Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

07/0545 - Preliminary Building Works assessable against the Planning Code [As Published] · 172007.545

of 38

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

INTEGRATED PLANNING ACT 1997

4

    
 
 

Form 1 Development Application

Operational &/or building work

assessable against a local government's planning scheme

Part E, Version 2.0, 4 October 2004

  

 

 
 

 

 

Completion of all question on Part E is

Mandatory for ail applications involving the assessment of operational work and/or building work (including defaited

engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual design plans for engineering & building work when the application does -
not ivolve assessment of @ material change of use of premises at the same time) assessable against a local govemment's planning scheme.

 

Nature of the application

A development permit authorises
development to occur, while a prefiminary
approval is a step in the approval process
and does not authorise development to occur.
The types of work that are assessable against

1.

This application is for (tick one (1) or both if applicable)

Ci Preliminary approval - provide details of the type of work eg. roadwork, stormwater, water and sewerage
infrastructure, eft

 

 

 

 

 

a planning scheme are determined by the AND/OR
wane for a partculr local goverment and [a Bevelopment permit - provide details of the ype of work eg, roadwork, stormwater, water and sewerage
To determine the types of work that are structure,
assessable under a particular planning [ : |
scheme, contact the relevant local
goverment. 2. Are the works subsequent to a previous development approval? .
—LW0 (71 YES - provide details of all previous approvals (eg. file references) °
3. \s the subdivision for a canal estate?
Tio yes
Portable Long Service Leave levy (if |4. ts payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?

applicable) .
Prior to issuing a development permit for the
works, the assessment manager is required
by law to “sight” an approved form, issued by
Qleave, which signifies that the PLSL levy
has been paid.

 

(YES - complete 05
LMNO - 05, 6 & 7 co not apply

Has the PLSL levy been paid?
[YES - compreteas
(C1 NO - the applicable levy must be paid before a development permit can be given for the works

How much was paid?
Whatis the receipt number of the payment?”

L |

 

 

 

PLEASE NOTE

This application cannot be accepted unless accompanied by Part A of Form 1.

The assessment manager may refus

 

e to accept an application that, at the time of lodgement, fails to provide all applicable information
requested by Part A and any other relevant part of Form 1.

 

OFFICE USE ONLY (appiicabie to assessment manager)

 

 

DATE RECEIVED

REFERENCE
NUMBERIS

 

 

 

 

Used in these records

About this file

File size
3.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0545 - Preliminary Building Works assessable against the Planning Code [As Published].pdf · 3.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.