Original source · versioned page text
Traffic Engineering Report dated 31 July 2014 W D Milligan
Attached to the e-mail MCU12/0184 - Covering email for Noise & Air Quality Impact Assessment & Traffic Engineering Report (Separately registered). A Link to the Traffic Survey video is in email..
Original PDF page 53, section 1. The text section number identifies this passage in the reader.
Milligan Farms - Proposed Chicken Meat Farm
- Maximum Vehicle Movements Per Batch Cycle (63 Days)
Number of Vehicles Number of Vehicle Movements (Trips)
Approx. time of trip Total Vehicle Total Heavy
Week Day Purpose of Trip 19m 8 or 9m 19m 8 or 9m
(time on site) 17 or 18m 7m Light Ute with Passenger 17 or 18m 7m Light Ute with Passenger Trips Vehicle Trips
Multi- Body Multi- Body
AV Truck Trailer vehicle AV Truck Trailer vehicle
Comb. Truck Comb. Truck
WEEK 1 1 8am-4pm (30 mins) Deliver shavings 8 0 0 16 0 0 0 16 16
2 8am-4pm (30 mins) Deliver shavings 8 0 0 16 0 0 0 16 16
3 Time nominated (50 mins) Deliver feed 2 4 0 0 0 0 0 4 4
4 9:30am-4pm (2-3 hrs) Deliver chicks 2 0 4 0 0 0 0 4 4
5 0 0 0 0 0 0 0 0
6 0 0 0 0 0 0 0 0
7 0 0 0 0 0 0 0 0
Week 1 Total 2 2 16 0 0 0 4 4 32 0 0 0 40 40
WEEK 2 1 Time nominated (50 mins) Deliver feed 1 2 0 0 0 0 0 2 2
2 Time nominated (50 mins) Deliver feed 1 2 0 0 0 0 0 2 2
3 Time nominated (50 mins) Deliver feed 1 2 0 0 0 0 0 2 2
4 0 0 0 0 0 0 0 0
5 0 0 0 0 0 0 0 0
6 0 0 0 0 0 0 0 0
7 0 0 0 0 0 0 0 0
Week 2 Total 3 0 0 0 0 0 6 0 0 0 0 0 6 6
WEEK 3 1 Time nominated (50 mins) Deliver feed 2 4 0 0 0 0 0 4 4
2 Time nominated (50 mins) Deliver feed 2 4 0 0 0 0 0 4 4
3 Arranged time (20-30 mins) Loss collection 1 0 0 2 0 0 0 2 2
4 0 0 0 0 0 0 0 0
5 0 0 0 0 0 0 0 0
6 0 0 0 0 0 0 0 0
7 0 0 0 0 0 0 0 0
Week 3 Total 4 0 1 0 0 0 8 0 2 0 0 0 10 10
WEEK 4 1 Time nominated (50 mins) Deliver feed 1 2 0 0 0 0 0 2 2
2 Time nominated (50 mins) Deliver feed 2 4 0 0 0 0 0 4 4
3 Time nominated (50 mins) Deliver feed 2 4 0 0 0 0 0 4 4
4 0 0 0 0 0 0 0 0
5 Arranged time (20-30 mins) Loss collection 1 0 0 2 0 0 0 2 2
6 0 0 0 0 0 0 0 0
7 0 0 0 0 0 0 0 0
Week 4 Total 5 0 1 0 0 0 10 0 2 0 0 0 12 12
WEEK 5 1 Time nominated (50 mins) Deliver feed 2 4 0 0 0 0 0 4 4
2 Time nominated (50 mins) Deliver feed 2 4 0 0 0 0 0 4 4
3 Time nominated (50 mins) Deliver feed 2 4 0 0 0 0 0 4 4
4 Time nominated (50 mins) Deliver feed 1 2 0 0 0 0 0 2 2
Live bird pick-up 8 0 16 0 0 0 0
5 From 2:30am (40 mins) Carry forklift & crew 1 0 0 0 2 0 0 20 18
Carry foreman & crew 1 0 0 0 0 0 2
6 0 0 0 0 0 0 0 0
7 0 0 0 0 0 0 0 0
Week 5 Total 7 8 0 1 0 1 14 16 0 2 0 2 34 32
WEEK 6 Live bird pick-up 8 0 16 0 0 0 0
From 2:30am (40 mins) Carry forklift & crew 1 0 0 0 2 0 0
1 22 20
Carry foreman & crew 1 0 0 0 0 0 2
Arranged time (20-30 mins) Loss collection 1 0 0 2 0 0 0
2 Time nominated (50 mins) Deliver feed 2 4 0 0 0 0 0 4 4
3 Time nominated (50 mins) Deliver feed 2 4 0 0 0 0 0 4 4
4 0 0 0 0 0 0 0 0
5 Arranged time (20-30 mins) Loss collection 1 0 0 2 0 0 0 2 2
6 0 0 0 0 0 0 0 0
7 0 0 0 0 0 0 0 0
Week 6 Total 4 8 2 1 0 1 8 16 4 2 0 2 32 30
WEEK 7 1 Time nominated (50 mins) Deliver feed 1 2 0 0 0 0 0
4 4
Arranged time (20-30 mins) Loss collection 1 0 0 2 0 0 0
2 0 0 0 0 0 0 0 0
3 0 0 0 0 0 0 0 0
Live bird pick-up 10 0 20 0 0 0 0
4 From 2:30am (40 mins) Carry forklift & crew 1 0 0 0 2 0 0 24 22
Foreman & crew 1 0 0 0 0 0 2
Live bird pick-up 10 0 20 0 0 0 0
From 2:30am (40 mins) Carry forklift & crew 1 0 0 0 2 0 0
5 26 24
Foreman & crew 1 0 0 0 0 0 2
Arranged time (20-30 mins) Loss collection 1 0 0 2 0 0 0
6 0 0 0 0 0 0 0 0
7 0 0 0 0 0 0 0 0
Week 7 Total 1 20 2 2 0 2 2 40 4 4 0 4 54 50
WEEK 8 Live bird pick-up 11 0 22 0 0 0 0
1 From 2:30am (40 mins) Carry forklift & crew 1 0 0 0 2 0 0 26 24
Foreman & crew 1 0 0 0 0 0 2
2 Arranged time (20-30 mins) Loss collection 1 0 0 2 0 0 0 2 2
3 0 0 0 0 0 0 0 0
4 0 0 0 0 0 0 0 0
5 0 0 0 0 0 0 0 0
6 0 0 0 0 0 0 0 0
7 0 0 0 0 0 0 0 0
Week 8 Total 0 11 1 1 0 1 0 22 2 2 0 2 28 26
WEEK 9 1 Litter Removal 6 0 12 0 0 0 0 12 12
2 Litter Removal 6 0 12 0 0 0 0 12 12
3 Shed cleaning 1 2 0 0 0 2 0 4 6 2
4 Shed cleaning 1 2 0 0 0 2 0 4 6 2
5 Any time of day Shed sanitisation 1 0 0 0 2 0 0 2 2
6 0 0 0 0 0 0 0 0
7 0 0 0 0 0 0 0 0
Week 9 Total 0 12 0 3 0 4 0 24 0 6 0 8 38 30
9 Week Total 22 61 22 8 0 9 44 122 44 16 0 18 244 226
* 30 days of the 63 day cycle generate no vehicle movements, with the exception of permanent staff 26 24
Milligan Farms
Maximium Vehicle Movements per 63 Day Batch Cycle 31/07/2014
[OCR of page images]
2 LAMBERT & REHBEIN
— ENGINEERS *« MANAGERS = SCIENTISTS
Milligan Farms - Proposed Chicken Meat Farm
- Maximum Vehicle Movements Per Batch Cycle (63 Days)
17 or 18m 7m Light | Ute with | Passenger 17 or 18m 7m Light | Ute with | Passenger
AV Truck Trailer vehicle AV Truck Trailer vehicle
Week 1 T
Week 2 T
Week 3 T
Week 4 T
From 2:30am (40 mins)
Week 5 T
From 2:30am (40 mins)
Week 6 T
Live bird
From 2:30am (40 mins)
Live bird
From 2:30am (40 mins)
time 30 Loss collection
Week 7 T
Live bird
From 2:30am (40 mins)
time 30 Loss collection
Week 8 T
Week 9 T
* 30 days of the 63 day cycle generate no vehicle movements, with the exception of permanent staff 26 24
Milligan Farms
Maximium Vehicle Movements per 63 Day Batch Cycle 31/07/2014
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.