07/0545 - Preliminary Building Works assessable against the Planning Code [As Published] · 172007.545

of 38

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

i

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 19.0, 2 March 2007

 
    

Aw Form 1 Development Application
IDAS Assessment
Checklist

 

(Formerly the “Referrals Checklist”)

IMPORTANT NOTE FOR ALL APPLICANTS: |

 

1.

This checklist was formerly referred to as the “Referrals Checkiist’ Some of the ‘Guides’ to using the IDAS Application Forms continue to refer te this document as the
“Referrals Checklist’. The name of this checklist was changed from 25 July 2005 to more accurately describe its function.

 

 

 

2. Under the IPA and IDAS tramework, an application may require assessment by the locat Council and/or certain Queensland State entities (e.g. Environmental Protection
Agency, Dept. of Natural Resources and Water, Queensland Heritage Counci etc.).

3. This checklist is provided to assist applicants to determine when an application Tequires assessment by a Queensland State entity and may also assist the applicant to
determine the assessment manager" for the application.

4. Therefore, the completion of al Questions in section 1 of this checklistis mandatory for ail applications (other than those requiring the completion of Parts A & B only).

§.  Itis the responsibility of the applicant to accurately complete this checklist.

6. Section 2is mandatory only if the proposed development is located in any part of a wild river area declared under the Wild Rivers Act 2005.

7. Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.

8. The assessment manager for the apptication will rely on the information provided in this checklist (as well as any material lodged In support of the application) to identify
any applicable referrat agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
application triggers seferral coordination.

9.  Toassist you in answering the following questions a series of guides are available free from the IPA website www ipa gld.gov.au. Guide 25 explains the role of the IDAS
Assessment Checklist in the [DAS application process, and its relationship to the Form 1 development application.

10. Any other parts of Form 1 that this checklist requires to be completed are available fromthe Councit or the applicable State entity, or can be downloaded free from
www. ipa.gid.gov.au.

11. Section 3 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006.

SECTION.1 - STATE ASSESSMENT. (completion mandatory) OP oe
| * Note: The following state assessment triggers apply to development other than for building work assessable against the Building Regulation 2006. : 3

Environmentally relevant activity 1. The application n involves: (lick applicable box/es)

For mare information refer to Guide 4. (6) an environmentally relevant activity (ERA) for which a code for environmental compliance

Untess you answered “none ofthe above" to 1, has not been made - complete Part G of Form 1

the application requires assessment by the be : . . "

inistering aulhority?, (1 (ii): a mobile or temporary ERA for which a code of environmental compliance has not been

i an entity, other than the administering made - complete Part G of Form

aulhority, is the assessment manager for the Ww (iii) none of the above

application, ihe administering authority is 2

concurrence agency for the application in relation
to this matter.

Note: An application involving ERA 19 and/or 20
will also require completion of Part Ky of Form 1

for

Act 2000 is required.

‘approval where an allocation under the Water;

 

 

Continued overleaf

 

PLEASE NOTE: ° The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed IDAS Assessment Checklist (if applicable}.

 

OFFICE USE ONLY (appiicabie fo assessment manager)

 

f
L

DATE RECEIVED REFERENCE NUMBERIS :

 

The assessment manager Is responsible for assessing and deciding an IDAS application. The assessment manager for an application is prescribed in schedule 8A of the IPA.

For additional information refer to Guide 6 ‘Does my application trigger the refesra! coordination process?’

The ‘administering authority’ may be either the Environmental Protection Agency, the relevant local goverment {for a devolved ERA) or the Queenstand Department of Primary Industries and
Fisheries (for a delegated ERA).

Page

Used in these records

About this file

File size
3.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0545 - Preliminary Building Works assessable against the Planning Code [As Published].pdf · 3.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.