Martoo -Response to NC IR
Attached to the e-mail MCU15/0070 Response to Information Request.
Page 2
Item 5: Provide further detail of building height in metres of the gate access of the undercroft.
Applicant’s Response to Item 5: The amended plans provide further details with regard to the gates
and lower level outdoor deck areas.
Item 6: Provide amended plans proposing a three storey building.
Applicant’s Response to Item 6: Amended plans are provided that detail the height of the ground floor
level of 4.86 metres which is consistent with the scheme definition of one storey which detail:
Storey means that space within a building which is situated between one floor level and the floor
level next above, or if there is no floor above, the ceiling or roof above and includes a space for
the accommodation of vehicles. Any such space that exceeds a vertical dimension of 5m
comprises more than 1 storey.
Item 7: Provide an amended plan with maximum site cover of 40%.
Applicant’s Response to Item 7: Amended plans detailing site cover calculations are attached – (refer
DD5.1).
Item 8: Provide a plan showing site cover calculation.
Applicant’s Response to Item 8: Amended plans detailing site cover calculations are attached – (refer
DD5.1).
Item 9: Provide eaves to 75% of the perimeter of the building.
Applicant’s Response to Item 9: Amended plans detailing eaves to 75% of the building area are
attached – (refer DD5.1).
Item 10: Submit a longitudinal section of the access driveway.
Applicant’s Response to Item 10: Longitudinal section of driveway provided on drawing DD5.2.
Item 11: Provide an amended geotechnical investigation or a revised stormwater management
plan.
Applicant’s Response to Item 11: Please find attached stormwater management plan for the site.
The applicant considers that he has now responded to Council’s information request. The Decision Making
Period has therefore commenced and we request that your Council proceeds with its assessment of the
application as soon as possible in accordance with the Sustainable Planning Act 2009.
Please contact our Sunshine Coast office if you require any further information and/or clarification.
Yours faithfully,
Nadine Gorton
Senior Planner
martoo consulting pty ltd