AGS prepared a semi-quantitative assessment tool for determining the level of risk for a site.
The tool separates the potential hazards for a site, from a stability context, and rates them with
a level of risk frequency. The multiplication of these individual risk frequency summates as the
risk frequency rating which is then measured against the levels of risk nominated by AGS.
The results of this analysis are shown in Table 1.
Table 1: Results of AGS Qualitative Risk Assessment
Hazard Likelihood Consequence Risk Level
Global Failure Barely Credible Catastrophic Low
Shallow slumping of surface soils Unlikely Minor Low
Based on the results of the AGS assessment, the perceived risk based on the conditions
encountered and information available at the time of the assessment is “low”.
7.0 Hillside Construction
The following works should be implemented in additional to other items highlighted within
this document. These points are considered to be typical good hillside construction practice
as explained in attached documentation:
• Foundations for lightly loaded or non-liveable structures should be founded on and keyed
into stiff (or stronger) natural clays; Heavy structures should be supported on either piles
founded into weathered sandstone or high level footings founding into the same material.
• Where slopes are not supported by an engineer designed support system, natural slopes
within or near building envelope or movement sensitive areas should be no steeper than
2H:1V.
• Building platform fill should be limited to a maximum height of 1 m. The filling should be
step keyed into the natural slope and battered no steeper than 3H:1V unless an engineer
designed retention system is in place.
• Unsupported cuts steeper than 2.5H:1V will require engineer designed retention systems.
• All stormwater and surface water is to be discharged by an approved stormwater drainage
system. The use of subsurface drainage systems are not suitable unless greater than 50
m downslope from the envelope at this site.
• Plumbing and services must also not be allowed to leak and regular maintenance and
inspections should be undertaken.
• Erosion protection of cut and fill batters will be required. Batters should incorporate crest
and toe drainage. Batters should be vegetated appropriately to minimise erosion.
30 Nov 2020 Geotechnical Investigation
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.