Sunshine Coast 2012/13 Regional Strategy and Planning Cool Ma eMart Parent match aac eni atin Sustainable Planning Act 2009 Development Services Information Counters Locations '8.30 am to 4.30 pm Monday to Friday (excludes public holidays). Caloundra - 1 Omrah Avenue Caloundra Qld 4551 Maroochydore — Maroochy on First, 10 First Avenue Maroochydore Qld 4558 Nambour — Cnr Currie and Bury Streets Nambour Qld 4560 Tewantin — 9 Pelican Street Tewantin 4565 ALL questions MUST be ‘completed unless the form indicates otherwise. This form must be submitted to Council accompanied by the applicable fee. Attach extra pages if there is insufficient space on the form. !f Council was the Assessment Manager for the existing approval, and the approval was issued by the Court, then: | (a) a request to change the development approval and/or conditions is made to the Court; and (b) a request to extend the relevant period for the approval is made to Council. All terms used on the form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning Regulation | 2009. 1, Details of person making the request Full name — individual or company Peter Hull Architect | Contact Name — for company C/ Martoo Consulting Postal address PO Box 1684 Suburb Noosa Heads State QLD Postcode 4567 ‘Business phone 5447 2550 “AIH phone Mobile : Email address [email protected] Fax 5455 3322 2. Details of existing approval Type of approval (please tick ALL applicable categories) ‘Which entity issued approval? Development Permit O Sunshine Coast Council Preliminary Approval v¥ Other entity - please specify - Noosa Council Compliance Permit Material Change of Use Reconfiguring a Lot Operational Works Building Works Plumbing or Drainage Works Compliance Certificate Daeo-o-o Oo ooo < Privacy : Council will use any personal information provided for the intended purpose only and for remaining in contact with you. Council is authorised to collect this information in accordance with the Local Govemment Act 2009 and other Local Government Acts. Your personal information is only accessed by persons authorised to do so. Your personal information is dealt with in accordance with council's privacy policy. www.sunshinecoast.qid.gov.au | [email protected] | T 07 5475 7272 ~F 07 5475 7277 Locked Bag 72 Sunshine Coast Mail Centre Qid 4560 | ABN 37 876973 913 Caloundra office 1 Omrah Avenue Caloundra Qld 4551 | Maroochydore office 11-13 Ocean Street Maroochydore Qld 4558 Nambour office Cnr Currie and Bury Streets Nambour Qld 4560 | Tewantin office 9 Pelican Street Tewantin Qld 4565 1 of 4 2012/13 Regional Strategy and Planning Request to Change Existing Approval and/or Extension to Relevant Period FM3002s
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 2 pages
Page 2
| d Environmentally Relevant Activity -
T
| Application number/council reference TPC 1920 _ Date issued 15.09.1987
Seca —— ne RO I eee
ils the approval for a mobile and temporary ERA? : O No oO Yes — complete below -
| government area in which the ‘mobile and temporary ERA is proposed to operate/operating
Insert the name of each
3. Nature of request (please tick ALL applicable categories)
¥To change the development approval C1 To change the development O To extend the relevant period
conditions before lapsing ;
‘Please attach documentation outlining the detail of and the reasons and justification for the requested change or
extension.
4. Location of the premises
Unit No. 23 and 24 Street No 1 Street Morwong Drive
Suburb Noosa Heads State Qld
|Postcode 4567
23 and 25 ; BUP 9411
5. Concurrence Agencies
Was there one or more concurrence agencies involved in the original approval? 'v¥ No
'O Yes-provide details below
"Note — Under s372 of the Sustainable Planning Act 2009 the person making the request is required to give a copy of this request to all |
“concurrence agencies.
CT LNs STS
6. Pre-request response notice
Has a pre-request response been given by a relevant entity (e.g. a concurrence agency) for this request? |
v¥ No O Yes
If yes, please attach a copy of the notice.
7. Owner’s consent
Is the owner's consent required for this request?
lv Yes— complete either Table Aor Table B. below
| Note — If more than one owner of the land all owners’ details are required
I/We, the above-mentioned owner/s of the land, consent |
(Omners name/s LA LACK PTY LA>
2 0f 4 2012/13 Regional Strategy and Planning Request to Change Existing Approval and/or Extension to Relevant Period FM3002s
Page 3
|
Date (9( 9[ 2012
Table B — owner’s consent provided on f
Owner's name/s_ |
to the making
oO The owner's written consent is attached.
Signature/s
| NOTES: For question 7
| Under section 371 of the Sustainable Planning Act 2009, if the person making the request is not the owner of the land to which the
approval relates, the request must be accompanied by the owner's consent.
| However, owner's consent is not required if the approval:
~ relates to land the was acquisition land to which section 263(2)(d) of the Sustainable Planning Act 2009 applied when the
| application for the approval was made; or
| - is for building work or operational work for the supply of community infrastructure on land designated for the community
| infrastructure; or
_~ _ the consent of the owner would not be required under section 263(1) of the Sustainable Planning Act 2009 if a development
application were made for the requested change.
Also, owner's consent is not required if the Assessment Manager is satisfied that:
| - the number of owners of the land make it impractical to obtain owners’ consent, and the requested change does not materially
affect the owners’ land; or
| - having regard to the nature of the proposed change, the owner has unreasonably withheld consent and the requested change
does not materially affect the owner's land.
8. Does the request involve a State
Schedule 14?
v No
Nature of State owned resource:
yeii pas prescribed under the SustainablePlanning Regulation PAti:R
O Yes - complete below details ;
Nature of Evidenci
lo Evidence of allocation of / entitlement to, the resource d Evidence the chief executive has agreed to the request
Attach a copy of the evidence required above
NOTES: For question8 ee
| soe 370(3) and (4) of the Sustainable Planning Act 2009 requires that if an application for the development approval were made at
t
e time of making this request and evidence under section 264(1) of the Sustainable Planning Act 2009 would be requ
Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a State resource, a regulation may require
the application to be supported by certain evidence prescribed under regulation. Schedule 14 of the Sustainable Planning Regulation
2009 prescribes the State resources for which evidence is required to be given, and the evidence required, to support the application.
I/We, the applicant, declare that the above information is correct in all respects, at the time of lodgement of this
application with the Sunshine Coast Regional Council. Should any of the details given in relation to this application be
Changed in the future, the applicant shall advise the Sunshine Coast Regional Council in writing prior to any such change
| being implemented. _ /
(Date i¢ Pr [2008
Signature/s
3 of 4 2012/13 Regional Strategy and Planning Request to Change Existing Approval and/or Extension to Relevant Period FM3002s
Used in these records
Request to change existing approvalRelated documentApplication case desk ↗
About this file
- File size
- 2.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.