Council will not be able to issue a Decision Notice without receipt of details that the Levy has
                      been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212 6855.
                      Co-ordination of Operational Works Assessment
               2.     Additional application fees apply to Operational Work applications where the different
                      aspects of the works are lodged separately. Significant savings in application fees will result
                      if all works are lodged in a single application.
                      Preparation of a Preliminary Construction Management Plan
               3.     A preliminary Construction Management Plan must be submitted with the Operational Works
                      application and must address the following:
                      (a)     traffic management during all aspects of the construction phase including:
                              (i)    a Traffic Management Control Plan in accordance with the Manual of Uniform
                                     Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
                                     control measures prior to construction
                              (ii) maintenance of safe pedestrian access for the areas affected by the works during
                                     and after daily construction has ceased
                              (iii) proposed fencing to the site during the construction phase of the development
                              (iv) approval of the Traffic Management Control Plan by the Department of Transport
                                     and Main Roads (DTMR) for any works on State controlled roads
                              (v) provision for worker car parking



                                                                                                           Page 5 of 8
Document Set ID: 20709606
Version: 4, Version Date: 05/10/2018                                                                Print Date: 5 October 2018, 11:29 AM
Log in to download the original file

Attachment E - Previous Extension to Currency Period 5-10-18.pdf · 217 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.