Original source · versioned page text
Slope Stability Report - Site 1
PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007 APPENDIX C: —- QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY (CONTINUED) QUALITATIVE RISK ANALYSIS MATRIX - LEVEL OF RISK TO PROPERTY LIKELIHOOD CON: SEQUENCE ES TO PROPERTY (With Indicative Approximate Cost of Demsge)_ Indicative Value of 1: CATASTROPHIC : MAJOR 3: MEDIUM 4: MINOR Approximate Annual 200% 60% 20% 5% IN! SIGNIFIC ANT Probability 0.5% A - ALMOST CERTAIN 107 H MorL (5) B - LIKELY 107 M L C - POSSIBLE 107 M VL D - UNLIKELY 107 L VL E - RARE 107 M L L VL VL F - BARELY CREDIBLE 10% L VL VL VL VL Notes: (5) For Cell AS, may be subdivided such that a consequence of less than 0.1% is Low Risk. (6) When considenng 2 nsk assessment it must be clearly stated whether it 1s for existing conditions or with nsk control measures which may not be implemented at the current time. RISK LEVEL IMPLICATIONS Risk Level Example Implications (7) Unacceptable without treatment. Extensive detailed investigation and research, planning and implementation of treatment options essential to reduce risk to Low; may be too expensive and not practical. Work likely to cost more than value of the property. H HIGH RISK Unacceptable without treatment. Detailed investigation, planning and implementation of treatment options required to reduce nisk to Low. Work would cost a substantial sum m relation to the value of the property. May be tolerated m certain circumstances (subject to regulator's approval) but requires investigation, planning and M MODERATE RISK umplementation of treatment options to reduce the nsk to Low. Treatment options to reduce to Low nsk should be implemented as soon as practicable. - Usually acceptable to regulators. Where treatment has been required to reduce the nsk to this level, ongomg maintenance is L LOW RISK required VL VERY LOW RISK Acceptable. Manage by normal slope maintenance procedures. Note: (7) The implications for a particular situation are to be determined by all parties to the risk assessment and may depend on the nature of the property at risk: these are only given as a general euide. Form No. 68039 RL2 August 2010 Australian Geomechanics Vol 42 No 1 March 2007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.