Original source · versioned page text
Traffic Engineering Report dated 31 July 2014 W D Milligan
Attached to the e-mail MCU12/0184 - Covering email for Noise & Air Quality Impact Assessment & Traffic Engineering Report (Separately registered). A Link to the Traffic Survey video is in email..
Original PDF page 13, section 1. The text section number identifies this passage in the reader.
4.0 PROPOSED OPERATIONS 4.1 DETAILS OF THE PROPOSED DEVELOPMENT The proposed poultry farm is intended to provide a growing operation under contract with one of the major suppliers of chicken, Ingham. The proposal is for the development of 8 poultry growing sheds with an overall Floor Area or approximately 13,695m2. From our own discussions with key contract management personnel from Ingham, we understand that as a result of new guidelines negotiated with the RSPCA the bird densities are being further reduced from previously contemplated densities. The current proposal is for a stocking density of 16.7 birds per square metre which will result in an ultimate capacity in the order of 230,000 birds. The sheds are proposed to be 100 to 130 metres long by 16.0 to 16.5 metres wide aligned along the ridgelines through the site. While we have held numerous discussions with the development proponent, to gain a clear understanding of their intended operation we have also, through interviews with another experienced existing long term “grower” and with a senior member of the Ingham organisation who manages existing contracts with growers. Through our investigations we have gained an understanding that the growth cycle and the management of same is well controlled and managed via Ingham, including supply of birds, feed and ultimately collection of the live birds for market. From our own discussions with Ingham representatives we understand that the growth cycle is very controlled down to the specifics of the collection process and the “age of the birds” at the time of collection. We understand that the entire batch cycle is limited to 63 days (9 weeks). It is proposed to construct poultry growing sheds on the subject site as a two stage development. Stage 1 of the development will comprise five sheds (Shed 1 to Shed 5), with the further three sheds (Shed 6 to Shed 8) to be constructed as Stage 2 of the development. 4.2 POULTRY FARM OPERATIONS The proposed development is for a commercial poultry farm, whereby the operators will grow chickens from one day old through to two target weights when collection takes place. The overall process takes place over a 63 days (9 weeks) cycle, which includes every aspect of the process, including cleaning and preparation of the facilities for the next cycle. As a result of these timeframes, 5.8 cycles or batches are expected to occur every year. A summary of the general timeframes for the chick delivery, bird growth, bird collection, and cleaning and preparation stages is shown in Figure 4-1. Ref: B14101TR001_Final - 10 - Proposed Poultry Farm – 136 Top Forestry Rd, Ridgewood
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.