‘Assessment Checklist”
for Building Works

 

 

acy peers is for the purposes of Building Services to assist them interp Noosa Plan and implement the Integrated Dee
fect Peay (IDAS) PMI ee eka aera eg| a ;

oil) Perea Emit eve les iii secre , rr
As ese Uo ue and who is respo gene oe ect og

  

 

   

" sreetaddess 2S WEI DE NES SA
lot 7B: Roa “ROOTS

   

 

 

 

Additional Zone if mule:
Precinct if applicable (Noosaville only):

ere ee)

Biodiversity Overlay: ;
AS
{

Natural Hazared (andSidea. food) Overay. a)

SUE treaty Cow (SO

Natural Hazard (fire & ASS) Overlay:

mad _ B/ Etec wade

Netra Resources Overlay.

 

  
   
 

 

 

 
   
 
  
   

 

Heritage Overlay: \

 

 

 

 
 
 
 

 

   

Material change of use of premises (MCU) if itis the c commencement of a new use or a change
_in the intensity or scale of the existing use__ NID

Building work

 

 

 

 

 

 

 

 

 
Full text of the other 37 pages

Page 2

 
  

Sa ae

   

OIE Meee a Om Len eee ee —_ -
of é ent:---.4 The actions below will assist in determining whether the develépment activities involved in the proposal
[ae assessable under The Noosa Plan, _ oo .

 
 
  

 

 

  

Se ieees
vel of assessment:

 

 

     
  

 

 

 
 

 

 

 

 

| Level of assessmen .ssme It

 

  
 
 
 

   

Othe assessment tab)
eet, ee ee

 
 

Level of assessment:

    

 

| Level of assessment:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 3

INTEGRATED PLANNING ACT 1997 : . Part A, Version 2.4, 29 May 2006

   

Form 1 Development Application

Y Common details

The completion of all applicable questions on Part A is mandatory for all applications. Part A must be accompanied by the completed IDAS Assessment Checkist if
required, and by one (1) or more other completed parts of the Form as required. For more information on the parts of the Form refer to www. ipa.qld.qov.au.
Any information requested in the form may be provided in an attachment to the application. For further Information about completing the following details, refer to Guide 1.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Description of land 1. Street address: (ncludinghouse number, street name, suburb/tocality name & postcode) (if applicable)
Alltand the subject of the application, must be Zz

- Lin ste te | (eS AKA De  Vodsa Hear, 456)
Esralanddharncllnieiy orth iad 12. Name of water body or watercourse, within which the development is proposéd: (f applicable)
Advica for completing Q2 - 02 it
development is propased within aa body oF | ~ |
watecourse. 3. Lot on plan description (eg. Lot 123 on RP 4567)/ GPS coordinates:
Advice for completing Q3 - Most land can be
idenGfed by aft on plan description. These deta [28 RP 74023 |
canbe caine’ fom Be documents or trowsh te | 4 The above description is for: (ck appficable box)
However, ireland on which the development is (1) _ the land.on which the development is.proposed; or
PCO OE a eee (Gil) the tand adjoining the water body or watercourse, within which the development is
watercourse) provide > proposed; or
8 a eset Lill) the water body or watercourse. '
Fe atentld (ontario Bay.  |5- Shop/tenancy number: 6. Storey / level: 7. Total area of tand: (m? or ha):
Advice for completing Q7 - Q7 does ifthe . :
Ate ot cares | L | | _|
ee a a rrnert see 8. Local government area in which the land is situated: (eg. Esk, Hervey Bay, Woocoo etc, (i applicable)
Noto: Areas below high water mark within :
focal government's me inlsspoied fr ander the [We est S ff (RE -
Local Sore 1993. os ‘ 9. Port authority for the strategic port land or strategic port land tidal area on which the

Sense pet falrpens strlen development is proposed: (eg. Port of Brisbane, Port of Townsville) (#f applicable)
port land fidal area. For more details refer to Guide 11 [ ]
Proposal details 10. Existing use of the land: (eg. vacant, single house, shop etc.)
"heres inuficint room avait datas may be [ YWléie~ HOuS& |
11. Proposed use of the land: (eg. 6 unit apartment building, 30 lot residential subdivision, ERA for aquacutture in
ponds with a total area of 7 ha for which westes are released into waters etc).

Other applicable parts of Form 1 12. Other parts of Form 1 completed as part of this application: (eg. Part D, Part , etc)
Part A must afways be accompanied by other | |
completed parts of Form 1. For information about

 

when a part of Form 1 may apply refer to Guide 1.

 

 

 

 

Applicant details 13. Applicant's name: ‘ 15. Contact person:. °

sonicated ao ete omer o one “ [Akreee Commins [Tony ZTaexsonw |
_ When signing and lodging this application =. §— (14. Contact number: 16. Facsimile number/e-mail address:

The . ;

Iomation pried scores Te aeesonent CHF 7PE4YOS ) | | :

 

manager, any referral agency & the Chief Executive
(where apocbl)wl rly on tis information when 17. Postal address:

 

 

Ips cafcan ian caments-accntt pecs [0 .. Z8KQ0O3¢ Voes4 Aerss  ¥¢567
imust bo Shown, 18. Signature: 7) LT 19. Date:

 

 

 

(Za Lo? RE.03.07

 

Page 4

 

INTEGRATED PLANNING ACT 1997

Land owner's consent (if applicable}

Section 3.2.1(3} of the IPA prescribes thal an
application must contain, or be supported by, the
writien consent of the Land owners, if the application
involves:

{) a material change of use,

{—) reconfiguration of 2 lot,

(8) work on land below high-water mark & not within a
canal as defined under the Coastal Protection and
Management Act 1995,0r

{¥)- work on rail corridor land defined under the
Transport Inrestructure Act 1994.

Section 3.8,1(2}(a) of the IPA provides that

fandowner’s consent is pot required for a mobile or

temporary ERA

For more information refer to Guide 1, -

20.

. Part A, Version 2.4, 29 May 2006
Land owner's consent to the making of this application:

 

 

Name ) Signature 7 Date’
9 Asrces Comoe be a a
On ein fe
(ii)
wo
Wo ET

 

 

 

 

 

 

 

 

 

 

 

 

 

 

‘An application should be accompanied by details to
support the proposal & enable the assessment
manager, referral agencies and any person viewing
the application during public scrutiny or public
natification to understand the scope of the proposal
and any potential impact.

 

Resource entitlement (if applicable) - 21. Does this application involve a State resource prescribed under a regulation (other than involving
Section 3.2. 1(5) of the IPA requires evidence of quarry material on State coastal land under the Coastal Protéction and Management Act 1995)?
resource entidement be given for applications that
involve a prescribed State resource. i NO - goto. a24 YES - goto 922
sonication gamete taken tobe propery s thal an 22. This application is accompanied by evidence: (tick applicable box)
without evidance of the panied enliterent C1 (i) of the allocation of, or entitlement to, the resource - attach evidence and go to Q23(v)
Rafer to schedule 10 of the Infagrated Planning - (J (ii) the chief executive of the department administering the resource is satisfied the
Regutation 1998 that prescribes the natura of evidence i q i i i -
Raat by the Shee a te re whe development is consistent with an allocation of, or entitlement to, the resource - go
development application. a a . weg e a nee
O (ii) the chief executive of the department administering the resource is satisfied the
development application may proceed In the absence of an allocation of, or
entitlement to, the resource - go fo Q23
Advice for completing 73 23. Evidence of the resource entitlement.
ee ae f {) is mandatory evidences (i) Resource entitlement / authority details (vil) Official stamp of the department
The official stamp of the Department of Natural administering the resource (if
Resources, Mines and Water is mandatory where the _ applicable)
application involves any water or riverine quarry (ii) Name of delegated officer _.
material under the Water Act 2000. CT
fection 82.14) allows the resoute wlan oii -
me : rust S a
a aha onion tt oa. (iil) Position of a officer
{v) Date
(vi) rem date of evidence (if applicable)
Assessment triggers 24. Is the IDAS Assessment Checklist completed and attached to this application?
This checks does not apply i! the application requires CO yes [INO - the assessment manager may refusa to accept this application on the
Ee eat rans a be epi ha rt ee ep nate
Plans | drawings / reports 25. Ptans/drawings/reports accompanying this application:

 

Pian / Drawing / Report Number

 

 

 

 

 

 

 

PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of fodgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 1. .

 

OFFICE USE ONLY (applicable to assessment manager's)

 

 

 

FEE) DATE RECEIVING OFFICER'S |
Notification of Engagement of Private Certifier (Optional format)
To. Council. | have been engaged as the private certifier for the building work referred to in this application.

 

 

Date ofengagement: / /

Accreditation Number:

 

___ Name: Signature:

 

Page 5

 

INTEGRATED PLANNING ACT 1997

4

    
 
 

Form 1 Development Application

Operational &/or building work

assessable against a local government's planning scheme

Part E, Version 2.0, 4 October 2004

  

 

 
 

 

 

Completion of all question on Part E is

Mandatory for ail applications involving the assessment of operational work and/or building work (including defaited

engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual design plans for engineering & building work when the application does -
not ivolve assessment of @ material change of use of premises at the same time) assessable against a local govemment's planning scheme.

 

Nature of the application

A development permit authorises
development to occur, while a prefiminary
approval is a step in the approval process
and does not authorise development to occur.
The types of work that are assessable against

1.

This application is for (tick one (1) or both if applicable)

Ci Preliminary approval - provide details of the type of work eg. roadwork, stormwater, water and sewerage
infrastructure, eft

 

 

 

 

 

a planning scheme are determined by the AND/OR
wane for a partculr local goverment and [a Bevelopment permit - provide details of the ype of work eg, roadwork, stormwater, water and sewerage
To determine the types of work that are structure,
assessable under a particular planning [ : |
scheme, contact the relevant local
goverment. 2. Are the works subsequent to a previous development approval? .
—LW0 (71 YES - provide details of all previous approvals (eg. file references) °
3. \s the subdivision for a canal estate?
Tio yes
Portable Long Service Leave levy (if |4. ts payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?

applicable) .
Prior to issuing a development permit for the
works, the assessment manager is required
by law to “sight” an approved form, issued by
Qleave, which signifies that the PLSL levy
has been paid.

 

(YES - complete 05
LMNO - 05, 6 & 7 co not apply

Has the PLSL levy been paid?
[YES - compreteas
(C1 NO - the applicable levy must be paid before a development permit can be given for the works

How much was paid?
Whatis the receipt number of the payment?”

L |

 

 

 

PLEASE NOTE

This application cannot be accepted unless accompanied by Part A of Form 1.

The assessment manager may refus

 

e to accept an application that, at the time of lodgement, fails to provide all applicable information
requested by Part A and any other relevant part of Form 1.

 

OFFICE USE ONLY (appiicabie to assessment manager)

 

 

DATE RECEIVED

REFERENCE
NUMBERIS

 

 

 

 

Page 6

INTEGRATED PLANNING ACT 1997 . : Part E, Version 2.0, 4 October 2004
(i) 1s aPLSL levy applicable in this instance? LJNo (YES - complete afi

 

(ii) Has the approved form (issued by QLeave and which signifies that the PLSL levy has been paid) been sighted by the assessment’
manager / private certifier at the fime of lodgement of this application?

CNo [DYES - provide receipt detaits below

 

 

 

Page 7

i

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 19.0, 2 March 2007

 
    

Aw Form 1 Development Application
IDAS Assessment
Checklist

 

(Formerly the “Referrals Checklist”)

IMPORTANT NOTE FOR ALL APPLICANTS: |

 

1.

This checklist was formerly referred to as the “Referrals Checkiist’ Some of the ‘Guides’ to using the IDAS Application Forms continue to refer te this document as the
“Referrals Checklist’. The name of this checklist was changed from 25 July 2005 to more accurately describe its function.

 

 

 

2. Under the IPA and IDAS tramework, an application may require assessment by the locat Council and/or certain Queensland State entities (e.g. Environmental Protection
Agency, Dept. of Natural Resources and Water, Queensland Heritage Counci etc.).

3. This checklist is provided to assist applicants to determine when an application Tequires assessment by a Queensland State entity and may also assist the applicant to
determine the assessment manager" for the application.

4. Therefore, the completion of al Questions in section 1 of this checklistis mandatory for ail applications (other than those requiring the completion of Parts A & B only).

§.  Itis the responsibility of the applicant to accurately complete this checklist.

6. Section 2is mandatory only if the proposed development is located in any part of a wild river area declared under the Wild Rivers Act 2005.

7. Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.

8. The assessment manager for the apptication will rely on the information provided in this checklist (as well as any material lodged In support of the application) to identify
any applicable referrat agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
application triggers seferral coordination.

9.  Toassist you in answering the following questions a series of guides are available free from the IPA website www ipa gld.gov.au. Guide 25 explains the role of the IDAS
Assessment Checklist in the [DAS application process, and its relationship to the Form 1 development application.

10. Any other parts of Form 1 that this checklist requires to be completed are available fromthe Councit or the applicable State entity, or can be downloaded free from
www. ipa.gid.gov.au.

11. Section 3 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006.

SECTION.1 - STATE ASSESSMENT. (completion mandatory) OP oe
| * Note: The following state assessment triggers apply to development other than for building work assessable against the Building Regulation 2006. : 3

Environmentally relevant activity 1. The application n involves: (lick applicable box/es)

For mare information refer to Guide 4. (6) an environmentally relevant activity (ERA) for which a code for environmental compliance

Untess you answered “none ofthe above" to 1, has not been made - complete Part G of Form 1

the application requires assessment by the be : . . "

inistering aulhority?, (1 (ii): a mobile or temporary ERA for which a code of environmental compliance has not been

i an entity, other than the administering made - complete Part G of Form

aulhority, is the assessment manager for the Ww (iii) none of the above

application, ihe administering authority is 2

concurrence agency for the application in relation
to this matter.

Note: An application involving ERA 19 and/or 20
will also require completion of Part Ky of Form 1

for

Act 2000 is required.

‘approval where an allocation under the Water;

 

 

Continued overleaf

 

PLEASE NOTE: ° The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed IDAS Assessment Checklist (if applicable}.

 

OFFICE USE ONLY (appiicabie fo assessment manager)

 

f
L

DATE RECEIVED REFERENCE NUMBERIS :

 

The assessment manager Is responsible for assessing and deciding an IDAS application. The assessment manager for an application is prescribed in schedule 8A of the IPA.

For additional information refer to Guide 6 ‘Does my application trigger the refesra! coordination process?’

The ‘administering authority’ may be either the Environmental Protection Agency, the relevant local goverment {for a devolved ERA) or the Queenstand Department of Primary Industries and
Fisheries (for a delegated ERA).

Page

Page 8

INTEGRATED PLANNING ACT 1997

State-controlled road matters
For more information refer to Guide 3.

Unless you answered ‘none of the above" to Q2,
- the application triggers referral to the Department
of Main Roads (DMR) as a referral agency.

tn certain circumstances DMR will be an advice
agency, while in other circumstances DMR will
be a concurrence agency.

Schedule 2 of the (P Regulation will assist you to
determine where DMR is an advice or
concurrence agency for the application.

IDAS Assessment Checklist, Version 19.0, 2 March 2007
2. The application involves: (tick appicable boxes)
C1 (i) development on land contiguous* to a State controlled road and for -
(0 @) material change of use assessable against the planning scheme;

[_] (b) reconfiguring a lot unless -
+ the total number of lots is not increased; and
+ the total number of lots abutting the State-controlled road is not increased;

C1 (©) operational work (not associated with a material change of use assessable against the

planning schema or reconfiguring a lot mentioned in (b) above)"

+ associated with access to a State-controlled road; or

» for filling or excavation; or :

° involving the redirection or intensification of sie stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlied road. ,

. [1 fii) development on land not contiguous to a State-controlled road and -

Di (a) material change of use -
+ assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
LD (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP tegulation
and exceeding the thresholds set by that schedule;
(O(c) operational work (not associated with a material Change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above)—
+ assessable against the local government's planning scheme; and
+ mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule. .

(A (ili) none of the above

 

Clearing vegetation:

For more information refer to Guide 12,

Unless you answered ‘none of the above” to 3,
* the application requires assessment by the

Department of Natural Resources and Water

(NRW).

{fan agency other than NRW is the assessment

manager for the application, NRW is a

concurrence agency for the application in relation

to this matter.

If you ticked Q3(i) or (ii), your application requires

referral to NRW for assessment regardiess of

whether vegetation clearing is proposed of not.

3. The application involves: (tick applicable box/es)
C1 (i) material change of use ~ .
(a) assessable against the planning scheme;
(b) on a lot containing -
* acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
+ if there is no property map of assessable vegetation for the lot - remnant vegetation;
(c) where the existing use of the land is a rural or environmental use; and
(d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
reconfiguring a lot —
(a) on alot containing a category 1, 2 or 3 area shown on a property map of
“~ assessable vegetation or, if there i is no 10 property map of assessable vegetation for
the lot, remnant vegetation;
(b) where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and
(d)_ where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
operational work -
(a} for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and

|
|
(b) not associated with a material change of use assessable against the planning. |
|
|

scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form 1

Liv) none of the above.

C) (i)

Diy

 

Strategic port land

For more information refer to Guide 11.

Hf you ticked (i) - the relevant Port Authority is the
assessment manager for the application.

Hf you ticked (ji) Queensland Transport is a
concurrence agency for the application.

4. The application involves:

 

{J (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (Tl
Act) - complete Part f of Form 1

C) (ii) a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - complete Part { of Form.

[2 (iii) none of the above

 

 

4 Land contiguous to a State-controlled road is defined in schedule 14 of the IP Reguiation to mean tand - if part of the land is within 100m of the State-controlied toad; or that is part of a future State-

controlled road.

Page 2

 

Page 9

INTEGRATED PLANNING ACT 1997

Acid sulfate soils

For more informaton refer io Guida. 10.

Uniess you answered “none of the above” to 05,

the application requires assessment by

Department of Natural Resources and Water

(NRW). , .

If an agency other than NRW is the assessment”

manager for the application, NRW is an advice

agency f for the application it in ‘elation to this
matters. ”

 

IDAS Assessment Checklist, Version 19.0, 2 March 2007 __
The application involves development on land situated in an identified5 focal government area
and where the surface of the land is: (tick appiicable box)
(Qi) below 20m AHDé and the developmer.t will involve the excavation af 1000m? or more of
soil or sediment at or below 5m AHD, or
(1 (il) at or below 5m AHD and the development will invotve filling the site with 4000m? or more
of materiat

i ci none of the above

 

Major hazard facilities or possible
major hazard facilities

For more information refer to Guide 17. -~

if you answered "YES" to 06, the application
fequires assessment by the Department of
‘Emeraency Services (DES).

tf an agency other than DES Is the assessment
manager for the apptication, DES is a
concurrence agency for the application in
relation to this matter,

Does the application involve a material change of us use for a@ major hazard facility or possible
major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?

kno

LD YES - complete Part L of Form 4

 

Water related development under the
Water Act 2000

For mare information about Items (a) — (f}, refer
to Guide 15. For more information about item
(9), refer to Guide 14 Does my application .
involve assessment of a referable dam? q
Unless you answered ‘none of the above! to a7,
the application requires assessment by the
Department of Natural Resources and Water
(NRW). eet
If an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
felation to this matter.

The application involves:
(i) operational work, for taking or interfering with water under the Water Act 2000, that is:
(lick applicable box/es) .
(1 (a) ina watercourse, lake or spring, (eg. a pump, gravity diversion, stream re-direction, weir or
dam) - complete Part Ke, K3; Ks, Ke, or Ke of Form 1 whichever is applicable,
(C1 (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
Kr of Form 1; ‘ /
(1 () for a subartesian bore, in declared subartesian area’, or in a certain area covered
by a water resource plan, for use for purposes. other than stock and/or domestic
uS@ - complete Part Ks of Form 1;
(2 ) fora subartesian bore, in certain declared subartesian areas, for use for stock
and/or domestic purposes - complete Part Ks of Form 1;
(Je) for taking overland flow water in certain areas covered by a water resource Pian
— complete Part Ks of Form 1;
(J () for interfering with overland flow water in a drainage and embankment area -
complete Part Ky of Form 1
(11 @Q) for constructing a referable dam? or works that will increase the storage capacity
of a referable dam by more than 10% - complete Part Ks of Form 1; OF

Bi) none of the above.

 

Removal of quarry material from a
watercourse
For more information refer to Guide 16.

If you answered "YES" to Q8, the application
requires assessment by the Department of
Natural Resources and Water (NRW).

If an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application In
relation to this matter,

Note: Part G of Form 4 is required to be
completed as the activity of removing quarry
material from a watercourse is also an
Environmentally Relevant Activity (ERA).

 

Does the application involve development for the removal of quairy material from a watercourse®
Tequiring an allocation notice under the Water Act 2000?

INO

(1 YES - complete Parts Kr and G of Form 1

 

5 The identified ocal govemment areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Caims, Cafllope, Caloundra, Cardwell, Carpentaria, Cook,
Cootoola, Dounglas, Fitzroy, Gladstone, Goi Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mifum Vale, Momington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday,

Austraflan Helght Datum {AHD}.

an

9 Watercourse ts defined In sch 10 of the IPA.

‘The declared ground water areas are listed in Guide 13 Develo; in area.
Reterable dam is defined under the Water Act 2000.

Page 3

Page 10

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 19.0, 2 March 2007
Operational work that is tidal work or |9. The application involves operational work that is: ( tick the applicable boxes)

tw “kin wo asta] management 8 istrict C1 (i) tidal work" as defined under the Coastal Protection and Management Act 1995 (the
more information about prescribed Sood bel work in Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; oF
local government tidal areas refer to oat , D1 (ii) tidal work that is prescribed tidal work" other than in a canal'2 -complete Part P of Form 1: 0F
Unt fed “none of the above’ to Q9, se . ere scart
tho appcation requis assessment by he. O (iii) carried out within a coastal management district under the Coastal Act and for - complete
Environmentat Protection Agency (EPA). Part M of Form 1 if any box/es (a) to (i) below are ticked. .
If an agency other than EPA is the assessment ” C1 {a) constructing or installing works in a watercourse between MHWS and HAT (ie.
Cae oreo a be aptcaion in other than those works in tidal water) Where the development has been determined not
falation to this matter. to be assessable against the Water Act 2000 ;
a government's the assessment manager £1) (b) constructing a canal’? intended to be connected to tidal waters;
for seri jal work. . oa .

apes (J (c)_ constructing an artificial waterway:

[@) reclaiming land under tidal water;
(e) disposing of dredge spoil or other solid waste material in tidal water;
Cf) _ interfering with quarry material on State coastal land above high-water mark;

(2) @) draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark; .

(1(h) removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;

C1 (i) constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or

Lx{iv) none of the above. .

 

Operational work below high water | 10. The application involves operational work that is: ( tick the applicable box/es)

 

Hi tt information eter to Gulde 18. For (1 (i) tidal work! as defined under the Coastal Protection and Management Act 1995 (the
more information about prescribed tidal work in Coastal Act) that is not prescribed tidal work ~ complete Part M of Form 1; or

te government “ areas a sou 2. C1 (ii) tidal work that is prescribed tidal work" - complete Pant P of Form 1: oF

Infess you answered “none of the above” to eee . we en :
Q10, ihe appicaton triggers referral to LD (ii) carried out within a coastal Management district's under the Coastal Act and for -
Queensland Transport {QT} (Maritime Safety , . ‘ . ees .
ig) as a concurrence agency. : Of efaposing of dredge spoil or other solid waste material in tidal water - complete Part
Locat government is the assessment manager om > .
{or all prescribed tidal work. [1 (b) reclaiming land under tidal water - complete Part M of Form 1; or

C1 (c) constructing a canal’, if the canal is associated with reconfiguring a lot - complete
Part M of Form 1;

[D4 (iv) none of the above.

 

 

Coastal management 11. The application involves: (tick the applicable box/es)
For more information refer to Guide 18. (1 (i) a material change of use assessable under a planning scheme involving operational
Unless you answered “none of the above” to work carried out completely or partly in a coastal management district's
Q11, the application requires assessment by the Ae . . . . cpa
Environmental Protection Agency (EPA). OO (ii) a material change of use assessable under a planning scheme involving building
If an agency other than EPA is the assessment work, carried out completely or partly in a coastal management district that is -
for the application, EPA i . . .
coneayenee agency for the apalcaton in + the construction of a new premises with a GFA" of at least 1000m?
relation to this matter. « the enlargement of the GFA of existing premises by more than 1000m?2

OO fii) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district

LI (iv) reconfiguring a lot!” assessable under schedule 8 of the IPA and in connection with
the construction of a canal!? - complete Part M of Form 1

Ay) none of the above

 

 

10 Tidal work is defined in sch 10 of the IPA. .

11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.

12 Canal means canal as defined under the Coastal Protection and Management Act 1995

13 Tidal work is defined in sch 10 of the IPA.

14 Prescribed tidal work is defined in the Coasta! Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local goverment tidal area.

15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protaction and Management Act 1995, other than an area declared as a
coastal management district under section 47(2) of that Act. . :

16 GFA is defined in sch 1 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go lo the planning scheme against which the application is being assessed.

17 Under s117 of the Coasta! Protection and Management Act 1995, an ‘application for reconfiguration, where the reconfiguration is associated with the construction of an antificial waterway, must be
accompanied by the appication for the operational works to construct the artificial waterway.

Page 4

Page 11

INTEGRATED PLANNING ACT 1997
Development within the limits of a
port

For more information refer to Guide 18. For

information about prescribed tidat work refer fo

Guide 24,

If you answered “YES” to 012, the application

Wiggers referral to the Port Authority.

“The Port Authority i isa concurrence agency if the
development is —

© within 200m of a shipping, channel or anentry
and exit shipping corridor for the port

©  iwithin 1000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage or spoil
grounds;

* within 1000m of a planned port facility
identified in a land use plan approved under
the Transpoit Infrastructire Act 1994,

In all olfier situation the Port Authority Isan

advice agency.

Marinas ~

For mofa information refer to Guide 18, For
information about whether’a marina is prescribed
tidal work refer to Guide 24. The local .
government is the, assessment manager for alt
prescribed tidal work,

If you ariswered "YES" to Q43, the application

triggers referral to Queenstand Fire and Rescue
, Service as an advice agency, -

 

12.

13.

(DAS Assessment Checklist, Version 19.0, 2 March 2007
Does the application involve development below high water mark? and within the limits of a port
under the Transport Infrastructure Act 1994? :

BNO

(71 YES - complete Pat M of Form 1, or Part P of Form 1 if the work is prescribed tidal work

Does the application involve operational work that is tidal work for a marina‘? with more than 6
vessel berths?

fano

oO YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work

 

Tidal works in strategic port tand tidal
areas

For more information refer to Guide 18,

Unless you answered "NO’ to Q14, the relevant

Port Authority is the assessment manager for he
application and the Environmental tion

Agency (EPA) and Queensland Transport {QT)
are concurrence agencies for the application.

. Does the application involve tidal works within a strategic port land tidal area2°?

Ne)
(1 YES - complete Part M of Form 1

 

Does the application involve development in a heritage registered place as defined under the

 

Heritage 15.

For further information refer to Guide.19. Queensland Heritage Act 1992?

(f you answered “YES” to Q15, the application

triggers referral to the Queensland Heritage a NO

Council as concurrence agency for the 1 YES - complete Part C of Form 4

application.

Declared catchment areas 16. The application is in an area declared to be a catchment area under the Water Act 2000 and

For mare Information, inchuding a list of the
declared catchment areas within Queensland,
refer to Guide 13.

Unless you answered “none of the above” to
Q16, the application requires assessment by the
Department of Natural Resources and Water
(NRW).

If an agency other than NRW js the assessment
manager for the application, NRW is a
concurrence agency for the application In
elation to this matter,

 

involves: (tick the applicable box/es}
C1 (i) reconfiguring a tot if any tot resulting from the reconfiguration is less than 16 hectares;

C1 (ii) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994;

none of the above

ti)

 

18 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
19 Marina ls defined In the Transport Operations (Maritime Pottution) Regulation 1995,
20 Strategle port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land.

Page 5

Page 12

INTEGRATED PLANNING ACT 1997
Contaminated land

Applications involving material change of use
and/ or reconfiguring 2 lot may trigger this
referral.

For more information refer to Guide 5.

Unless you answered “none af the above” to
Q17, the application requires assessment by the
Environmental Protection Agency (EPA). If an
agency other than EPA is the assessment
manager for the application, EPA will be a
concurrence agency for the application in
telation to this matter.

17.

IDAS Assessment Checklist, Version 19.0, 2 March 2007
The application involves: (tick the applicable box/es)

(1 (i) reconfiguring a fot for which all of part of the premises are —
(a) premises mentioned in the IPA, schedule 8, part 1, table 2 -
+ item 5, including the exemption otherwise provided for by paragraph (d);
» item 6, including the exemption otherwise provided for by paragraph (e); or
+ item 7, including the exemption otherwise provided for a mining activity or petroleum -
activity; or
(b) in an area for which an area management advice has been nagiven for unexploded
ordnance - complete Part N of Form 1
Oi (ii) a material change of use -
(a) made assessable under the.IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessable against the planning scheme and if all or part of the premises is in an area

for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1

fe) none of the above

 

Electricity infrastructure

For mora information refer to schedule 2of the IP
Regulation.

Unless you answered “none of the above" to
Q18, the application triggers réferrat to the

agency to which the easement is granted in
favour of as advice agency.

18.

The application involves: (tick the applicable box/es)

Li) reconfiguring a lot where any part of the lot is - :

* subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or

« situated within 100m of a substation site;

C1 (ii) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if -

* any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and

+ any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;

(J (iii) a material change of use, assessable against.a planning scheme and not associated
with reconfiguring a lot if any part of the premises is situated within 100m of a substation
site;

CI (iv) operational work that is filling or excavation assessable against the planning scheme,
not associated with reconfiguring a lot, if -

* any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;

« the work is located wholly or partly within 10m of a substation site;

Rw) none of the above.

 

Land designated for community
infrastructure

Applications Involving development on land
designated for community infrastructure may
trigger this referral,

For more information refer to schedule 2 of the
IP Requiation,

If you answered *YES" to Q19, the application
requires assessment by the chief executive of
the department administering the Act authorising
the development for the designated purpose,
tf an agency other than the designator is the
assessment manager for the apptication, the
designating agency will be a concurrence
agency for the application in retation to this
matter.

 

Does the application involve development assessable against the planning scheme and on land
designated for community infrastructure?

(i) intended to be supplied by a public sector entity; and
(ii) on land not owned by or on behalf of the State; and
(iti) other than development —
(a} for the designated purpose; or
. (b) carried out by, or on behaif of, the designator.
Mino

DYES

 

Page 6

Page 13

INTEGRATED PLANNING ACT 1997
SEQ Regional Plan

For mota information refer to schedule 2 of the
IP Regus

Refer to Chapter 2, part 5A and schedule 10 of
_ the Integrated Planning Act 1997, and schedule

2 of the Regulatory Provisions for relevant

definitions. :

Unless you answered “noné of the above" to

Q20, the application requires assessment by the

Office of Urban Management (CUM). .
. mete . . .

ae

IDAS Assessment Checklist, Version 19.0, 2 March 2007
20. The application involves (tick appicable box/es) - :
DD (i) amaterial change of use of premises —
(a) ina Major Development Area in the Urban Footprint for -
© (i) anurban activity -
C1 inanarea included in a structure plan where the IPA, section 3.1.6
applies;
(1 inan area not included in a structure plan where -
the IPA, section 3.1.6 applies to the application for the material change
of use; or
« the premises exceeds 10,000m2; or
+ the gross floor area (GFA) on the premises will exceed 10,000m2; or
« impact assessment is required under the relevant planning scheme
CO (i) . intensive animal husbandry, or
DC fii) residential development involving a rural residential purpose

{b) in the Regional Landscape and Rural Production Area for -
(4 (i) anurban activity and not specified in section 2.4(2); or
Li) residential development involving a rural residential purpose and not
specified in section 2.6(2)
(c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);

(d) in the Investigation Area for —
(J (i) anurban activity and not specified in section 2.10(2);
C (i) residential development involving a rural residential purpose and not
specified in section 2.12(2); or
( (ii) intensive animal husbandry

1 (i) reconfiguring a tot-
On land in a Major Development Area in the Urban Footprint that is:
{a} not included in a structure plan; and
(b) not specified in section 3.1(2).

Mw {iii} none of the above ;

 

Fisheries matters

For more information refer to schedule 2of the IP.
Requiation. -

Unless you answered “none of lhe above” to
Q21, the application requires assessment dy the
Department of Primary Industries and Fisheries
(OPI&F). °

If an agency other than DPI8F is the assessment
manager for the application, DPI&F is a
concurrence agency for the application in
telation to items {i} ~ {iv} and an advice agency
in refation to item (¥).

21. The application involves: (tick the applicable box/es)

DO an assessable material change of use for aquaculture - complete Part O; of Form 1;

(1 (i) assessable operational work that is the construction or raising of a waterway barrier -
complete’ Part O3 of Form 1;

Oi (ii) assessable operational work completely or partly within a declared fish habitat area.
complete Part O2 of Form 1; . .

1 (iv) assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part O2 of Form 1;

LJ (v) development assessable under the IPA, schedule 8, part 1, on land that adjoins a

declared fish habitat area;

 

none of the above.

Bw

Page7

Page 14

INTEGRATED PLANNING ACT 1997
Integration of and use and public
transport

For more information refer to Guide 23, schedule
8A of ihe IPA, & schedule 2 of lhe IP Requtation.
Unless you answered “none of the above’, the
application triggers referral to QT as a
concurrence agency.

 

IDAS Assessment Checklist, Version 19.0, 2 March 2007
22. The application involves: (tick the applicable box/es)—

(1 (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
schedule.

D (ii) reconfi figuring a lot—

O11) ‘ oniand that is completely or partly within a public transport corridor, and the
total number of lots increases;

[4 (>) _ on land that is completely or partly within a future public transport corridor or
an airport's public safety area;

(1) (©) __ ontand that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;

[1 @) _ for a residential purpose within the 25 ANEF contour for an airport;

CJ (e) _ for aresidential purpose resulting in 100 or more allotments.

LD (ii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (fi)
above, on land that—

C1) __ is completely or partly within a public transport corridor or a future public
transport corridor;
[J (b) _ will result in work that encroaches into an airport's operational airspace.

Ed (iv) none of the above.

 

Railway safety and efficiency

For more information refer to Guide 23, schedule
8A of the IPA & schedule 2 of the IP Requiation,
Unless you answered “none of the above”, the
application triggers referral to OT as a
concurrence agency.

23. The application involves: (tick the applicable box/es)—

0 (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
schedule.

Hi (ii) reconfiguring a lot—

Ci {@) _ onland that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;

(1 (b) on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater;

[4© _ onland that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases;

(1) (@) on land that abuts rail corridor land, commercial corridor land or future Tailway

- land and an easement abutting the corridor or future railway land is created;

Ci (e)  ontand that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;

C1 (f) for a residential purpose resulting in 100 or more allotments.”

LC (iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m, on land that—

(J (@) _ is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;
(J (b) _ is completely or partly within future railway land, or a railway tunnel easement;
[L1©) abuts rail corridor land, commercial corridor {and or future failway land, and

the work is within 25m of the railway boundary.
4] (iv) none of the above.

 

Moonie to Brisbane pipeline

For more information refer to schedule 20 the IP
Regulation

Unless you answered “none of the above’, the
application triggers referral to the holder of
pipeline licence No 1 issued under the Petroleum
Act 1923, currently Santos ONT Ply Ltd, for
advice,

 

24. The application involves the easement for the construction or operation of the Moonie to |

Brisbane strategic pipeline, and involves: (tick the applicable box/es)—

O (i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement.

D (ii) reconfiguring a lot

(1) (iii) operational work assessable against the planning scheme, that is fi illing, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a jot, and the
work is located wholly or partly in the easement.

[Mf (iv) none of the above.

 

Page 8

Page 15

INTEGRATED PLANNING ACT 1997,
Koala habitat area
For more information, refer to Guide 26 and
schedule 2 of the IP Reaulation.

. Unfess you answered “none of the above’, the
apptication requires referral to the Environmental.
Protection Agency as a concurrence agency.

IDAS Assessment Checklist, Version 196, 2 March 2007
25. The application involves: (tick the applicable box/es)—

C1 (i) a material change of use of premises in a koala conservation area or koala
sustainability area made assessable under a planning scheme, that is not for a domestic
activity and will result in -
© (a) clearing of native vegetation over an area greater than 2500m?,

(1b) anew building and any reasonably associated structure with a total footprint
greater than 1000m2;

(0 (c) anextension to an existing building and any reasonably associated structure if

: the extension has a total footprint greater than-1000m?,

(1 @) extracting gravel, rock or sand from an area greater than 5000m?,

(1 €e). excavating or filling an area greater than 5000m?,

oO 0 additional traffic in a koata conservation area or koala sustainability area,
between 6p.m. on a day and 6a.m. on the following day. -

DW) reconfiguring a fot in a koala conservation area or koala sustainability area that wil
result in -

C1 (a) an increased number of lots;
[D (b) clearing of native vegetation over an area greater than 2500m?.

C1 (ili) operational work in a koala conservation area or koala sustainability area made
assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
reconfiguring a lot mentioned in (ii) above) that will result in the clearing of native vegetation
over an area greater than 2500m?.

C1 (iv) operational work in a koala conservation area or koala sustainability area made
assessable under a planning scheme (not associated with a material change of use
mentioned in (i) or reconfiguring a fot mentioned in (ii) above) that is not for 4 domestic activity
and will result in —

0 (a) clearing of native vegetation over an area greater than 2500m2;
{7 (b) extracting gravel, rock or sand from an area greater than 5000m?;
[1 (©) excavating or filling an area greater than 5000m?.

ow) ) none of the above.

 

Wild river area

For more information, refer to Guide 27

If you answered YES to Q26, you must also
complete section 2 of this checklist. This will
enable you to determine if your application can
proceed in a wild river area and which referral
agency will assess your appfication against the
Wild Rivers Code, or if the proposed
development Is “prohibited” in a wild river area.
Note: Development can be ‘prohibited’ in a wild
‘iver area because the application cannot be
accepted by the assessment manager.

26. Does the application involve development in a wild river area declared under the Wild Rivers Act
2005?

BaNo

Cl yes

 

Referral coordination

An information request requires referrat
coordination if the application involves ~
{i} Jor more concurrence agencies; or
{ii) a facility or area assessable under a
“planning scheme and prescribed in
schedule? or 8 of the [P Requlation; or
{ii}, development which is subject to an
application for preliminary approvat
Mentloned in s3.1.6 of the IPA.

For more information go to Guide 2 and Guide §.

27. Does the application trigger referral coordination?
NO
(1 YES, as the application: (tick the applicable box/es)
(i) _ triggers 3 or more concurrence agencies;

(1 (ii) ‘involves a material change of use made assessable under a planning
scheme and prescribed in schedule 7 of the IP Regulation;

Li (il) involves a material change of use (other than a dwelling house, outbuilding
or farm building) made assessable under.a planning scheme, or
reconfiguring a lot, in an area prescribed in schedule 8 of the IP Regulation;

O (iv) ‘is for a prefiminary approval mentioned in s3.1.6 of the IPA

 

Referral agency responses prior to
lodgement

Under s3.3.2 of IPA a referral agency may give a
referral agency response on a matter within its
jurisdiction about a proposal before an
application for the proposal is made to the
assessment manager.

This is commonly the case where an application.
requires referral to a building referral agenty (eg.
Oit'Fire and Rescue Service). = *

28. Did a referral agency give a referral agency response under $3.3.2 of the IPA before the
application was made to the assessment manager?

[Xt'NO

(YES - attach a copy of the referral agency/s response/s

 

 

Page 9

Page 16

 

i

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 19.0, 2 March 2007

SECTION 2— ASSESSMENT IN A WILD RIVER AREA

(completion mandatory if the proposed development is located in a wild river area) _

 

 

_ It the responsibility of the applicant to

~ be accessed by contacting the Department of

Wild River Area

determine if the development is proposed in
a wild river area.

Information about wild river areas including the
geographical location and position of
management areas in relation to properties, can

Natural Resources and Water (NRW), accessing
the department's website www.nrw.aid.qov.au or

contacting the department by email on: +f

wild. [email protected],au

Note on Referrals

Referrals for development in a wild iver area
{other than for agricultural activities and anima’
husbandry activities) are not changed from the
existing referral arrangements.

Notes on development assessable
against the Wild Rivers Code

For information regarding development in a wild
fiver area, see the relevant wild river declaration
and Guide 27. The relevant wild river
declaration will provide information regarding
which types of development must be assessed
against the Wild Rivers Code, and in some
cases which types of development are exempt *
from wild river requiremenis.

The notes on development assessable against
ihe Wild Rivers Code in this section of the
checklist provide some guidance however this
may vary between wild river areas. The relevant |
declaration will provide the information applying
to each wid fiver area.

Applications for some new developments will not
be accepted if the proposed development is in a
high preservation area (HPA). Most applications
for development aclivities which may be made
including these in a preservation area (PA), must
be assessed against and must comply with the
Wild Rivers Code where indicated in a relevant
wild river declaration.

1. Which wild river area is the development proposed in?

 

 

 

 

The proposed development is to be located in: (tick the appicable box/es)
(Ji) ahigh preservation area (HPA); ©
(Jil) a preservation area (PA) ; .
Oo iii) a wild river floodplain management area (FMA);
(J iv) a wild river nominated waterway;
_ B41 v) a designated urban area (DUA).

 

Environmentally relevant activities
(ERAs) in a designated urban area

Ifyou answered YES, your appticalion for an
ERA is exempt from any wild river requirements
and provided ihere are no other aspects of this
development thal require assessment against
wild rivers, you do not need to complete the
remaining questions in Section 2.

If you answered NO to Q2, please complete the
femaining questions in Section 2.

2. Does the proposed development only involve any of the following environmentally relevant

activities (ERAs) in a designated urban area (as mapped in the relevant wild river declaration)?
i) An ERA 28 or ERA 14; or :

ii) A level 2 ERA except ERA 1, 2, 3, 4, 20, 22 or 59.

DYNO ‘ [DYES (ensure you have completed Part G of Form 1)

 

- Clearing native vegetation

 IFYES and you ticked Q4 box i) the application

If YES, ihere are a limited number of purposes
for which an application to clear native
vegetation may be accepted in a HPA. See
Guide 27 for a list of relevant purposes for
which an application may be made in a HPA.

may be made and is assessabie against the Wild
Rivers Code. If YES and you ticked Q4 box ii)
the application will not be accepted,

Note: If clearing native vegetation is ina PA,
there are no wild fiver requirements and
provided there are no other aspects of this
development where wild river requirements
apply, do not complete the remaining questions
in Section 2.

 

3. Is the application operational work for clearing native vegetation in a HPA?

i] NO (YES (ensure you have completed Part J of Form 1)

4. If YES, is the clearing?

Oi clearing regrowth (as defined in the Vegetation Management Act 1999) in a registered
area of agriculture in a HPA (see Guide 27); or

- (2 ii) in a HPA outside a registered area of agriculture?

 

Page 10

 

 

Page 17

INTEGRATED PLANNING ACT 1997

Works in tidal areas, coastal
management districts and fish habitat
areas

Ifyou answered YES to 05, and ticked any
boxes in Q6), your application is required to be
assessed against and must comply with the Wiki

+ Rivers Code.
It you answered YES to 05 and ticked box j) in,
Q6, your application is required to be referred to
the EPA.
Note: If specifled works are proposed in a focal

. government area, it is prescribed tidal work ~ the
Televant local government will be the:
assessment manage: with the EPA as a
concurrence agency
If you answered YES to Q5, and ticked box ji} or
iti) In Q6, your application requires referrat to
DPIF.
If you answered NO to Q5 and ticked box j} in
Q6, the appfication will not be accepted.
It you answered NO to O5, ticked box ii} in O6
and the development is necessary to Instatt
authorised works or Infrastructure where a
development permil Is not required, or if &
required permit is held, the application must be
assessed against and must comply with the Wild
Rivers Code. Applications for purposes other”
than specified works or as described above will
fol be accepted.

It you answered NO at Q5 and ticked box iii) in
Q6, the application may be made if the works are
ina PA. These applications must be assessed
against and must comply with the Wild Rivers
Code. The application will not be accepted if the
development is proposed lo be located in a HPA.
For more information about specified works refer

to Guide 27

6.

___IDAS Assessment Checklist, Version 19.0, 2 March 2007
Is the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27-
Development in a wild river area)

XI NO Ces

The application is for one or more of the following:

oO i) Operational works that is tidal works or works in a coastal management district fensur you
have completed Part M and/or Part P of Form 1}; OF

O ii) Operational works for the removal, destruction or damage of marine plants (ensure you have
completed Part 02 of Form 1); OF

O iti) Building or operational works in a fish habitat area (ensure you have complejed Part O2 of Form 1).

 

Residential, commercial or industrial
development

if you answered YES to Q7, your application is
hot subject to wild river requirements. Provided
there ase no other aspects of this development
that require assessment against the relevant wild
‘iver declaration or Wild Rivers Code, you do not
need to complete (ha remaining questions in
Section 2.

if you answered NO to Q7 and ticked either box
i} or ii) in 08, the assessing agency is the
relevant local government. The application must
be assessed against and must comply with the
Wild Rivers Cade,

‘ls the application for residential, commercial or industrial development in a designated urban

area?

LJ No [Mt YES

If NO, does the application for residential, commercial or industrial development involve:

(Ji) a material change of use made assessable in a local government planning scheme
(ensure you have completed Part D of Form 4); or

(ii) operational works associated with reconfiguring a lot (ensure you have completed Part F
of Form 1).

 

Animat husbandry activities

If you answered YES to Q9 your application
fequires assessmenl against and must comply
with the Wild Rivers Code.

The assessing agency Is NRW.

Note: Applications for animal husbandry
activities will nat be accepted if proposed in a
HPA. For more details and 2 definition of animal
husbandry activities see ihe Wild Rivers Act
2005 and refer to Guide 27.

 

Does the application involve a material change of use for animal husbandry activities (as defined
under the Wild Rivers Act 2005) in a PA?

i NO -L] YES (ensure you have completed Part R of Form 1)

 

Agricultural activities

If you answered YES to Q10, your application
fequires assessment against and must comply
with the Wild Rivers Code.

The assessing agency is NRW.

Note: Applications for agricultural activities will
not be accepted if proposed in a HPA. For more
details and a definition of agricultural activities
see the Wild Rivers Act 2005 and refer 10 Guide
a.

‘The production of fodder in a PA, and pasture
improvement using low impact soil disturbance
techniques is not an agricultural activity as
defined under the Wid Rivers Act 2005. For
more information see Guide 27.

 

10.

1.

Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in

aPA?

Xf No

If YES is the application for:
[J i) a material change of use; or
(J ii) operational works.

1 YES (ensure you have completed Part Q of Form 1)

 

Page 11

Page 18

 

INTEGRATED PLANNING ACT 1997
Works that take overland flow water

The resevant wild river declaration will state
works thal take overland flow water are either
self assessable or assessable, or are exempt
from wild river requirements.
If you ticked Q13 i), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.
if you ticked Q13 ii} an application is not required
to be made however the works must comply with
_ the relevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.
If you ticked 0113 iii) your application is not
‘subject to wild river requirements.
Appiications for development that is other than
that stated to be assessable, self. assessable or
exempt will not be accepted.

12.

13.

IDAS Assessment Checklist, Version 19.0, 2 March 2007
Does the application involve works that take overland flow water in a HPA or an FMA?

NO [77 YES (ensure you have completed Pat Ke of Form 1)

If YES, is the application for works stated in the relevant wild river declaration to be?
(Jj assessable works
CJ ii) self-assessable works

(ii) exempt works

 

Works that interfere with overland
flow water

Tha relevant wild river deciaration will state
works that interfere with overland flow water that
are either self assessable, assessable or exempt
from wild river requirements.

if you ticked Qt6 i), your application musi be
assessed by NRW against the Wild Rivers Code
and must comply with the code.

If you ticked O15 ii} an application is not required
to be made hawaver the works must comply with
the relevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.

If you ticked 015 iii) your application is not
subject to wild river requirements.

Applications for development that is other than
that stated to be assessable, self-assessable or
exempt will not be accepted.

Does the application involve works that interfere with overland flow water in a FMA?
MI NO [DYES (ensure you have completed the relevant Part K of Form 1}

if YES, is the application for works stated in the relevant wild rivers declaration to be?
(Ji) assessable works

LL ii) self-assessable works

(iii) exempt works”

 

Waterway barrier works

Applications for building or raising waterway
barrier works in a HPA will not be accepted.
If you answered YES to Q16, your application
musi be assessed by DPIF against the Wilt
Rivers Code and must comply with the code.

16.

Does the application involve building or raising waterway barrier works in a PA?
BNO [YES (ensure you have completed Part Oz of Form 1)

 

Aquaculture (non ERA)

Applications for aquaculture in a HPA wili not be
accepted.

If you answered YES to Q17, your application

musi be assessed by DPIF against the Wiki
Rivers Code and must comply with the code.

Does the application involve aquaculture in a PA?
[ho (YES fensure you have completed Part O; of Form 1}

 

Works that interfere with water in a
watercourse

Note: If the development is proposed in a HPA,
applications for all works that interfere with water
in a watercourse {including dams of weirs,
stream realignment or stream diversion) will not
be accepted.

tn a PA, applications for instream dams and
weirs may be accepted in nominated waterways.
{f you ticked box ii) in Q19, your application will
not be accepted.

Note: Operational works outside a HPA or
nominated waterway are not subject to wild
river requirements.

More information and locations of nominated
waterways is available by contacl NRW,
accessing the department's website

www.nrw.gtd.gov.au or cantacting the
department by email on:

 

wild [email protected] the application involve operational works that interfere with water in a watercourse that is in
a nominated waterway in a PA?

DgNo
If YES, .
(J i) The application is for an instream dam or weir; or

O YES (ensure you have completed the relevant Part K of Form 1)

(J ii) The application is for operational works that interfere with water in a watercourse, and is
"for development other than a dam or weir.

 

Page 12

Page 19

INTEGRATED PLANNING ACT 1997
Environmentally retevant activities

Most applications for an ERA in a HPA will not
. be accepted. Applications which may be made
- tequire referral.to the EPA. The assessment of
some ERAS is assessed by NRW, others have
been devolved to DPIF, NRW or delegated.
local govemment (see EPA website for more
~ {nformation on devolved ERAs} -
IFyou answered NO to Q20 you do not need to
complete Qs 21-24.
Ifyou answered YES t6 020 and the
development is In a PA, your application must be
assessed by the administering authority?! * /-
against the Wild Rivers Codé and must comply
with the code, unless the proposat is for
development where an application will not be
accepted, oris exempt from wild river
Tequirements (see Q2). You will be abla to
determine if an application will not be accepted
for the development by answering O21 - Q24.

I you answered NO to Q21, you do not need to-
complete Q22. If yau answered YES to Q21 you
are required to complete Q22. .

If you answered NO to 022, the appliéation will ©
not be accepted. tf you answered YES to 022,
the application must be assessed by NRW
against he Wild Rivers Code and must comply
with the code.

If you answered NO to 023 and ihe development
Is proposed in tha HPA the appiication will not be
accepted. If you answered YES to Q23, the
application must be assessed by the EPA oF
NRW (as prescribed in schedule 8A of the IPA)
against ihe Wild Rivers Code and must comply
with the code.

Ifyou answered YES to 024 the application: will
not be accepted. If you answered NO to Q24,
your apptication must be assessed by NRW
against ihe Wid Rivers Code and must comply
with the code,

Exempt ERAs in a designated urban
area

If the development is proposed in a designated
urban area there may be no wild river
fequirements. See Section 2 Q2.

Note: All applications that can be accepted must
be assessed against and must comply with lhe
Wild Rivers Code (other than exempt ERAs‘in a
designated urban area).

:

Documentation

if you answered NO to Q25, your application
may be subject to an information request and
processing of the application may be delayed.

 

20.

22.

23.

24.

25.

Does the application involve an ERA?
NO

. Is the application for an ERA 20 instream?

be NO LJ Yes

IDAS Assessment Checklist, Version 19.0, 2 March 2007

(J YES (ensure you have completed Part G of Form!)

Is a quarry allocation notice held for the proposed ERA 20 instream?

(XTNo ’ Cyes

Does the application involve any of the following in a HPA?
i) a level 2 ERA 11, {and is for specified works or a residential complex)

ii) an ERA 19 (dredging)

iii) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in
the Wild Rivers Act 2005, and Environmental Protection Act 1994)

iv) an ERA 22 (out of stream)
Bat No (yes

Is the proposed development for ERA 20 {out of stream) and;

~ inaFMA; and

~ — not low impact; and

— not for a residential complex in the area, or for specified works.

EX'no Clyes

Has documentation been included with the application describing how the applicant proposes to
comply with the mandatory requirements, required outcomes, and/ or performance requirements
as set out in the relevant part/s of the Wild Rivers Code?

Jno Cl yes

 

21 The administering authority may be either the EPA, or if devolved or delegated, the local government, DPIF ar NRW.

Page 13

Page 20

 

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 19.0, 2 March 2007

 

SECTION 3 - BUILDING REFERRALS (completion not mandatory) _

Below is a list of the'referrals that can apply to an application for building work assessable against the Building Regulation 2006. This section of the IDAS
Assessment Checklist is provided for advice only. This section of the IDAS Assessment Checklist is not required to be completed and lodged with an
application for building work assessable against the Building Regulation 2006 only. .

ae

 

Special fire services - generally 1.
For more information go to schedule 2 table 1 and
schedule 2A of the IP Requiation:

Assessment period 15 days. No response Is a
deemed refusal,

An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
fequires special fire services mentioned in schedule 2A part 1 of the integrated Planning Regulation 1998
(IP Regulation) or includes an alternative solution assessed against the performance requirements of the
Building Code of Australia.

 

Fire safety for budget accommodation | 2.
For more information go to schedule 2 of the IP
Regulation ~

: the subject of the application requires the installation of a fire safety system for a budget accommodation

An application may trigger referral to Qid Fire and Rescue Services as an advice agency if the building work

building.

 

Spray painting . 43.
For more information go to schedule 2 of the IP
Regutation

An application may trigger referral to the Department of Industria! Relations (DIR) as a concurrence agency
if the application involves a workplace incorporating spray painting.

 

Retail meat premises 4.
For mare information go to schedule 2 of the IP
Regulation

An application may trigger referral to Safe Food Qld as a concurrence agency if the application involves a
retail meat premises. :

 

Private health facilities .|5.
For more information go to schedule 2 of the [P
Requtation

An application may trigger referral to the Department of Health as a concurrence agency if the application
involves a private health facility.

 

Workplace area less than2.3m? ss |6.
For more Information go to schedule 2 of the {P
Regulation -

An application may trigger referral to the Department of Industrial Relations (DIR) as an advice agency if the
application involves a work place area less that 2.3m.

 

Land contiguous to a State-controlled | 7.
road. . :
For more information go ta schedule 2 of the iP

Regulation

An application may trigger referral to the Department of Main Roads as a concurrence agency or advice
agency if the application involves land contiguous to a State-controtled road. .

 

| Pastoral workers accommodation 8.
For more information go to schedule 2 of the IP
Regulation

An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency "
if the application involves pastoral workers accommodation.

 

Child care centre 9.
For mare intormation go to schedute 2 of the IP
Regulation

An application may trigger referral to the Department of Communities as a concurrence agency if the
application involves a childcare centre.

 

Coastal development 10.

For more information go to schedule 2 of the IP
Regulation

An application may trigger referral to the Environmental Protection Agency (EPA) as a concurrence agency
if the application invoives land completely or partly seaward of a coastal building line22. ,

 

Heritage 11,

For more Information go to schedule 2 of the IP
Requlation

An application may trigger referral to the Heritage Council as a concurrence agency if the application
involves a heritage registered place. .

 

Fisheries matters 12.

For more information go to schedule 2 of the [P
Regulation

. habitat area.

An application may trigger referral to the Department of Primary Industries and Fisheries (DPI&F) as a
concurrence agency if the application involves assessable building work in a declared fish habitat area; or
as an advice agency if the application involves assessable building work on land that adjoins a declared fish

 

Integration of land use and public 13.

transport
For more Information go to schedule 2 of the IP
Regulation

An application may trigger referral to Queensland Transport as a concurrence agency if the application’
involves existing or future public transport corridors, or airport operational airspace??.

 

 

 

Railway safety and efficiency 14,

For more information go to schedule 2 of the IP

Requtation

 

An application may trigger referral to Queensland Transport as a concurrence agency if the application
involves future railway land.

 

 

NOTE: CONCURRENCE AGENCY ASSESSMENT PERIODS

The local government, as the concurrence agency, is required to assess and provide a response for the following building applications within a prescribed
time. For applications relating to design and siting (17, 18 & 19), and building work for removal or rebuilding (23), the assessment period is § days. For all
other applications the assessment period is 15 days. If no response is received from the local government for an application, it is taken to be a deemed
sefusal, However for amenity and aesthetics impact of particular building work for a single detached class 1a or class 10 building or structure (15), no

response is taken to be a deemed approval.

 

Amenity and aesthetic impact of 15.

particular building work for single
detached class 1 building or class 10
building or structure

For more information go (0 schedute 2 table 1 of the
IP Requtation.”

Assessment period 15 days. No response is a
deemed approval.

 

An application will trigger a referral to the local government if it is :
¢ for a single detached class 1 building or class 10 structure; and
¢ the local government has declared by resolution the following:
— the appearance of the building or structure will have an extremely adverse impact on the amenity of
the locality; and
— the appearance of the building or structure would be in extreme conflict with the character of the
locatity.

 

 

 

2) Coastal building tines are prescribed under the Coastal Protection and Management Act 1995.
Operational airspace is as defined in State Planning Rolicy 1402 “Development in the Vicinity af Certain Airports and Aviation Facts",

Page 14

Page 21

4

IDAS Assessment Checklist, Version 19.0, 2 March 2007

 

 

 

 

 

 

 

 

INTEGRATED PLANNING ACT 1997

Whether particular buildings may be |16. An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger 2

occupied for residential purposes referral to the local government as the concurrence agency.

For more inforrnation go to schedule 2 table. 1 of the

IP Regulation, .

Assessment period 15 days. No response is a

deemed refusal,

Design and siting 47. An application may trigger referral to the local government as the concurrence agency if the building work

For moe rtomaton goto schedute.2 tabs 1. ofthe does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code.
lula 18. An application may trigger referral to the local government as the concurrence agency if the building work

accursed 5 days, No responses 2 does not comply with the qualitative statement for building clearance and site cover:

deemed refusal: 19. An application may trigger réferral to the local government as the concurrence agency if the building work

does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland

Lon .Development Code, part 41 or 12.

Fire safety in particular budget ~ 20: An application may trigger referral to the local government as the concurrence agency to determine the

accommodation buildings building will comply with the fire safety standard under the Building Act 1975 when the building work has

For mora informaidn go to schedule 2 table 4 of the: been completed.

1P Requiaton.

Assessment perlod 15 days. Nosesponse fs a

deemed refusal.

Higher risk personal appearance 21. An application may trigger referral ‘to the local government as the concurrence agency to determine if the

services building work

For more information go to schedule 2 table T of the © complies with the performance criteria of the Queenstand Development code part 15; and

{P.Reauiation and the QDC part 15. * the work does not comply with an acceptable solution stated in the part.

Assessment period 5 days. No- response is: a

deemed refusal.

Building work for residential service [22. An application for building work for premises in which residential care service under the Residential

For more Information go to schedite 2 table 1 of the Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger

IP Reautation and the QDC part 20. referral to the local goverment as the concurrence agency.

Assessment-period 15 days. No response is a

deemed refusal. °

Building work for removal or 23. An application for the removal and/or rebuilding at another site of a building or other structure, wil trigger

rebuilding - referral to the local government as the concurrence agency.

For more information go to schedute 2 table 1 of he

iP Regulation.

Assessment period 6 days. No response is a

deemed refusal.

Building work for rainwater tank in 24. An application may trigger referral to the local government as the concurrence agency to determine if the

designated rainwater tank area

For more information go to schedule 2 table 1 of the
{P-Requlation and the QDC part 25.

Assessment period 15 days. No response is a
deemed refusal.

 

building work or structure complies with the relevant performance criteria if -

« Under the Building Regulation 2006, a rainwater tank is proposed to be.installed as part of relevant
building work, in a designated rainwater tank area; and

« Under the Queensiand Development Code, part 25, the. rainwater tank does not include an acceptable
solution for a relevant performance criteria.

 

Page 15

 

Page 22

March 26" 2007
Alice Cumming

PO Box 2034
NOOSA HEADS

Building Dept
NOOSA SHIRE COUNCIL

RE: Building application no. 20070183.
25 Arkana Dr. Noosa Heads
I require a relaxation of ruling for the 600mm eave to side of the garage.

Due to the narrowness of the existing driveway and to obtain garage width for 2 vehicles
the garage has to be extended toward that boundary.

Because of the slope of the land this wall/eave area will not be visible from the road.
The garage is an uninhabited area.

Enclosed is a letter from our neighbours on that boundary who have no objection to lack
of eave on this wall.

Taking the above into consideration 1 hope you will consider this request favourably.
Regarding the 5 degree roof pitch — as there is a structural beam running through the

garage roof, so the full 5 degree pitch may not be attainable, but we will go as close as
possible.

Yours sincerely, -~. LO

 

Alice Cumming

Page 23

March 26" 2007

Building Dept
NOOSA SHIRE COUNCIL

We, M. and D. Smith, (owners) of 27 Arkunsa Dr Noosa Heuds 4567 heve mo objection to
the extension at’25 Arka Dt Noosa Heads baving nil eave ovecang tm the garage

Yours sincerely

ili
<1

M. Smith

O. Smith

Page 24

 

DEVELOPMENT FEES AND CONTRIBUTIONS

 

 

 

 

 

 

 

 

 

Wea Yoon 2O24, NoceaA Heads 4564

BONDS AMOUNT ACCOUNT NO.
Building Reinstatement Bond- 50 Cat 8

BOND REFUND DETAILS

Payee Name:

Address:

BUILDING SERVICES > AMOUNT - ACCOUNT NO.
Swimming Pool First Reg - (New) 32/12027.423.701
Doc Lodgement Fee - StatGroup __ 32/12023.423.760 .
Doc Sales, Retrieval of Plans 31/12023.215.879
Boundary Setback Relaxation Fee $205. 0O 32/12023.423.717
CMS Endorsement Fee 32/12023.423.717
Other Building 32/12023.423.723
Soil Testing 31/12023.423.723
Building Search 34/12023.423.779
Building Search - Poot Compliance 34/12028.293.636
PAYEE NAME:

Alice, Cumming

ADDRESS: ~

 

FILE NO:
2D Aerkanda ow. Noosa HeAcis,

 

DATE:
st

TOTAL:

298. QO

 

RECEIPT NO: 2k O49

 

 

 

 

Page 25

 

GENERAL SPECIFICATION \,

ALL BUILDING WORKS TO BE CARRIED OUT TO THE BUILDING CODE OF AUSTRALIA & THE BUILDING ACT 1975.
WRITTEN DIMENSIONS TO TAKE PRECEDENCE OVER SCALE.

BUILDER TO VERIFY ALL SETOUT DIMENSIONS PRIOR TO PLACEMENT OF CONCRETE.

LINTELS MAY BE SUBSTITUTED BY SUPPLIER FOR THOSE OF EQUAL STRENGTH & SPAN RATIO.

ALL TIMBER FRAMING TO COMPLY WITH NATIONAL TIMBER FRAMING CODES & THE QUEENSLAND HOME

BUILDING CODE (AS 1684-1992)

BUILDER TO SUPPLY FOOTPATH PROTECTION & REQUIRED SIGNS TO COMPLY TO WORKPLACE HEALTH & SAFETY ACT.
REINFORCED CONCRETE FOOTINGS & SLABS TO SOILS TEST ENGINEERS REPORT

APPROVED TYPE STEEL ROOF FRAMING © 900 CRS FIXED TO AS1684 SPECIFICATIONS & W5ON N3 WIND FORCES
COLORBOND ROOF SHEETING FIXED TO MANUFACTURERS SPECIFICATIONS & WSON N3 WIND FORCES

POWDER COATED ALUMINIUM SLIDING WINDOWS (SEE WINDOW SCHEDULE)

TERMITE PROTECTION TO COMPLY TO AS3660.1

R 2.5 APPROVED TYPE BLANKET INSULATION TO ROOF AND OR CEILINGS

R 1 APPROVED TYPE INSULATION TO EXTERNAL WALLS PLUS 0.4 NOMINAL CLADDING

SEPARATE WC TO HAVE REMOVAL DOORS
SMOKE DETECTORS (hard wired) AS SHOWN ON FLOOR PLAN TO COMPLY TO AS 3786

ALL STORM WATER DRAINS TO COMPLY TO LOCAL AUTHORITY & DISCHARGED TO APPROVED DRAINAGE POINTS
ALL PLUMBING & DRAINAGE TO COMPLY TO LOCAL AUTHORITY CONNECT TO COUNCIL SEWER

WET AREAS TO COMPLY TO AS. 3740 FOR WATERPROOFING AS IN BCA. 2005 PART 3.8.1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Note: - STAIRS TO COMPLY TO BCA 2005 PART 3.9.1 BALUSTRADES COMPLY TO BCA_2005 PART 3.9.2 LIVIA]
WIND CLASSIFICATION. (W41 N3) — NWA = =

PROPOSED WORKING DRAWINGS FOR 2nd STOREY ADDITIONS AVA = =

LOWER FLOOR ALTERATIONS TO EXISTING BRICK DWELLING CANONS, =

FOR:— TONY JACKSON of AdJ DEVELOPMENTS MAN.

SITE AREA 607 Sq/M SNM

LOT No 78 RP 94023 NAW

ADDRESS 25 ARKANA DRIVE é —

SUBURB NOOSA HEADS —

PARISH WEYBA SME ZZ

COUNTY MARCH GLA cuz

SHIRE NOOSA mz

UPPER FLOOR ADDITION 105.0 sq/m eee

UPPER FLOOR TILED DECK 55.0 sq/m

GARAGE, ENSUIT & ENTRY ADDITION 2B sen DISPLAY ONLY LIC No 077586

TOTAL ADDITIONAL AREA 186.1_sq/m CAD Me
THESE DRAWINGS ARE SUBJECT TO COPYRIGHT ADRIAN BAKER COMPUTER DRAFTING
NO PART MAY BE COPIED OR REPRODUCED Office 1 , 36 Duke Street , Sunshine Beach , Queensland
OTHER THAN FOR THE PURPOSE OF THIS Ph: 07 5447 3372 Fox 07 54473416
CONSTRUCTION WITHOUT WRITTEN CONSENT FROM EMAIL: — [email protected]
COMPUTER DRAFTING & THE PARTY CONCERNED. LOT No 78 SHIRE OF NOOSA

DATE: Di
02/03/2007 SCALE AS SHOWN

 

CHK. BY JDWG. BY

 

 

 

ABoker 1sHoRN [SHEET No 1 of 9

 

PROPOSED TIMBER FRAMED UPPER FLOOR ADDITION & ALTERATIONS TO EXISTING BRICK DWELLING free No 0606s

 

 

 

FOR:— FRAC CumngW & Lot No: 78 25 ARKANA DRIVE NOOSA HEADS| DESIGN STRENGTH W41 N3

 

 

 

Page 26

 

 

= 5070

Existing Dwelling 13050

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

aT 70 - 70 g
Existing 3720 — 3660 —— 5050 ————_ 21/0 —4
| 0969 ——22— 2000 —42°- 2080 —t
2960 — A— 2000 080 ‘
| | ql
Section A Section B
_(6P-1) - (BP-1)--— —— (8P-1) —f—__ (891)
7 El U o |
2 Existing concrete Patio | on site
oS Line of upper deck | |
2118 ASO existing tw 1530 ASW 2121 ASD Saings
2 =| al i ia |-——> —at—__— ‘=
ste | s——
° 3 Proposed Sitting |
S a Existing Bed Proposed Bed 1
Ss 2
BI 3/studs under load|poiltses /cet 86 2 8 a
. Ee So Tar : : W3_1215_ASW
4 r | |ACoeoeSn =
— 3% : t— WR OHH at ont
2 = elie =| | OOO i alt _ Ws
B S oh a 83 ot DL ————————_ <
= LR a —_—_—— ae fale tial &
= ; st spite Aw ® q Ss &
a 1 c - a
2 8 TA els} =
z : es 90x4.5mm gal SH —
A Lristing ext wall— 2/M12 anchor bolt to a
| 6mm fillet weld to UB
i ay Support footing to Engineers detail S
Oo + = 3S i
s a 3 “
3 4 B Rebuilt Garage 5 Ee Se
Ss ania = 2 Existing Office i — ebul 2 = 2
2 At D1 2112 Pivot door |b 72 Slab raised 800¢nm & I 2 18 =
g * L/ 2 En
= GS fs —~ i KLLdLL 2 =
‘ae i + = pore oe & ES ESE J e S
1218 ASW S ¥ ja As 3
c = ‘2
a ® is | | oe
n Be ee ee ol ol | er: MN =A SI J
r 02 4800 Panel-Lift ‘ 8 LIC No 077586
90x90x4.5 gal SHS
——— —— g
Cahora SBahoruls 2/M12 anchor bolt to slab
6mm fillet weld to UB
| Residential Design Division
290) Office 1 , 36 Duke Street , Sunshine Beach , Queensland
6930 Ph: 07 5447 3372 Fax 07 54473416
4200 t 2870 a 8000 = EMAIL: — abok5409@bignond net.au
600 LOT No 78 SHIRE OF NOOSA
LOWER FLOOR PLAN SCALE 1:100 DATE. Drawn
02/03/2007 SEALE 12100
CHK. BY |OWG. B ~ e
z ; . : A.Baker |S HORE SHEET No 2 of 9
PROPOSED TIMBER FRAMED UPPER FLOOR ADDITION & ALTERATIONS TO EXISTING BRICK DWELLING [eee no 0606S

 

 

TONY JACKSON OF AJJ DEVELOPMENTS

Lot

No:

78

25 ARKANA DRIVE NOOSA HEADS

 

DESIGN STRENGTH W41

NS

 

 

Page 27

 

 

 

 

 

 

 

 

  
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

90 70 "3050 90
t 3870 { 8930 +
4 1000 F 900 t 4080 ————
Section A Section B
eo
Aperoved type glass Balustrade ———<._
cee Line of Tower well
3 Tile Deck, Wet Seat & Fall to External Edges
wm
[| be.2130 480 — ~ wgisioasw a eso
3 t Fr I r i re L = © t I r rT r | 1 8
ODEEL a L 5|
U 9 = 2
B | = Proposed Meals S sce
=! a A dt 2 -_ =
K | SE eats nee i Hel
1g so [:
2 |e cf72c2 |
3 =I Proposed Fam/Li
2 ; roposed Fam/liv Flot  — 4G Breaktast Bar \ ay |
| | [os/cet - - 4 |—* 2
eee eee (— Lm oa
tT BYP ARES { ! 1 o
Railing to owner selection | 2
gS Minimum Metre high & m
a
2 in i &| | 8
— = a Raised roof | >
S ‘adioyettiL Light well fe
B > she Hy Open below 8
= | zl Ytire Powder j2 Bes a
Sy | » * TEE Taock lool 1 ue
ED : SE | CE
L WS 3006 LVR WO 3/4300x600 Fed | W7 1306 LR W7 4305 LVR |
a —
Section A Section B
5 i Light wel 4 |
a 4000 x 5820 A
90 1650 vit) 1210 70 10 90
} 13050 t

UPPER FLOOR PLAN SCALE 1:100

 

 

NOTE: Builder to determine all dimensions on site
to coincide with existing building

 

 

 

WINDOW SCHEDULE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

No. | SIZE TYPE DESCRIPTION UNTEL JAMB STUDS
wi [0918 [ASW [XO Garage 1120x35 KD Fi? (| 2/90x35 MGP1O
w2 0609 | ADW WC 90x35 MGP10 90x35 MGP10
wo 11215 [ASW {XO ENS 120x35 KD F171 2/9035 MGP1O
Ww4 [i830 [ASW | XOOX SITTING | 2/240x35 KO F17|3/90x35 MCGPI0
w5 [3006 | ALW Pwo 90x35 MGPiO 2/80x45 MGP10
we |3/4306|AFW  |TINTED UCHT weLt{STEEL MANUFACTURES DETAIL

w7 11306 [ALW KITCHEN [90x35 MGP1O 2/90%35 MCPIO
we [i224 {ASW {XQ MEALS 140x35 KD FI? [2/90x35 MGPIO
w9 {1530 [ASW [OXXOSTARS — [27240x35 KD Fi7]3/90x35 MCPIO
wiol1530. [ASW [| XOOXFAM/UV —/170x35 KD FI7 | 3/90x35 MCP10
wiil0g09 [ASW wC 120x35 KD FI? | 3/90x35 MGPIO
wi 2/4 /0409 | AAW LICHT WELL] STEEL MANUFACTURES DETAIL

1 {1200__| PIVOT ENTRY, 120x355 KD ETT [2/80x355 WCPO
02 {4800 |P-LIFT GARAGE | 245x65 HYNE LGL | 3/90x35 MGP10
D3 {2136 [ASD MEALS 2/240x35 KO F17 | 3/90x35 MGP1O
04 [2130 [ASD FAM/UV[240x35 KD FI7 _[3/90x35 MGPIO

 

 

 

 

 

 

 

ADW: Aluminium Double hung window
ASW: Aluminium sliding window
OX outside looking in left fixed right opening
ALW: Alum. Louvers
ASD: Aluminium slider door

AFW: Aluminium fixed glass
AAW Alum. Awning Windows

 

VENTILATION SCHEDULE

 

 

 

Room [Sq/M|Required Vent Sq/M [Window Size |Vent Supplied Sq/M
Bed 1/39 | 3.9 2/2121 ASO] 4.41 5.58
1215 ASW | 0.9

 

 

 

0906 ADW | 0.27

 

 

Ventilation as/per BCA. 2005 Part 3.12.4
Zone 2 requires 10% of floor area ventilation per Habitable rooms

 

 

 

 

CAD.

LIC No 077586

 

Residentiol Oesiqn

Ph: 07 5447 3372

ADRIAN BAKER COMPUTER DRAFTING
Division
Office 1, 36 Duke Street , Sunshine Beach , Queensland
Fox 07 54473416

 

EMAIL: — [email protected]

 

 

 

 

PROPOSED TIMBER FRAMED UPPER FLOOR ADDITION

& ALTERATIONS TO EXISTING BRICK DWELLING

 

 

 

LOT No 78 SHIRE OF NOOSA
DAE: Draw ISCALE 1:100
CA BY ONG. BY ISHEET No 3 of 9
REF. No 0606S

 

FOR:~ TONY JACKSON OF AJJ DEVELOPMENTS

Lot No: 78

25 ARKANA DRIVE NOOSA HEADS

 

DESIGN STRENGTH W41 N3

 

 

 

 

Page 28

 

    

8 Mirs cbove Natural ground ce
oe

Proposed

_- Rendered Blue board

—

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(Cassngroor

 

second storey

 

 

 

 

 

 

 

 

 

Existing Block retaining

 

 

Lj CLO CLI

Existing deck

 

Y

| Ground floor ievel

 

 

 

 

 

 

> ao
\ Existing oo
: — ~ Lower floor level

po ae

 

—

be "N Replace existing SHS post & patio refer to Engineer

_- — ~~ 290x290 block piers core filled {refer to Engineers details

 

 

 

Existing brick to be rendered =

- Proposed
t | Garage

 

 

 

 

 

 

 

 

 

SOUTH ELEVATION SCALE 1:100

Light well

 

 

 

 

 

 

 

 

 

 

 

 

 

 

“

 

 

 

Ground floor level

 

 

 

 

 

I)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Proposed second storey
Rendered Blue board

 

 

 

|

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

oof for ENS
fa -

Ease

Proposed garage
Rendered Blue board

| Garage floor level

 

 

 

 

Cieon fill for built up driveway

 

 

 

 

 

EAST ELEVATION SCALE 1:100

ee

 

LIC No 077586

 

CAD

 

ADRIAN BAKER COMPUTER DRAFTING

Residential Design Division
Office 1, 36 Duke Street , Sunshine Beach , Queensland
Ph: 07 5447 3372 Fax 07 54473416

 

EMAIL: — abakS409@biqnond net.au

 

 

LOT No 78 SHIRE OF NOOSA
DATE: Di
02/03/3007 SCALE 1:100

 

 

PROPOSED TIMBER FRAMED UPPER FLOOR ADDITION & ALTERATIONS TO EXISTING BRICK DWELLING

CHK. BY {DWG.
eo en [ome BY SHEET No 4 of 9

 

 

 

 

 

FOR:— TONY JACKSON OF AJJ DEVELOPMENTS

Lot No: 78

25 ARKANA DRIVE NOOSA HEADS

REF. No O606S

 

 

DESIGN STRENGTH W41 N3

 

 

 

Page 29

 

 

 

Proposed second storey
Rendered Blue board

   

Upper floor level

 

 

 

Approved type Glass Balustrade

 

 

 

 

 

 

 

 

 

 

 

 

 

   
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   
 

 

 

Se —
aS
} g
Oo Tangy 1000]
<
. Proposed gar /ens ‘
~ Rendered Blue board Existing brick to be rendered Existing di
oe a eto — — — — —
&
EFL EOL -
Stairs to comply to BCA Port 3.9.1 1} | Lower floc
Balustrades to comply to BCA Part 5.9.2 Lr NGL

 

 

 

 

290x290 block piers core filled (refer to Engineers «

Light wel NORTH ELEVATION SCALE 1:100

 
             

Gorage roof & parapet

Approved type Glass 8alustrade
Upper floor level

Ground floor level Existing Floor

Exist /GL.

         

f.
r

isting Floor’:

     

i

Fast JOL Lower floor level
xis —_

Exis 7
290x290 block piers core filled {refer to Engineers details

WEST ELEVATION SCALE 1:100

 

(Al) ee

LIC No 077586

 

 

Residential

Ph: 07 5447 3372

ADRIAN BAKER COMPUTER DRAFTING

Design Division

Office 1, 36 Duke Street , Sunshine Beach , Queensland

Fax 07 54473416

 

EMAIL: — abak5409@bigoond netau

 

 

 

CHK. BY [OWG. BY

 

PROPOSED TIMBER FRAMED UPPER FLOOR ADDITION & ALTERATIONS TO EXISTING BRICK DWELLING

 

 

LOT No 78 SHIRE OF NOOSA
02/03/3007 SCALE 1:100

A.Baoker |[S.HORN SHEET No 5 of 9

 

REF. No O606S

 

FOR:— TONY JACKSON OF AJJ DEVELOPMENTS Lot No: 78 25 ARKANA DRIVE NOOSA HEADS

 

 

DESIGN STRENGTH W41 N3

 

 

Page 30

 

 

 

Bottom Plates 35x90 MGP1O | 29 |
Bi Beorer 295x85 Hynebeam 17C con/span | fa |
wo a :
i “oO, t= Railing to owner] |selection I
16mm Comp FC sheet wet sealed & tiled v4 =
Deck Joists 245x45 Hyne LCL | a K —r lr -
External grade @ 450 crs - | Te { 3
Approved type hangers & framing anchors voy aH co t— 2/300x45 Hyne LGL joists
3/30x2.8 nails per leg \ f w a Over entry way
{Awning roof ~H : = Ti a LJ fl H Uy L \ U |i
90x90 Gal SHS post
Replace Bhlustrade with <= Approved type balustrade Proposed aaraae _
Approved lass balustrade T] LL To go on stairs P gorag Existing block retaining wail
[ < i
NS o
f ran ‘ , a { 7
, s —
» Existing Patio“ x lf aot
“ + t LI oe
Existing slab WI? Proposed stab “Sh \ ae
Stairs to comply to BCA Part 3.9.1 [Ay a “ Posi Joists PJ30-70 MGPI2 @ 450 crs
Balustrades to comply to BCA Port 3.9.2 CY “ wd ae ”
go ae : : . .
3 _—_ aw Existing Brick veneer wall — Footings slab & connection to existing slab to Engineers details.
“ _ = _- Existing stoir wel To be removed Termite protection to AS3660.1, 200um polyfilm to underside of
y 2 slab. 50mm clean sand fill under slab
oo 4
Lo “ LIC No 077586
Natural Ground “~ Replace existing SHS post & patio refer to Engineer ADRIAN BAKER COMPUTER DRAFTING

—

—

PFC Steel roof structure to be designed
By Engineers and Manufactures
To W50 N3 wind categor

30mm gol looped strap a top plate
4/Approved type tek screws or nails per leg

Top Plotes 2/45x90 MGP1O

Studs 35x90 MGPIO @ 450 8

Mi2 Tie-down rods @ 1200 crs OK

   

3° pitch

8 Mtrs above Nature! ground ——__—- ~~

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

        

Kitchen designed by others a

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4 | NOTE: Builder to determine oll dimensions on
Site to coincide with existing building

Builder to ensure the 8M mox height
Above natural ground is not exceeded

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Studs 45x90 MGPIO @ 450 crs
————When studs greater than 3200mm in height

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TYPICAL SECTION A/A SCALE 1:50 (REFER TO ATTACHED STRUCTURAL ENGINEER CHANGES)

 

 

 

 

 

 

 

 

 

 

 

 

 

Residential

Ph: 07 5447 3372

Office 1, 36 Duke Street , Sunshine Beach , Queensland

Design Division

Fox 07 54473416

 

EMAIL: — [email protected] au

 

 

 

 

PROPOSED TIMBER FRAMED UPPER FLOOR ADD

ITION & ALTERATIONS TO EXISTING BRICK DWELLING

 

 

 

 

FOR:— TONY JACKSON OF AJJ DEVELOPMENTS

Lot No: 78

25 ARKANA DRIVE NOOSA HEADS

LOT No 78 SHIRE OF NOOSA
DATE: Ds

02/03/2007 SCALE 1:50

CHK.

CHK. BY TONG. BY) SHEET No 6 of 9
REF. No 0606S

 

 

DESIGN STRENGTH W41 N3

 

 

 

Page 31

 

  

          

 

oe Colourbond roofing fixed to (W50 N3)
aT Approved type battens fixed to (W50 N3)
La Rg (05S a Batten
8 Mtrs above Notural ground ——_»_—- [Type 17 Nol4 50mm screws
Top Plates 2/45x90 MCP10 _— 5° pitch ee roof frame to be designed
Studs 35x90 MGP10 @ 450 crs By Engineers and Monufactures

To W50 N3 wind categor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

              

 

      

 

   

    

 

 

 

 

 

 

 

 

    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

12mm tie-down rods 1200 ers max 30mm gal looped strap to top plote
host oneal ype barge MGR2 @ 450 ers | 4/Approved type tek screws or nails per leg
4/30x2.8 nails per leq |
Bottom Plates 35x90 MGPI0
16mm Comp FC sheet wet sealed & tiled B l Approved type flashing fixed to wall
Deck Joists 245x45 Hyne LGL | S og ;
External grade @ 450 crs a | Fas he te pot alate ara MGPI2
\ . . urlit ole plate using
Fall to outside 600mm o/nong | Kitchen designed by others Approved Lype hangers
Approved type glass balustrade [ - 4/30mmx2.8 nails each leg
—" | Fi—— Pole plate 140x45 Hyne Araucaria MGP12
—— — - > AG al qe 1/90mm No 14 type 17 screw every 2nd stud
es \ fol, Dining i 1 —_ ————Porapet wall
7 . Woo 7 | 3 ES : = a St Lintel 245x65 Hyne LGL
Co See, : © — aN 4 -——— UB to Engineers detail
ana : + \-f - ye - atte =| Double Posi-Struts
[Runing root \ i Wb =F Posi Joists PJ30-70 MGPI2 @ 450 crs
- Approved type hangers to beam
; | g 4/30x2.8 nails per leq
‘1! | 300x85 Hynebeam 21C con /span ———+ S 4800 Ponel~lit d
. : ~lift door
Replace Balustrade with = Determine height on site
Approved} glass balustrade | Existing brick veneer wal ° Proposed ENS | ~ | — Proposed slab 800mm above existing
/ ait a | . TL = 25mm rebate to garage floor for door
, LHL . — — —<l (== Approved type metal grate & droin
of |. Proposed Bed 1 __ ate f. oN Drive way to Local Authority Detail
a el 4 - —
ee x} |_| Approved type fill _ L -——— Block retaining 600 above existing slab
: Existing Patio Existing Concrete floor _ _ | att — — —~~~——--~ === —s eH To Engineers details ,
: " 4 tt ~~ Existing slob ea T ~~ - Connection to existing footing &
J - . - oT Natural Ground oe Slab to Engineers detail
r~—§FExisting Retaining wall CT ao |} “~—— Existing Footing
o = — TEP} Black retaining wall & footings to
S aT - Engineers details
rl ~ - Footings slab & connection to existing slab to Engineers details. Termite
aa protection to AS3660.1, 200um polyfilm to underside of slab. 50mm clean
ae sand fill under stab LIC No 077586
istit j —_— isting |C te fl , a=
Existing Patio} Eb Existing Concrete Toor NOTE: Builder to determine all dimensions on (AD sez
a Site to coincide with existing building ————
a Reol isting SHS post & patio refer to Engineer Builder to ensure the 8M max height ADRIAN BAKER COMPUTER DRAFTING
in i . es! en io esi ao mision
A Siepiace Ground” Pp p : Above natural ground is not exceeded Office 1, 36 Duke Street , Sunshine Beach , Queensland
: Ph: 07 5447 3372 Fax 07 54473416
TYPICAL SECTION B/B SCALE 1:50 (REFER TO ATTACHED STRUCTURAL ENGINEER CHANGES) EMAIL. — abok5400@bignond netau
LOT No 78 SHIRE OF NOOSA
DATE: Drawn
02/03/2007 SCALE 1:50
CHK. BY [DWG. BY
7 ABaker_|SHoRN JSHEET No 7 of 9
PROPOSED TIMBER FRAMED UPPER FLOOR ADDITION & ALTERATIONS TO EXISTING BRICK DWELLING [ree No 0606S
FOR:— TONY JACKSON OF AJJ DEVELOPMENTS Lot No: 78 25 ARKANA DRIVE NOOSA HEADS DESIGN STRENGTH W41 N3

 

 

 

 

Page 32

FOR:—

Light well

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

v
Upper floor level

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Approved type flashing

 

 

 

 

 

 

 

 

 

 

 

 

Proposed second storey

 

 

 

 

 

 

 

 

 

Rendered Blue board

 

 

 

 

 

 

 

 

 

 

Roof pitch 1°
wv ww wy

 

 

 

Roofing material to be concealed fastened
For example Clip—lock

Fixed to WSO N3 wind category

Rafters & Purlins 140x45 Hyne Araucoria MGP12
30mm Gal lao;

ped strap & approved type hangers
4/30x2.8 Nails per leq ® 9

 

Alternative Purlins EZi-Batten 1H125 series
To Manufactures specifications

 

a

 

 

————
2840

 

 

 

 

 

 

 

\
1
Ground floor level

 

 

 

 

 

 

 

 

 

 

 

Approved type battens fixed to (W50 N3)
RB_055 EZI Batten
2/Type 17 Nol4 50mm screws

 

2740

 

Proposed Garage

 

Retaining walls to Engineers detail

~\——— Top Plates 2/45x90 MCP10
Se

es

 

SS ==

 

Pole plate 140x45 Hyne Araucaria MGP12
1/90mm No 14 type 17 screw every 2nd stud
Studs 35x90 MGP10 @ 450 crs
MI2 Tie~down rods @ 1200 crs max

_

 

 

 

 

 

 

Footings slab & connection to existing slab to Engineers details.

Termite protection to AS3660.1, 200um polyfilm to underside of
slab. 50mm clean sand fill under slab

—~——— Rendered Blue board cladding

Bottom Plates 35x90 MGP10
_ _ _ Garage floor level
1-1

 

 

 

 

Raised 800mm above existing slob
tl

 

 

 

TONY JACKSON OF AJJ DEVELOPMENTS

Lot No:

TYPICAL SECTION C/C SCALE 1:50 (REFER TO ATTACHED STRUCTURAL ENGINEER CHANGES)

78

 

EGL

 

 

 

CAD

A= =|

  

LIC No 077586

 

OCesign

Division

Office 1, 36 Duke Street , Sunshine Beach , Queensland
Ph: 07 5447 3372

Fax 07 54473416

 

EMAIL: ~ [email protected]
LOT No 78

 

DATE: Drawn

 

ADRIAN BAKER COMPUTER DRAFTING
PROPOSED TIMBER FRAMED UPPER FLOOR ADDITION & ALTERATIONS TO EXISTING BRICK DWELLING

 

SHIRE OF NOOSA
02/03/2007 SCALE 1:50
CHK. BY {DWG. BY
A.Boker

 

 

 

25 ARKANA DRIVE NOOSA HEADS

 

S.HORN
REF. No 0606S

 

SHEET No 8 of 9

 

 

DESIGN STRENGTH W41 N3

 

 

Page 33

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

To ———s ae
= br nn T E
= = — So
aes =||S= B
\\ = {|= = : | =
ONS a s 2 Existing off street parking
| a
;2 |
i=
<x
1 oe |
| | [24
- | ey]
= | | & : Concrete driveway to be re-laid
= =e °o
° S \ ie |
< wS w
— = o | [2].
t oS
bh = a PROPOSED UPPER FLOOR ADDITION .£ |
eS \ © ee | TO EXISTING DWELLING |
= / xs a
4L o => © , ‘
SLY es) §3 panne | :
a 3 Ba | =|] =
Sie a & & if | S| 2
3/8 5 2 | | ! |
!
- \ OR 1 \ 2
GROUND AREA OF DWELLING 212.2 Sq/M ORERAESEST LASAAT WEL . &
ae aa
40% OF SITE AREA IS 242.8 Sq/M | i L ——— : | = Ss
LOT No 8 | a = 2 3|| 8
= fa||
AREA 607 Sq/M ; o 3 eal
COUNTY MARCH | | 5 S a
- = 3 >
PARISH WEYBA ! | = 5 =
= 3 a!
SHIRE NOOSA ea a we] oS
SP.No 94023 | | = =
a
— + — — ' >
Pe ees ee | ar]
Storm water to be connected to existing & discharged to approved drain — S Ss
Waste water to be connected to existing & discharged to approved sewer connection 2
oo 30175 : AT |
/ 101°54'10" ral
_ E LIC No 077586
SITE PLAN SCALE 1:100 (A) fae EMAIL: — abak5409@biapond net.au
ADRIAN BAKER COMPUTER DRAFTING LOT No 78 SHIRE OF NOOSA
Residen tiol Ae aon Division DATE: Drawn /
Office 1 , 36 Duke Street , Sunshine Beach , Queensland 02/03/2007 SCALE 1:100
Ph: 07 5447 3372 Fax 07 54473416 CHK. By TDwG. BY

 

 

PROPOSED TIMBER FRAMED UPPER FLOOR ADDITION

& ALTERATIONS TO EXISTING BRICK DWELLING

ABaker Js. Horn [SHEET No 9 of

 

 

9

 

 

 

FOR

TONY JACKSON OF AJJ DEVLOPMENTS

ort

No:

78 25 ARKANA DRIVE NOOSA HEADS

REF. No O606S

 

DESIGN STRENGTH W41 N3

 

 

 

Page 34

 

He8 19 40,10) sm
nae 300 Tyee
ios0

  

HB 19.6010)
Ofteat 150

 
  
 

wLt010
sL1090
Type

i368
NM15/01/07 sas
Lu i24t Tyme 37
He823.0
lus 8.00 26 Stewsoo™
len 6.00 pen
asii2 Onset ee
y i050 oa 2 400}
NH15/01/08 ly ter £1.35 90
10.60 o, si 3680
g al [24 v<013000 18.5 6010) ren
= NritS/04i02 fet 6.00 tye 200
LL 26.67
les090) : NH18/07/09
UL 39.67

NHIS/0105 &
UL10.25

 

 

  
 

‘St 3075
Type A

    
 
   
  

 
 
    
 
  
   
 

  

g we0 52001
By tee
wen 2700 Navsranes ee
(Ofteat 100 om 2 Type Stuy HCB 6900 (10)
414 ay ‘Offset 0.60,
$l 1540 nx70
a0

   

Tyee

  

Type A

PNK y
Ue ene

31

        
  
  
    

   

ca 7290 00)
‘Ofat 1,00,

 
     
       
  
  
 

  
 

  
 
        

     

       
          

         
  
   
 

  
   
  

   

     
  
  

   
 

 
     

        

   
       

   

11090
Type P

           
   

HEB 1000 (10)
Offset 0.00

W 38.75
raw = 25

  
  
 
  

     

HB 15.90 00)

Offset 1.70

Wass

SLaais

‘Type Stub wea 172000
ort

 
     
     
  
    

  

s/69/09 satis
24 Type

    

20 gaze

Narr
$122.00

     
  
 
   
 

1S
HEB 9.00 (10)
Oftsa1 090
44400

 
 

   

 

         
     
  
 

AL 41 64 te Me
/ 30 "esx 49.99% i]
rensaegae oes /
ez NH15/0401 Sy HEB 1675 40) / eae
$L1010
Type P fv 20.80 g tseoo 24 oy
27 & s.4739 sag

 
  

wc0 860 (10)
‘Ofteat 6.00,

 
 

  

    
 
 

   

kee 23.32 010)
Offset 0.00

    
  

  
  
 
 
  
  
   

HOB § 10,10)
Oftaet 1.50

 
  
 
  
    

    

a8 48.09
SL4598 SL 40.50
‘Type Stub 17 TypeA

   

26 rcaeso0e
‘Ofeat 3.00
Gover 100

Type

    

  

HOB 1445 10)
as eB 1.67 00)

    

    

Hee 42500)
Oftuat 1.60

     

 
 
  

   
   

   
   
 

= nme Cover 0.60
23 NH15/03/03 ~“7g\
24.40 oy 17
tL why,
u
1 ea 0 $900) g 2p P04 24 =- oa z22000)

 

ities, lo
3.2058 - KCB 460 (10)
Tee’ Cratos

Cover 0.00
Type

 
    

  
  
 
 

  
 

 

 

s9 00000 18 HCA 23.1040)

Page 35

 

er het perme a inp tna

“
| Aer Joba Earshot:
toe

i -

r

   
  
 
 
 

Coarcy

 
   

     
 
   

   

  

OT Seanbfn bation ‘
~ coupiea Oat

   
 
 
  
  
  

wipe bet
surely Sahiney itinoen es soft —_
feo aces =
eit

    

en ee

“Panera. 44... Dos. % — Ba ER 2 : A
ee ae

seorss 8°

 

 

 

 

 

 

 

Page 36

 

 

    
   

 

 

 

 

 

 

 

Heoveg 1 Sea

   

tn x

SAORI fAEZy
. AIBTD
= ain Ka

rani tH}
y ;

is

Temas © Ob S44
1B

as
BES CMH AD oy

 

 
 
 
  
 
 
 

sb Bey Wipe
‘7

Meee $2506 }
‘ i)

\
=e
|

 

 

       
 
  
  

LEBAGL Hs Motes”
«RRA TOK Hd)
158% 3 CK HAY Ty
A442 2(nred 3 :
13825 “att a ay?
ce 1S. (388<0.N.05 ai
Ser 15. (3897 (my J ft
bs ob Fit : 3° Masi:
4 é (08 See Pane 15478 Iron Bins! :
“ & iS. bel SY), Sin] Bearin. .
de Sieh See seh bike Teas a
de Me oe tg. 56G vew [2 lere90 pop]
eee b$  aieon y BT [rer eoe
2 Doe LS. BSFSq 085, 58237" # {
fee HS ABAAI Testo | ff
+ Pint at ‘3p Vo
83°30'ls27
oB* FQ
ey Pre
QRS aT| a:
aang ae
Pitt at \9ind 5
oo»
y 108
y Kas
so
Leas
Siete

Pin wt
wo

 

 

1653, Faris of wee as required ve be
WA 0d Sav howe:

Attenstions © aektitious «
mate by

a. pe RV
PC to204 a 296 io 215 |
= ami la t

    

“ar

 

  
 

 

 

  

       
 
 

 

   
 
 

:
ore

 

 

 

Page 37

———

 
   

 

 
 
 
 
 
  
 
 
 
  
  

Lis BAS i313
* Lat i47 (‘Sra 3
. bet re Sen ts 31243
OT GS See 6S Bb2if(Ar
i zw on oe 13.” SEauee re)
, oT 138@ne) see rs, Aer aT :
LovA3s See 1s Btn Te ee i
AGTH OD Sex 15 BERba (Lae) . . oo - .,
Loe 203 Se 1S wawjCege) ‘
Zgr ia Beets nasaacerd
& Ler7a seals Bano7Cuye)

Lot BW CRReT) Ses
betes Sey )Y SEBS Qoagit

tere)?
LaF 39 Soe "(sS4s0r ; *
ber No see Stegpoy

 

 

   

      

  

 

 

Page 38

BTA gs ye
Bm wy et

nie Se * £
q

were Y

 

 

{ditional ptari & 3
- ,Bueotiment ones.
: 1 Aofer to CISP*

 

 

 

 

Used in these records

About this file

File size
3.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0545 - Preliminary Building Works assessable against the Planning Code [As Published].pdf · 3.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.