Referral Agency Response - Minor Change - RAP22 0036 01 [As Published]
Performance Bond
6. Security in the form of a cash bond or trading bank guarantee to the sum of $5,000 must
be submitted to Council, to secure performance of all conditions of this approval, prior
to the issue of a Development Permit for Building Works. The cash bond or trading bank
guarantee will be returned on performance of the conditions of approval less any costs
incurred by Council in respect of enforcing performance of this permit. Council reserves
the right to call upon the bond or guaranteed sum to effect compliance with conditions.
Landscaping
7. A minimum of 20% of the site must be retained or consist of soft landscaping.
8. Existing trees on the site must be retained, except where required to be removed to
accommodate the approved dwelling. In this regard, the removal of vegetation must not
extend beyond 3 metres of the building footprint.
9. Existing vegetation in the road reserve must be retained, unless written authorisation
from Council is granted for the clearing.
Flood Immunity, Drainage and Earthworks
10. The minimum floor levels of all habitable rooms must be at least 300 millimetres above
the Defined Flood Event (DFE).
Sunset Clause for Referral Agency Response
11. This Concurrence Agency response is no longer valid if the use has not commenced
within 4 years of the date of this notice, unless otherwise extended in writing by Council.
Site Access and Driveways
12. A sealed access driveway must be provided from Noosa Parade to all parking and
manoeuvring areas of the development.
Stormwater Drainage
13. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge without causing scour or damage to the subject site or any adjoining
properties.
Earthworks and Retaining Walls
14. All earthworks and associated retaining structures/batters, both above and below
ground, both temporary and permanent, must be contained entirely within the subject
site unless written permission from the respective landowner(s) is provided to Council.
All earthworks must be undertaken in accordance with the provisions of Australian
Standard AS3798: Guidelines on Earthworks for Commercial and Residential
Developments.
15. Where the development involves excavation or filling over, or adjacent to, drainage,
water supply or sewerage infrastructure, all access chamber surface levels must be
adjusted to provide a freeboard of 100mm above the finished ground surface level.
16. All retaining walls must be designed and constructed in accordance with the planning
scheme and must be certified by an RPEQ where exceeding 1.0m in height. All retaining
walls that are publicly accessible and exceed 1.0m in height must be fitted with a
commercial grade safety fence.
Damage to Services and Assets
17. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
Page 3 of 4
Document Set ID: 22664648
Version: 3, Version Date: 16/11/2023