Original source · versioned page text
2016-07-18 General Committee Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 18 JULY 2016
The new cell 2.2 at the Eumundi Road Resource Recovery Centre has been commissioned
and began accepting waste on 26 February 2016.
The Waste Management Contract 2017-2024 tender documentation has been prepared with
tenders advertised on 1 July 2016.
A significant amount of work has been undertaken to establish the Electric Bus trial. The trial
was delayed due to supplier issues and will commence late in 2016 or early 2017. Council
continued its free holiday bus program in 2015/16.
Corporate Plan Priority 7 – Diversification of our economy
While recognising our world class tourism industry, the Council will also focus on diversifying the
economy with an emphasis on “smart economy” businesses and rural futures.
Key achievements include:
Council adopted the Noosa Local Economic Plan following extensive consultation via a Focus
Group. A report by AEC analysing the Noosa Economic Profile has also been published.
During 2015/16, Council continued to have a very close working relationship with Tourism
Noosa. We jointly developed the Noosa Sporting Facilities Guide which is designed to attract
events and sporting groups to Noosa. This was launched in March 2016.
Council adopted a Masterplan for the Rufous Street site at Peregian Beach following an
extensive community consultation process including a design charette. The development
application has been lodged and preparation is underway for a funding application to the
Commonwealth government.
The Council developed RV Park at Cooroy opened, including a waste dump facility, and
appropriate management arrangements were put in place.
During 2015/16, support was provided to encourage the ongoing development of the ICT
sector in Noosa. Council was a partner in an innovation networking event and a sponsor of
the GovHack event. We also provided data sets to the GovHack event.
A #NoosaConnects networking event was held by Council in conjunction with CCIQ at The J
in March 2016. This business networking evening was attended by over 200 people to
connect with industry and government funding and other support bodies. It was very well
received by the Noosa business community.
During 2015/16, Council approved 98% of development applications with the number of
applications showing a steady increase in activity. We met statutory assessment timeframes
for most types of applications except for MCUs and to a much lesser extent, Op Works
applications. The complexity and issues involved in MCU applications meant that statutory
timeframes were met between 60% and 80% of the time. Building and Plumbing approval
timeframes remained significantly better than statutory requirements. There has been a
significant improvement in building approval times in the last two years.
A considerable amount of time has been spent on building strong working relationships with
key business groups. This includes, for example:
o Support for the Noosa Junction Association and Hastings Street Association (and ongoing
funding via levies); and
o Regular liaison with CCIQ Cooroy and CCIQ Noosa etc.
Page 38 of 41
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.