Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2017-10-16 General Committee Meeting Notes

of 8

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING                                                     16 OCTOBER 2017


    Amendment No. 1
    Moved:           Cr Wellington
    Seconded:        Cr Stockwell
    The an additional item J be added to the motion to read:
    J.   That staff consider the viability of traffic and pedestrian management at the Noosa
         Drive and Hastings St intersection during the peak Christmas period.
                                                                                          Carried.


    Amendment No. 2
    Moved:           Cr Jackson
    Seconded:        Cr Stockwell
    That the first line of item I of the motion be amended change 40% to 35.5%
                                                                                             Lost.


    Amendment No. 3
    Moved:           Cr Stockwell
    Seconded:        Cr Glasgow
    That an additional item K be added to the motion to read:
    K.   That staff consider options to enhance the number of free bus services around the
         Noosa Heads locality; including the option to add a loop at the end of the existing
         Peregian Beach service.
                                                                                      Lost.


    Amendment No. 4
    Moved:           Cr Jackson
    Seconded:        Cr Stockwell
    That items C and D of the motion be amended to read:
    C.   Not Aaccept Transit Australia Group’s (Sunbus) quotation of $35,377 (excl GST) for a
         shuttle service between Peregian Beach and Noosa Heads for both the Christmas and
         Easter periods pending further advice from staff in relation to either more cost effective
         provision of the service or alternatives to the service that achieve more productive
         outcomes;
    D.   Not Aapprove the installation of temporary decals on the Peregian - Noosa Heads
         Shuttle at an estimated cost of $5,740 (excl GST) pending the outcomes of the further
         advice referred to in Item C;
                                                                                        Lost.




                                                                                      Page 4 of 8
Log in to download the original file

2017-10-16 General Committee Meeting Notes(PDF, 307KB).pdf · 314 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.