Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

07/0806 - Preliminary Building Work assessable against the planning scheme [As Published] · 172007.806

of 27

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

twee LEO ee ee rE beep es eee wee i

INTEGRATED PLANNING ACT 1997 : Part A, Version 2.4, 29 May 2006

. Oni

     
     

 

velopment Application

 

Common details

  

 

The completion of all agplicable questions on Part Ais mandatory for all applications, Part A must be accompanied by the completed IDAS Assessment Checklist
required, arid by one (1) oF more other completed parts of the Form as required. For more Information on the parts of the Form refer to srw. ipa.old.gov.au,
Any information requasted tn the form may be provided in en ettachment to tne appicatian. For further information sbowt completing the following details. refer to Quide.|.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   
 

 

completes parts of Form 1, For infer magon aout
when a pan of Form 1 aay apply tefer to Guide 1,

Applicant details - 13.. Applicant’'sname: 15 Contact person:

 

 

Description of land 1. Street address: jncuoinghouse number, staat name, suburbvocalty name & postcode) {il applicable)
Al land the subject of the eppication, i zs
fortied Nowe. + desepie oad 08 [ Bimerd Cr} Morces, teneh ]
Teceatnneeomany em cu of water body of watercourse, within which the development is proposed: (applicable)
i ina. O82 - 02 opphes ”
dovelonment fs proposed within @ water body or
woprourse. 3, Lot on-plan description (eg. Lor 123 on RP 4567)! GPS coordinates: -
i. ‘Advice for cammpiyting Og - Most land can be -

@ . SEG een escgten These Oats [ tok iQ° BO mic a
Hihetenianiaaaliallldl wma 4 The above description is for: (tick appfcatye box)
Howey, the tend on which the developments [%)_ the fand on which the development is proposed: or
fame Me | Ot teland adoring the wales body or watercourse, within which the development is
0 eee ~ DA) the water body or watercourse.
" seyanigiodpeere ted ly ‘cevon Bay). §. Shop / tenancy number: 6. Storey / level: 2. Total area of land: fm? or ha}:
Astvice for commenting QI - 27 does ay enoty i me { } - { | { ]
developmen i} wilhin @ water body cr se, -
fda lmcomsinina sd Ceemret 18, Local government area in which the land Is stuated: (og Esk Haney Bay, Woocoo ete) (fsppdcabe
1 i ccs acam | OD. }
(eal goverrmem's area urdess pro - - ,
Loca! Governmenn Act 1983, 9. Port authority for the strategic port land or strategic port land tidal area on which the

<Odappiert i . , ,
aD ma eld « osotege evelopment is proposed: (eg. Por of Bisbane, Part of Townsvife) (i! apglicabie)
part land dM Aten, For more (scaler to Guide: . .
Proposat details 10. Existing use of the land: (eg. vacant single house. shap etc)
Homes ummern con woes | [Seo Wovge | bos! _]
11. Proposed’ ‘use of the land: (eg. 6 unit apartment bullfing. 30 tot residential subdivision, ERA for aquacuaure in
ponds with 2 totet erea of 7 ha for which wastes are released into waters oh 7 7 A ;
CL Sirelo boxe | sl CHD andl __] |

e& Other applicatle parts of Form 1 12, Other parts of Fart compteted-as part of this application: fey. PartO. Part!. etc)

Pan A must ales be accompanied by other rr eer , = ]

 

 

 

Clearty identify who is making the application. The m. .

applicant need ot be the owner of the land. iW key ~S hr V.

When signing and lodging this application 14, Contactnumber: 16. Facsimile number/e-mail address:

The applicant is responsible for ensuring the =

information provided is correct. The assessment | SWES + oS & | SYS. ee { & ]

 

manager; any referral agency & the Chief Executive
where applicable) wil rely on this information when | 17, Postal address:

 

 

assessing and deciding the application. ay
lithe applicant is a company - a contact person | fo Oo XK OS MAR OD CH ¢ YOKE Q ea S > iF
must be shown, 18. Signature: 19. Date:

 

 

 

 

 

 

 
Full text of the other 26 pages

Page 2

May 25 07 O6:23p Watherston Building 0754455510

FROM Pol

(INUPMAL §U CUUL IY.UdsObe Tue eR see VoviViwery Foy
' - .

SIECAATED PLAMRNO ACT : : “pean Yor2A20 Way

 

 

 

Seon Laan) wren pa yecintet
acti

 

a y en 6 oo antes Ua en aner mene nener test] senagncecesorsere rote enre nee se aan fens oo wa eam oe
[a

ee
fescurce anahiomners 7 gyiceway an ‘oan this appear bre @ Sima recast preeciond ane 1 Fo (ae errs

 

 

 

 

 

I corel he ebb hpadiny-ahalonnyoonntrd raster Sate compl bral wath ey Canatal Premera Manette He
acute FAC)» gs te ORY OvtS- swan

- Seem oman ene rere 122. Thes applica ts sccMnperind by WNINCR: fc preset Doel ‘
vented inmnore oat (C10 ch cre fermion 2 ot erehteretae wn, the rea = anerh ecihoren and go 0 OE
Up tee ted eeecuten Of the Capartrnerh adruinigtering the eseurce fs tadisiied tre
EVCIOpIETE fs Cemstmald WA On amacatten

eo uahrenccrays one cere hc eremnsarh t, Tea candice ~ p=
(1) che tet exscativg of the dpartrent atninbaaing he moar ce bs tnislied he
” , appiceton pay ereceed bp Ou mtamnce of em aacaticn oor
@ : eciflarrt te, the amare « gon GE

eka a Mah mndiney@ addons Th. Ettence af Om tevceece eiicment. 9 tne ;
eee ae ae.
Menten seypwoeeg teow * ooslckngtteg he resousce
‘fmaien Whee ws '

 

el teresied- command () tteme of ca

ers vont Oe Wien st 28 ee .
Ment Sinema mines

SE eee

 

 

 

 

 

 

   
 

   
    

 

Oe TS OT

Reese Wiggers 24. the (DAS Assessment Chacko complied ang witachad to tis application?

Saco | ON O10 -mesmmutetivonsiareersae
eo

Fares f dremings /repacts & ecorpening its epgiictutc

eee corm a een | Bunty | Pape Reseed! Tee co
en rd ny a .

Seep | | BOO 2tO_. aft wails:

terete SBVIEM mee lO

me ransemeysnacnscnaceseusenwwvates: oni “ ase odeberones:

oe | if |
PLEASE MOTE; row csequners vege vyhcms = erg cep a Yee ef Tolpis Be path at mp AAmIran pes by a ®
OP0 Ory efre etree A at wo

FACE UE OMY

rren

 

 

 

 

 

 

 
 
     
    
  

Hiarifewton of Engageramn of Private CorGrier Cased beet
Carcd. (Dane Ween orp an top rican ceptor te beeing wah

TO

 

uncomment t acruacmcn Wemihe..

 

 

Page 3

bKUM

‘ ‘

INTEGRATED PLANNING ACT 1997
Land owner's consent (i eppicable)
‘Section 1.2.1(3) of the IPA prusctibes that an
appdeaton must comaln, or be supparted by, the
written COrsG61 oo Ihe tend owner/s. ifthe application
invones:
4) a maeriol change of use:
(il reconfiguration of aloe
(3) work on fetid betow Jighrowatey math & not within a
cenal as defined under the Cogsta/ Protection ant
Act 1585.0
UN} worl on rad corridor land defined under the
Franspan iatasinatere Act 199%,
Seaion 2.8. 1(2ta) of the IPA provides that
Tandownes’s consent 6 fefiequited for 8 mobila or
sammer acy ERA

For moxe information rede to Guida}.

20.

(MYINZ APA YU CUUT Iu.odsale LU evasive voviviValy took

Part A. Version 2,4, 29 May 2006
Land owner’s consent to the making of this application:

 

 

 

  

Name bate
th . Ocheltsen 3¢ Lalor,
‘i
(i
tw)

   

 

 

 

 

 

 

Rasource entitlamant (i spplicenie)
‘Sedan 3.2.1(5) of the IPA requires evidence of
resaurea enidiement be given tor appfications that
invoWve a prescrbed State resaurce.

‘Section 3.2,1(00)(8)¢) of the IPA prescribes Inde an
appticanton gaat be taker i be property made
wwibout evidence of the resource entikemert,

Advice for comelating O21 423

Refer to schedule 10 of tha /agrated Planning
Reutty 1999 thot poescriters the rnalutes Of evident
required by the State In support of the lodging of eis
davelapmers application,

. Does this application invoive a State resource prescribed under a regulation (other chan involving

quarty material on State coasial land under the Coastal Protectian and Managomar Act 1996/2
ZA NO -gom aca (DYES - gor a22

This application is accompanied by evidence: flick sppicate bax)
(1 () of the allocation of, of entitlement to, the resource = anach avidericn and go io O23 (ua)
Ct) the chlef executive of the department administering the resource Js satisfled the
development is consistent with an allocation of, or entitlement to, the resource ~ go
C ili) the chief executive of the department administering the resource is satisfied the
development application may proceed. in the absence of 3n allocation of, or
entitlement to, the resource = goo 027

 

 

 

 

 

 

 

 

 

 

eave le comeing 2d td 23, Evidence of the resource entitlement:
lquermeson tie fia () Resource entivlement/ authority devaits (vi) Official stamp of the department
“The official stamp of the Oeparmern of Nanaat administering the resource (/
Resources, Mines and Water is mandatary where tne Sppticable)
aripfioaton Iaugives any wates os vesine cpinty (i) Name of a officer :
murtorial under the Water Act 2000.
Section 3.2, 105A) allows the resource manages t0 lind
ine time ve evidence May de usea, 023, must be itis
couetea ti ov ee te mace “4 {hl} Position of a officer

(iv) Signawre of delegated officer

(v) Date

(vi) ee date of evidence a

Assessment triggers "124. Is the IDAS Assessment Checklist completed and attached to this application?

This checldts does not apply if the application requites
he completion cf Parts A and @ of the Form ganty. 1
Must be completed for al other appacations.

Plans / drawings / reports

An appaiation should be accompanied by detaits 10
Suppor the proposal & enable the sssessmere
manager, relerrel agencies and any parson wowing
tne apptcnilon during pubic. scrutiny or publ
patfcation to understand the scope Uf Ulhe puposel
and ary potantigt impres.

 

25.

[LINO - tho assessmant manager may refuse m accepi this application on the

CJ Yes
grounds that the application has nat been property made

Plans/drawingsieports accompanying this application:
Pian / Drawing / Report Number

) BLS) . ike

 

 

 

 

 

 

 

 

 

 

PLEASE NOTE: the assessment manager may refuse lo accopl an application thet. ot the time of fodgemers, {ais to provide all apptcable Information required by Part A
and any other relevars pan of Form 1.

 

 

 

OFFICE USE ONLY (applicable to assessment wee ¥ 7 eRe
[res c75.g9 | nn 18-5200) | rewen  acntn Mea [names | 2007/f0b_

 

 

 

[ . . . Notification of Engagement of Private Certifier (Opanaf tarnati

Dale of engagemant ff

Accredilalion Number.

‘
j

__ Countil, Fhave baan ongaged as the private cattifiar for the building work referred to i this appicalion. |
: Siqnatuta: |

Nama:

Page 4

Part E, Version 2.0, 4 October 2004

 
    

 
 

Operational &/or building work

assessable against a local government’s planning scheme

 

Completion of all question on Part E is mandatory for all applications involving the assessment of operational work and/or building work (including detailed
engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual design plans for engineering & building work when the application does
not involve assessment of a material change of use of premises at the same time) assessable against a local government's planning scheme.

 

 

Nature of the application 1. This application is for (tick one (1) or both if applicable) .
A development permit authorises Preliminary approval - provide details of the type of work eg. roadwork, stormwater, water and sewerage
velopment to occur, while a preliminary infrastqucture, etc .

 

proval is a step in the approval process
and does not authorise development to occur. [ Adak ( LIVM">*s
The types of work that are assessable against
a planning schemé are determined by the AND /OR

 

 

scheme for a particular local government and CO Development permit - provide details of the type of work eg. roadwork, stormwater, water and sewerage
ill vary across the State. .
infrastructure, etc .

To determine the types of work that are 7
assessable under a particutar planning [ ]
scheme, contact the relevant local . ..
government. 2. Are the works subsequent to a previous development approval?

Ono (1 YES - provide details of al! previous approvals (eg. file references)

 

3. _ Is the subdivision for a canal estate?

CNo CJ Yes

Portable Long Service Leave levy (if | 4. Wee. of a Portable Long Service Leave (PLSL) levy applicable to the proposal?
Y

applicable) ; ES - complete Q5
Prior to issuing a devetopment permit for the
works, the assessment manager is required oO NO - 05, 6 &7 do not apply
by law to “sight" an approved form, issued by
ex: which signifies that the PLSLlevyy |5. - Has the PLSL levy been paid?

sb id.
een pak oO YES -completeQ6
oO NO - the applicable levy must be paid before a development permit can be given for the works

“16. How much was paid?

; 7

 

 

 

 

 

 

7. Whatis the receipt number of the payment? . a
(tho - N/A - Gwhi Fo, +o SlalF pr Loy sah tung
t v C sj — 4 ~~ wet .
PLEASE NOTE oe

This application cannot be accepted unless accompanied by Part A of Form 1.

The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
requested by Part A and any other relevant part of Form 1.

 

 

 

OFFICE USE ON LY (applicable 1o assessment manager}
. BEGEIY ” REFERENCE .
L ‘DATE RECEIVED / . NUMBERS: .

 

 

 

 

 

 

Page 5

 

_INTEGRATEO PLANNING ACT (QS? __ Part E, Version 2.0, 4 October 2004
| () Is a PLsl levy applicable in this instance? (No YES - complete Q(i)

(ii) Has the approved form (issued by QLeave and which signifies that. the PLSL levy has been paid) been sighted by the assessment

manager / private certifier at the time of lodgement of this application?

cx

| |
|

     
 

(YES - provide receipt details below

Page 6

    

ITEGRATED PLANNING ACT 1997

    

Form 1 Development Application

IDAS Assessment

Checklist

(Formerly the “Referrals Checklist”)

IDAS Aggegement Chockist, Version 20, 2 Apri 2007

 

IMPORTANT NOTE FOR ALL APPLICANTS:

 

1,

2

eran Ss

This checklist was formerly referred to a the ‘Referrals Checklist’. Some of the uldes to sng the 1DAS Applicaton Forms continue to refer to this document a5 the
“Referrals Checklist’. Tha name of this checklist was changed from 25 July 2005 t more accurately daseribe its function,

Under the IPA and IDAS framework, an application may require assessment by tha local Council and/or certain Queensiand State entities (2.9. Environmentat Protection
Agency. Dept. of Natural Resources and Water, Queenstand Heritage Counteil ete.).

This checklist is provided to assist applicants tu determine whon an application requires assessment by a Queensland State entity and may also assist the appicant to
datermine the aszessment manages ' for the application,

Therefore, the completion of allaeeions in secon { ofthis checktet s mandatory oral applications (ther thn those requtng the compton of Pats A & 8 ont
Itis the responsbbifity of the applicant to accurately complete this checklist
Section 2 ig mandatory only i the proposed development is focated in any part of 4 wild river area declared under the Wiki Rivers Act 2005. .
Depending on the nature of the application, an applicable State entity may be elther the assassmant manager or an IDAS referral agency for the spplicaton.

The assessment manager for the application wil

rely on the information provided In this checklis! (es well es any material lodged in support of te appacation) to identity

any applicable referral agencies for the application in the Acknowledgement Notice. The assassment manager wil also rely on this infontiation when Wantifying H the
application riggers referral coordination?.

‘To assist you !n answering the following questions a series of guides aro available tree from the [PA website war ipy old gov gy, ‘Guide 25 oxplains the rote af the IDAS.
Assessment Checklist in the IDAS application process, and its relationship to the Form 1 development application.
Any efher parts of Fonm 1 tha his checklist require tobe completed are available fran the Council or the applicable State entity, of can be downtoaded free from
wor 19a, q1d gov, gu.
Seaton 3 provides advice dbout tre refeols that can be required for appcatons for buiting work assessable against the Bulking Regutatton 2006.

 

The application involves: (tick appfcable box/es)

   

(2) an environmentally relevant activity (ERA) for which a code for environmental compliance

has nat been made - compte Pat G of Form f

(i) amobite or temporary ERA for which a code of environmental compliance has not been

made - comptote Part G of Form f
wii none of the above

 

Continued overleat

 

PLEASE NOTE: “The assessment manager may refuse to accept an application, which, athe time of lodgemant, falls to provide the

completed IDAS Assessment Checklist (if applicable).

 

OFFICE USE ONLY (appicabio to assessment menager)

 

 

 

 

 

4 The essesement manager Is reeponsible for assessing end decking en IDAS application, The assessment manager for 2n application Is prescribed in achedite 6A Of tne IFA,
2. For odditional information refar to Guide § Does my sppiication bigger ite referral coordination procass?”
Tho ‘minis abort may be ele the Enver Prolecon Aan, be lever! goverment (or 8 Geol ERA) oho Gunoraand Darin of Pinar nau ad

3

Fisheries (for a delegated ERA).

Paga f

 

Page 7

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checkiist, Version 20, 2 April 2007

 

State-controlad road matters ~~ 12, The application involves: (tick eppicable boxes)

Unicon een aon CI ()- development on land contiguouss to a Stete controlled road and for -

tha application tfggars referral © the Department © (a) material change of use assessabla againet the planning scheme;
of Maid Roads (OMA) as-a reerra agency. " :

  
   

 

‘manager for (hefappication; NRW isa "+,
concurrence agency‘for'the application In'rekaton:
ta matien

    

‘(1 () reconfiguring 2 fot unless -

« the total number of lots is not increased; and .
« the total number of lots abutting the State-controlled road is not increased;

(CO (0) operational work (no! assocleted with a mateviel change of uso assessable against the
planning scheme or reconfiguring a fot mantianad in (b) ebove)-
associated with acosss to a State-controlled road; or
« for filing or excavation; of .
+ invotving the redirection or intensification of site stormwater from the land, through a

pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlied road,

C (i) development on land not contiguous to a State-controled road and -
[1() material change of use - ,
» assessable agalnst the local governmeni's planning scheme; and
» mentioned In schedule 5 of the (P Regulation and exceeding the thresholds set by
that schedule;
{11 (b) reconfiguring a fot for a purpose mentioned in echedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
Wc) operational work (not associated with a materia! change of use assessable against the
planning scheme or reconfiguring a fol mentionad in (o) above)— .
« assessable against the local government's planning scheme; and .
mentioned in schedule 5 of the IP Regulation and exceeding the thresholds sel by
that schedule,

(MG) none of the above

The application involves: (tick applicable boxes)

CQ) material change of use -

(a) assessable against the planning scheme;

{b) on alot containing - .
© acetegory 1, 2073 area shown on a property map of assessable vegetation; or
« ff thera is no property map of assessable vegetation for the lot - remnant vegetation;

(c)_ where the existing use of the fand is a rural or environmental usa; and

(4) where the size of the land is 2 hectares or larger - complete Port J of Form 4

reconfiguring a lot—

(a) on.atot containing a category 1, 2 or 3 area shown on a proparty map of
assessable vegetation ar, if there is no property map of assessable vegetation for
the lot, ramnant vegetation; :

(b) where the size of the lot before the reconfiguration is 2 hectares or larger,

{c) where 2 or more lots are created; and .

(d) where the size of any fot created is 25 hectares or smaller - complete Part J of Form ¢

operational work + .

(a) for the clearing of native vegetation where the vegetation clearing is made
asseseable under Schedule 8 of the !PA; and

(b) not agsociated with a material change of use assessable against the planning

scheme mentioned in (I) or raconfiguring a lat mentioned in (ii) - compiote Pat J of
Form 1” .

Hv) none of the above.

Oi)

Oi

 

 

 

‘The application involves:

(11{i development on strategic port land es defined in the Transport infrastructure Act 1994 (TI
Act) - compat Part ¢ of Farm 4

Ci) a material change of use that is inconsistent with the land use plan approved under the
Ti Act for the strategie port land - complate Part | of Form #

. PS ii) none of the above

 

 

‘4 Lind contiguous to a Stste-contutled rad is defined in schedule 14 of tha IP Regulation 9 mean tand + it part the tare is within 100m of the Slate-controtied road; or thet is perl of 9 futuro State-

Paga2
r

 

Page 8

  

INTEGRATED PLANNING ACT 1997
Acid sulfate eolis 5.
For morg information voter to Guide 12,
Unless you answered "none of ha above’ to’06,
requires : :

  

    

 

IDAS Assessment Chackitst, Version 20, 2 Aprit 2007

“The application involves davelopment on land situated in an identified® local government area
/ and where the surface of the land is: (tick appicable box)

C1 (i) below 20m AHD® and the development will Involve the excavation of 1000m? or more of
- soil or sediment st or below Sm AHD, of

(2 (i) at or below 5m AHD and the development will involve filling the site with 000m? or more
of material .

"(58 (li) none of the above

 

 

ities or possible
ides «~:

  

  

 

Does the application involve @ materia! change of use for a major hazard facility or possible
major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?

BNO , .

(1 YES - completa Patt L of Form 4

 

 

‘Unless you erisworad ‘nana of. the abo
tha application requires, assegsment by |
4 of N: a

 

Hf en agericy other than NRW Is the essansment
smanaget for.tha appcation, NRW fs: ..
for tha application in

eancurence eg ve
“relator 6 this yee

 
  

Removal of quarry mat ci

watercourse

 

   

 

‘metoria fimn'p.watercoursa, § atso'an..
- Envirpomentely Reiavait Acti (ERA).

The application involves;
(1() operational work, for taking or interfering with water under the Water Act 2000, that is:
(tick appicable boxes) -

O(a) ina watercourse, lake or spring, (eg. 3 pump, gravity diversion, goer re-<lraction, wei oF
dom) - complote Part Ks, Ks, Ke, Ke, or Ke of Form 1 whichaver Is applicable;

(1 ®) for an artesian bore anywhere in the State, no matter what the use - complete Part
Ks of Form 1;

(©) fora subartesian bore, in declared subartesian area’, or in a certain area

: covered by a water resource plan, for use for purposes other than stock and/or
domestic use - complete Part K: of Form 1;

C1 @) fora subartesian bore, in certain declared subartesian areas, for use for stock.
and/or domestic pumposes - complete Part Ki of Form 1;

CJ) for taking overtand flow water in certain areas covered by a water resource plan
= complete Part Ks of Form 1;

(C1 (f) for interfering with overland flow water In a drainage and embankment area -
complota Pert Kyat Form 1 / .

(1 @) for constructing a referabla dam? or works that will increase the storage capacity
of a referable dam by more than 10% - complete Part Ks of Form 1; Of

TEI(i) none ofthe above.

Does the application involve development for the removal of quary material from a watercourse®
requiring an allocation notice under the Water Act 2000?

(No /
(C1 YES - complete Parts Ky and G of Form 4

oo

5 ‘Te ented lca! goverment ereas ae: Aurdun, Gowen, Bishan, Broadsound, Bundebarg, Budetin, Bute, Buren. Cobootture, Cams, Calle, Caloundra, Cardwell, Cerpentaria, Cook,

‘Cooked, Dounglas, Fitzroy, Gladstone, GoW Coast, Hervey Bay, Hinchinbrocks, ia, Johnstone,

Redcttte, Rediand, Rockhampton, Sarina, Thuringowa,
6 -Austrafan Height Detum (AHO).

‘UMingstona, Logan, Mackey, Meroochy, Maryborough, Mrlum Vale, Mortington, Noose, Pina Rivers,

7 The doclarod ground water areas are Isted in Guide 1) Qevelooment in a deciared catctment ore.

8 Raferable 6am is dafined under the Water Act 2000.
9 Watercourse is dafined ia cn 10 of the IPA.

 

Page 9

. INTEGRATED PLANNING ACT 1907

Operational work that Is tidal work or
work In coastal managament district.
For mote. Information refer to Guide.18. For
mora information about prescribed tds! work in
locel government tidal areas refer to Guide 24,

__Ratess, you anewered “none.of the, above’
"6 epptcction rogues akoestment 6 U8:
Environmental Protection Agency (EPA),
Han egency other than EPA ts the esse
‘managerfor the apptation; PA i a-° ~- -
concurrence agendy for the application in -
relation Wo-this matier..”

   

 

Operational work batow high‘water
For mora informaton refer to For
nore Information ebout prescribed tdal work In
“Npcad govemment tat areas rote jo: Guide: 24
Unless you'enawared “none ofthe above" to-
10, the application riggers referral to

: IDAS Assessment Checklist, Version 20, 2 Apa 2007
9. The application involves operational work that is: ( tick the appicable box/as)
Ct) tidal work" as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is nat prescribed tidal work - complete Part M of Form 1; OF
Ci) tidal work that is prescribed tidal work" other than in a canal"? -completa Part P of Form 1:
of
Oi

carted out within a coastal management district under the Coastal Act and for - completo
Part M of Form 1 if any box/es (a) to () below are ticked.

(a) constructing or installing works in a watercourse between MHWS and HAT (ie.
thar than thase works in tidal water) Where the development has been determined not

 

Coaetal management

For nord Informetion rater to Guide 18, :
Unless you answered ‘none of the:sbove’ to
Q11, the appicatan-requires assessment by the
Environmental Protection Agency (EPA): °

 

{fon agency her
-manager for the coplication, EPAIsa.. + - :
concurtence agency, for the appiication in -

rotation tp this'mattar, .

 

 

. to be assessable against the Water Act 2000 ;
(1 (b) constructing a canal intended to be connected to tidal waters;
C0) constructing an artificial waterway;
(11 (@) redigiming land under tidal water,
(le) disposing of dredge spoil or other solid waste material in tidal water,
"(10 - interfering with quarry material on State coastal land above high-water mark;
1) draining or allowing drainage or flow of water or other matter across State
_ Coastal land above high-water mark,
(th) removing or interfering with coastal dunes on land, other than State coastal land,
that is In an erosion prone area and above high-water mark;
(1() constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or
{5d (v)_ none of the above. on,
10. The application involves operational work that is: ( tick the appicabie box/ee)
(CO) tdtet works as defined under the Coastal Protection and Manegement Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 4; Or:
~ (i) tidal work that is prescribed tidal work" - complete Part P of Form 1; OF
(if) cared out within a coastal management district" under the Coastal Act and for-
C102) disposing of dredge spoil or other solid waste material in tidal water - complote Part
Mol Form 1, .
(21 (b) reclaiming land urider tidal water - complete Part M of Form 1; OF
C1 (c)_ constructing a canal, if the canal is associated with reconfiguring a lot - compote
. Part M of Form 1; .
BR qv) none of the above.
41. The application involves: tick the eppicoble box/es)
CA) a material change of use essessabie under a planning scheme involving operational
work cattied cut completely or partly in a coastal management district
CG) a material change of use assessable under a planning scheme involving building

work, carried out completely or partly in a coastal management district that is -

+ the construction of a new premises with a GFA'® of at least 1000m?

» the enlargement of the GFA of existing premises by more than 1000m?

Ci) reconfiguring a fot assessable under schedule 8 of the IPA where the land is situated

completely or partly in a coastal management district

CW) reconfiguring 2 lot” assessable under schedule 8 of the IPA and.in connection with
the construction of a canal - complete Part M of Form 4 , :

TH (v)_ none of the above

 

——<$<——_ Sr

10 Td work és defined in sch 10 of the IPA.

17 Prosoribed tidal work Is defined in the Coastal Protection and

9 Reudtion 2003 and Inckudes cartain lial works completly or party wtthin a local goverment dal araa,

‘Managerneni
42 Cand maans oongl at defined under the Coastal Protection and Managonent Act $205

13 Tidal work is defined in sch 10 of the IPA.

414 Praacribed fal work I3 dofined in the Coastal Protection and

Regutation 2003 and Includes certain tidal works completaly or party within e local baal area.

‘Management
at) Raa senor denis dfned bach 100! Be PA Bd meer w cual management atic under te Coes! Profocton at Menegament Ac 1998, oer an an ares declare o> 8

coastal en

distict under section 47(2} of fet Act.

16 GFA bs datfned in ach 14 of the IPA to mean the gross Boor arg. For 2 definition of how to caicutated GFA, go to the planning scheme agamét which fhe application is being assessed.
avd Haan eerer tne Croats rotation ard Manepamert Act 1085, en apical or reconfguraéon, where ihe reconfiguration i assoised wth tha constivcdon ofan aril wateway, must bo
sorompanied by the application for the operetional works 9 construct the ertfical waterway.

Page 4

 

Page 10

  
  

INTEGRATED PLANNING ACT 1997
Developmant within the fimits of a
port . ,
For mans infarination refer to Guide 18, For
“information abot rescrood eh work refer tor
Gute 24/
Ut you answored | SVES" to, Qi2, the arti
. Port Author :

 

(DAS Assessment Checklist, Version 20, 2 April 2007
12. Does the application involve development below high water mark'8 and within the limits of a port”
under the Transport Infrastructure Act 19947

Bno

J YES - compiete Part M of Form 1, ar Part P of Form 1 ifthe work is proscribed tidal work

 

 

 

13. Qoes the application involve operational work that is tidal work for a marina‘ with more than 6
vessel berths?

Bano

(C1 YES : complete Part Af of Forrn 1, ov Part P of Form 1 ifthe tidal work is proscribed (idol work

 

1114. Does the application involve tidal works within a strategic part land tidal area?
NO
YES - complete Part Md of Form 4

 

saan advica .

 

15. Does the application Involve development in a  heage registered place as ‘defined under te
Queensland Heritage Act 1992?

[INO

(YES - complate Part C of Form 1

16(b) The application involves: (tick applicable boxes)

(C1 () — amaterial change of use assessable against the planning scheme and the lot shares a
common boundary with a protected area or registered place under the Queensland

: Heritage Act 1992;

CO (i) reconfiguring a lot if the fot shares a common boundary with a protected area or

registered place under the Queensland Heritage Act 1992;
none of the above.

ti

 

Declarod catchment areas:

For core iiformiation, cinchiding's Ast of the, .

* daclared catchment areas within )Quelnaland,. =

retar tO Guides},

Unless you onswered ‘non ofthe above’ to
by

 

"|16. The application is in an area declared to be a catchment area under the Wafer Act 2000 and

involves: (tick the appiicable box/es)
CQ) reconfiguring a tot if any lot resulting from the reconfiguration is leas than 16 hectares;

OW development assessable against the planning scheme involving the establighment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994,

none of the above

Bei

 

 

 

18 figh war mark eg Po Coal Protection and Manager a 05 ard roan be ott Noh wate rar sting 6,
19 Masia is cefned in the Trenspart Operations (Marttime Potkition) Regutation 1995,
2 Stretegic port land fidal areas are the eres generally 50 matras seaward of high water mark adjacent to strategic par! land:

Pages |

 

Page 11

 

INTEGRATED PLANNING ACT 1007,
Contaminated land wo
Involving material change of use
and? of reconfiguring a tot may tigger this.
teferral, .
For mote information refer to Guide. -
Unloss you enisiored “nara of the above" fo °
17, the: application requires sssecement’by the
Envirrimenial Protaation Agincy (EPA), Hon.
agency othar then EPA.ts the astenement
menager tor the application, EPA will be 8
application in:

 

 

 

Electricity:infrastructure -
+ For mony information’ refer to scheidite Zot the IP"

Uniss you answered nono ofthe above! to
ef

 

 

  

 

 
 
 
 
 

   

 

IDAS Assassment Checklist, Version 20, 2 April 2007

17. The application involves: (tiex tne appteabie boxtes)

(1()) reconfiguring a fot for which all of part of the premises are =
(a) premises mentioned in the IPA, schedule 8, part 1, table 2 -
« item 5, including the exemption otherwise provided for by paragraph (d);
« item 6, including he exemption otherwise provided for by paragraph (@); or
» item 7, including the exemption athenwise provided for a mining activity or petroleum
activity; or
(b) in.an ares for which an area management advice has been given for unexploded
ordnance - complete Part N of Form 1
CI (ii), a material change.of use -
(a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessable against the planning scheme and if atl or part of the premises is in an area

for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1

__ Ri) none of the above .
18, The application involves: tick the appfcable box/es)

(0) _ reconfiguring a lot where eny part of the lot is -

« gubject to an easement in favour of a distribution entity or transmission entity under the ©
Electricity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or

» situated within 100m of a substation sito;

(Ui) a matorlal change of use, assessable against a planning scheme and not associated

with reconfiguring a tot if - . . .

« any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission

_ grid or supply network under that Act; and

« any structure of work that is the natural and ordinary consequence of the use is, or will be,

located wholly or partly in the easement; . .
C(t) a material change of use, assessable against a planning schame and not associated

with reconfiguring a lot if any part of the premises is situated within 100m of a substation ,

site; : :

C0 (wv) operational work that is filing or excavation assessable against the planning scheme,
not associated with reconfiguring a tot, if -

» any part of the premises is subject to an easement in favour of @ distribution entity or
transmission entity under the Electricity Act 1994 and the wark is located wholly or panty in
the easement,

« the work is located wholly or partly within 10m of a substation site;

[24 (v)_none of the above.

. Does the application involve development assessable against the planning scheme and on land

designated for community infrastructure?
{i} intended to be supplied by a public sector entity; and
(i) on land not owned by or on behaff of the Stale; and
(ii) other than development - 9
(a) for the designated purpose; or
“ (b) carried out by, or on behalf of, the designator.
{NO
(Yes

 

Pega é

 

Page 12

INTEGRATED PLANNING ACT 1997
SEQ Regional Pian |

For ory hfostion tr schodle 2ot me
IP Regulation.

Rar to Choplr 2, pa SA md ceded {Oot
“the [btearod Planning Act 1997; and schedul

  

2.4 he Regu Provionsforroran oo

 

IDAS Assessment Checklist, Version 20, 2 April 2007

+20. The application involves (tick apptcable box/es) -

C1 (i) amaterial change of use of pramises -
(a) in a Major Development Area in the Uroan Footprint for -
C1] ()  anurban activity -
(01 Inan area included in a structure plan where the IPA, saction 3.1.6
applies;
(1 in an area not included in a structure plan where -

« the IPA, section 3.1.6 applies to the application for the material change
of use; oF

« the premises exceeds 10,000m2; or

« the gross floor area (GFA) on the premises will exceed 10,000m2; or

« impact assessment is required under the relevant planning scheme
CO (i) intensive animal husbandry, or

CO (i) residential development involving a rural residential purpose
(b) in the Regional Landscape and Rural Production Area for -
01. 0 anurban activity and not apecified in section 2.4(2); or
1 (i) residential development involving a rural residential purpose and not
specified In section 2.6(2)
(¢) in the Rural Living Area for an urban activity and not spacified in section 2.8(2);
(d) in the Investigation Ares for -
CO (i) an urban activity and not specified in section n2. 10(2);
OC (i) residential development involving a rural residential purpose and not
specified in section 2.12(2); or
CO (ill) intensive animal husbandry -
1 di reconfiguring a fot-
On land in a Major Development Area in the Urban Footprint th that is:
{@) not included in a structure plan; and
(b) not specified in section 3.1(2).

.. A fii)none of the above

+ 121. The application involves: (tex the applicable box/es)

(Ai) an assessable material change of use for aquaculture - complete Part Ox of Form f;

C1 (i) assessable operational work that is the construction or raising of a waterway barrier -
complete Pad 0; of Form 1;

Oe (ii) assessable operational work completely or party within a declared fish habitat area
complete Part On of Form 1;

C1 (iv) assessable operational work that is the removal, destruction or damage of a marine
plant - complete Pat O af Form 1; . ,
Dy) development assessable under the IPA, schedule 8, part 1, on land that adjoins a
. declared fish habitat area;

 

PR (vl) none of the above.

Poge7

 

Page 13

INTEGRATED PLANNING ACT 1997

* Integration oftand use and public
transport |
For'more infermation eter to Qukia 23° ‘schedule
BAe IPA, & schadue Zo he  Renulton,

 

 

 

IDAS Assagemant Checklist, Version 20, 2 April 2007

22, The application involves: (tick the appicable box/es)~

CO (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
schedule.

C1 (i) reconfiguring 9 lot~
{2} on land that is completely or partly within a public transport corridor, and the
+" fotal number of lots increases;
(1 (b) on land that is completely or party within a future public transport corridor or
* an airport's public safety area;
(1 (c)__ ontend that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site araa is 5000m? or greater,
CI (@) _ for a residential purpose within the 25 ANEF contour for an airport;
Di (e) for a residential purpose resulting in 100 or more allotments.

C1 (ii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ji)
above, on land that—

(1 (2) _ is completely or partly within a public bansport condor or or a future public
transport corridor,
CJ (b)_, will resutt in work that encroaches into an airport's operational airspace.

(2 (iv) none of the above.

 

aay safety and efficiency * ~
For more inforristion fates fo Guida 22. schotula
Sot the BA 8 schedule 2 of te P-Reaulaton:

 

 

 

23. The application involves: ‘iotne appicable bos)

(0 @ a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
schedule.

CD Gi reconfiguring a fot—

(6) on tend that is completely of partly within a future public transport corridor,
future reitway land or a railway tunnel easement,

(1) (b) on land that is within 400m of a Citytrain passenger railway station or a afuture
Citytrain paseenger railway station, and the total site area ls 5000m? or
‘greater;

Ci (e} on land that abuts rail comides land, commercial corridor land or future railway
land, and the total number of lots increases;

(O(a) on tand that abuts rail corridor land, commercial corridor land or future railway
land and en’easement abutting the corridor or future raltway tand is created;

(Ce) ontand that is completely or partly withiri 100m of, and abutting an approach
to, a railway level crossing, and the tote! number of lots increases;

11) fora residential purpose resulting in 100 ar more allotments.

CD (ii) operational work assessable against tha planning scheme, but nat associated with 3
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m, on land that—

C1 (a) Is compietely or partly within rail corridor land or commercial corridor tand, and
the work is not for rail transport infrastructure or other rail infrastructure;

{[] (b} is completely or partly within future railway land, or a railway tunnel easement;

CO (e) abuts rail corridor land, commercial corridor land or future railway fand, and
the work is within 25m of the railway boundary.

D3 tw) none of the above.

 

Moonie to Brisbane pipeline
For mora injormation rater 0 Schedule 2of the 1

 
  
 

Uniess.you angwered. “none of the abows", the -
the holder of:

 

24, The application involves the easement for the construction or operation of the Moonie to

Brisbane strategic pipeline, and involves: (tick the applicable box/as)—

(1) a material change of use assessable against the planning scheme and nol associated
with reconfiguring a lot, and any structure or work will be located wheily or partly in the
easement.

C1 (i) reconfiguring a fot

C2 (i) operational work assessable against the planning scheme, that is ling excavation,

_ compaction, driting, boring or piling not asseciated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.

Tl (iv) none of the above,

Page 8

 

Page 14

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 April 2007,

 

Koala habitat area 25, The application involves: (tick the epptconie noxles}—

ifornetion, orto Guide 25 ata . , a .
tcheite 2 oto esa (1 (i) a material change of use of premises in a koala conservation area or koala
Uniees you snsworad “none of the shove’, tie”

application requ 8 reterral to:tho Environmental
rtecion Anan ¢ a eencumence aponcy:" .

   

sustainability area made assessable under a planning scheme, that is net for a domestic -
activity and wil result In -

(Cb) anew building and any reasonably associated structure with a total footprint

"greater than 1000m?;

Ci an
thé extension has a total footprint greater than 1000m?,
extracting gravel, rock or sand from an area greater than 5000m?,

Ole)

CO (f) additional traffic in a koata conservation area or koala sustainability area,
between 8p.m. on a day and 6a.m. on the following day. .

result in-

(1 (a) anincraased number of lots;

Gi) operational work in a koala conservation area or koala sustainability area made
assessable under Schedule 6, Part 1, Table 4, items 1A to 1G (not associated with
over an area greater than 2500m?,

7 (Ww) operational work in a koala conservation area or Koala sustainability area made
mentioned in (1) or reconfiguring 8 tot mentioned in (i) above) that is not for a domestic activity
and will result in -

CO) extrecting gravel, rock or sand from an area greater than 5000m?;
(O(c) excavating or filing an area greater than §000m?,

1 (a) clearing of native vegetation over an area greater than 2500m?,
an extension to an existing building and any reasanably associated structure if
Ot)
excavating or filling an area greater than 5000m?;
(i) reconfiguring a fot in a koala conservation area or koala sustainability area that will
(CO (b) clearing of native vegetation over an area grester than 2500m?,
reconfiguring 8 lot mentioned in (i) above) that will result in the clearing of native yegetation
assessable under a planning scheme (not associated with @ matorial change of use
(1 (a) clearing of native vegetation over an area greater than 2500m%
Gal (v) none of the above.

26. Does the application involve Govelopment in ina wid liver area area declared under the Wild Rivers Act

2005?
KINO
Cl yes

 

 
 

“127, Does the application involve a development tor which srolminery approval is sought under

Section 3.1.6 of the Integrated Planning Act 1997?
GINO
CI YEs

 

Wetland

 

”

boc blvy man tw eansducn ovo
of singla residence ona lot end:any reasonably
rrp OF 8 |

   

 

') 28. “The application involves: (tick the applicable paras) «

(1() _— amaterial change of use, other than for a domestic activity, assessable againet the
* — planning’schema that is in or within 100m of a wetland;
C18) reconfiguring a lot -

In or within 100m of a wetland that will resutt in
1 €@) mare than 10 tots being created; or
(7 (d) lots lass than $ hectares;

KK ii) none of the above

 

Paged ©

 

Page 15

INTEGRATED PLANNING ACT 1807 . IDAS Assessment Chackilst, Version 20, 2 Apail 2007

 

  
 

Conservation Estate « | 29. The application involves; (tick the applicable boxtes)—
‘Ubon purpecas ie dnd fa the Unegtated Ci (i) a material change of use for urban purposes that is in or within 100m of eny of the
_Prenning Act 1907 fa “purposes for which lai following -
an - [1 (@) aprotected area, forest reserve, critical habitat or area of major interest under
: the Nature Conservation Act 1992;;

 

(J (b) a State forest or timber reserve under the Forestry Act 1959;
(l(c) amarine park under the Marine Parks Act 2004;
J (¢) arecreation area under the Recreation Area Management Act 1988;,
C1 (e) a world heritage area listad under the World Heritage Convention;
(11) Brisbane forest park under the Brisbane Forest Park Act 1977,
Di) reconfiguring a lot if -
Cita) any part of the lotis situated in, or within 100m of, any of the following -
CG) a protected area, forest reserve, critical habitat or area of major
interest under the Nature Conservation Act 1992;
EX qi) a State forest or timber reserve under the Forestry Act 1959;
C(t) a marine park under the Marine Parks Act 2004;
. Clq) a recreation area under the Recreation Area Management Act 1988;
(](v)  aworld heritage area listed under the World Heritage Convention,
Brisbane forest park under the Brisbane Forest Park Act 1977; and
(tb). the reconfiguration involves more than 10 lots being created, or any lot
resulting from the reconfiguring Is less than Sha;
w (iii) none of the above.

agency for the application. : ;

 

 

 

Page (0

Page 16

INTEGRATED PLANNING ACT 1997.

    
   

 

Below Is a list of the referrals thatcan apply to an application for building work assessable against the Buliding Regulation 2008. This section of the [DAS
Assessment Checklist is provided for advice only. This section of the 1DAS Assessment Checklist is not requirad to be compteted and lodged with an

application for building work assessable against the Buliding Regulation 2006 only.
Special fre'services ~ generally .- |
Fo¥ more information go te echeciula 2 lable tend,

1. An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
requires special fire servicas mentioned in schedule 2A part 1 of the Jntegrated Planning Regutation 1998
(IP Regulation) or includes an alternative solution assessed against the pérformance requirements of the
Building Code of Australia, .

 

 

  
   
   
 

 

An apptication may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
the subject of the application requires the installation of a fire safaty system for a budget accommodation
duiding.

 

 

Sprey-painting’ - | [3 An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrance agency
}For mere intimation (Go w schedule 7ot the |B. if the application involvas a workplace incorporating spray painting, .

 

‘An application may tiggar referal to Safe Food Qid as a concurrence agency if tha application involves a
rotall meat premises.

 

An application may trigger referral to the Dapartment of Health as a concurrence agency if the application
invotves a private health facility.

 

An application may trigger referral to the Department af Industial Relations (DIR) as an advice agency ifthe
application involves a work place area fess that 2.3m,

 

An application may tigger referral to the Department of Main Roads as a concurrence agency of advice
agency if the apptication involves land contiguous to a State-controlled road.

 

An application may trigger referral'to the Department of Industrial Relations (DIR) as a concurrence agency
if the application involves pastoral workers accommodation. - ,

 

~~ An application may tigger referral to the Department of Communities as a concurrence agency Hf
apptication Involves a childcare centre, .

 

. An application may tigger referral to the Environmental Protection Agency (EPA) as a concurrence agency

[Coastal'devalopment .
if the apptication Involves land complstely or partly seaward of a coastal building ling22,

For mote Information go to acheduta ‘of the JB
| Renta finn

 

 

. An application may trigger referral to the Heritage Council as a concurrence agency If the application
involves a heritage registered place. . :

 

  
  
   

 

.112, An application may trigger rafarra! to the Department of Primary Industries and Fisheries (DPISF) as a
concurranca agency if the application involves assessable building work in a declared fish habitat area; or
as an advice agency if the application involves assessable bulkiing work on land that adjoins a declared fish
habhat area. . :

. Anvapplication may tigger referral to Queenstand Transport as @ concurrance agency if the application
involves axisting or future public transport coridors, or airport operational airspace,

Fishorlas mattors :
For more information go Wo schedule 2 of tha IP

   

 

 

. An application may trigger referral to Queensland Transport ag a concurrence agency H the application
involves future railway land. ,

 

 

 

 

NOTE: CONCURRENCE AGENCY ASSESSMENT PERIOOS

Tha local government, as the concurrence agency. is required to assess and:provide a response for the following buliding appfications within a prescribed
time. For applications relating to design and siting (17, 18 & 19), and building work for removal or rebuilding (23), the assessment period is 5 days. For all
other applications the assessment perod Is 15 daya. If no response is recolved from the local goverment for an application, it is taken to be a seemed
refusal. However for amanity and aesthetics impact of particular building work for @ single detached class 1a or clas 10 building or structure (15), no
response Is taken to ba a deemed approval. co

Amenity and aasthatic impact‘of 5. An application will trigger @ referral to the focal goverment if ita:

particular bullding work-for'singl © fora single detached class 1 building or class 10 structure; and

 

 

 

detached class 1. building or clase 10 -
building or structure . ‘
For more information go to schedule 2 table. 1 of the
IP Regulation, .
Assessment period 15 days, No response Is a

 

¢ the focal govamment has deciared by resobution the following:
~ tha appearance of the building or structure will have an extremaly adverse Impact on the amenity of
the locality, and
~ the appearance of the buliding or structure would be In extreme confiict with the character of the
locality. :

 

 

 

rr

2 Coastal building tines are prescribod under the Castel Protection and Management

Act 1905.

2 Operational airspace is 28 defined In Stata Planning Polkey 1/02 “Development in the Vicinity of Cartain Alports and Aviation Facies".

Rage 15

Page 17

INTEGRATED PLANNING ACT 1997

IOAS Agsessment Chacklist, Version 20, 2 April 2007

 

Whether particular buildings. may be | 16.

occupled for residential purposes’

An application to use an existing building that ig not class 1, 2, 3 ar 4 for residential purposes may trigger a
raferral 1 the local government as the concurrence agancy.

 

. Anapplication may trigger referral to the toca! government #9 the concurrence agency If the building work

does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code.

. An application may trigger referral to the local government as the concurrence agency if the building work

does not comply with tha qualitative statement for building clearance and site cover,

. An application may trigger referzal to the local government as the concurrence agency if the building work

does not comply with the qualitative statement for parformance criteria 4, 5, 7, 8 of 9 of the Queenstand
Development Code, part 11 or 12.

 

|, Atvapplication may trigger referral to the local government as the concurrence agency to datermine tha

building will comply with the fire safety standard under the Building Act 1975 when the building wark has
been completed.

 

. Anapolication may trgger referral to the local govammant as the concurrence agency to determine if the

building work
¢ complies with the performance criteria of the Queensland Development code part 15; and
» — tha work dogs not comply with an acceptable sotution stated in the part.

 

 

Eads on fo 00G a

 

|. An application for bullding work for premiges in which residential care service under the Resivential

Services (Accrodifstion) Act 2002, section 4, is conducted, or is proposed {0 be conducted, will trigger
referral to the local gavemment as the concurrence agency.

 

Bullding work for removal
rebuilding © "+

 
   

423,

An application for tha removal and/or rebuilding at another site of a bullding of other structure, will trigger
toferral to the local government as the concurrence agency,

 

   

Former kon goo sched? ae 1
{IP Ragutatiin ond to QOC'pert 25."
Assessment patiod 16 days, No response yo ..- |

 

 

24,

An application may trigger referral to the locat government ag the concurrance agency to determine if the

building work or structure complies with the relevant performance criteria if «

© Under the Building Regulation 2008, a rainwater tank Is proposed to be installed 38 part of relavant
building work, In a designated rainwater tank area; and

« Under the Queensland Development Code, part 25, the rainwater tank does not include an acceptable
solution for a relevant performance criteria,

 

Page 16

 

 

Page 18

 

 

 

 

 

 

 

 

 

5
8 NON-SLIP &
& FINISH 5
L
DRIVEWAY PLAN
Scale 1:100

CROSSOVER DETAIL

Scale 1:20

 

 

KERB & CHANNEL
SEM!-MOUNTABLE

 

 

 

i

 

 

 

PROPOSED

 

 

 

 

ADDITION

 

 

 

 

 

 

 

 

 

 

 

DRIVEWAY

        

 

 

PROPOSED AODITION

 

 

 

Se

NOMINAL KERB LINE

 

 

 

 

 

 

 

 

 

PROPOSED:
RENOVATION

 

 

 

 

 

 

 

 

 

SAW CUT AND BREAKOUT __f

BACK OF KERB & CHANNEL

BARRIER, SEM!-MOUNTABLE KERB
& CHANNEL OR INVERT CROSSING

 

     

     

SITE PLAN
Scale 1:200

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

— Revisions 1. Very dersnslons prot to consiuction «figured dimensions lake precedence °} ight: Davi i Project:; Proposed Designed: D Date:_ 19/03/07
Be Reva anes co 2 reelen at seemaeaes 2007 Wath ers on Builders Pty Ltd asratione/maailions ee D Scale: 1:100 (A3)
. RET: | PROFESSIONAL BUILDING SERVICES Abnonatourt SITE PLAN
5 Hora a tice Marcus Beach Q
6. Tl 4 Pre a e nae 5 Po Box. 11 Woombye Qld 4559. Client: y
Proprietary a collars to all Penetrations in ground stab unless noled See , Phone/Fax: (07)54455510 Mobile: 0409611398 Matt & Nadina Sheet #:] Job # Drawing # Rev #:
"caine ts pci comece ‘(Spun Maen | bes Rm SEO Q.B.S.A. Licence Number 1109379 Robertson 01|2007:120! WD.01| A
rea: sq.m = - -

 

 

 

't

 

Page 19

 

 

 

 

6275 1

 

at 1720

8166

 

  

1468

 

 

shr shelf,

f hol water system
-— .  . — - provide teing point [EF :

 

1560 tes 2700 7 are.

relocate existing

200

 

 

te00 3 3418
of 2808 70 70 3418
SERVICE

 

COURT

 

 

 

f :
rape 380808 15.0604

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1030
716

806C
1820

 

 

. ee . >” BaRALET™)
i val vt ' aa
.060H vos [Lt no | coon

 

 

 

    

 

 

 

 

 

8560
646
70

to

 

220

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

   
  
 

 

 

[MM itt.
WASTE Og COVERED
® TERRACE #2

    
 

PERIMETER WALLS

Ground Floor

 

 

 

 

 

 

 

24.09LV 24.09LV ©

~

 

 

 
  

|
NI
\

TTT

\
Zz
é STUDY/ ra
3 TIMBER Li
A AP
WA 7 X
WW evoserd

 

 

2
a
a

 

 
   

702085
5760
6200

70
220

1309
14369

4141

 

5554
5885,

 

 

220

 

 

 

 

 

 

825

 

 

.
\ .
NO
7 LIVING
. 7 met, .
/ 7
“KITCHEN
Re Taner Ridge
0-
eaeage 7

 

 

 

 

 

 

 

 

 

 

 

 

 

 

150

 

 

1560 2700 i 1290 1710
70 70

5000 220

 

 

340 1 4444

 

 

 

 

 

70 [pr
10696

 

 

  

GROUND FLOOR PLAN

Scale 1:100

 

 

 

WORKING DRAWINGS.

 

 

 

 

 

 

 

 

 

 

 

 

 

GENERAL NOTES:
1. Verity dimensions prior to construction - figured dimensions take precedence
cover scaled dimensions.
2. All work to comply with relevant authority acts, regulalions and requirements.
3. TIMBER FRAMING: To be carried out in accordance with AS 1684.2 - 1999
” Residential Timber - Framad Construction. : :
4. Comply wilh engineering documentation for footing, slab, frame and roof
structural details.

5. Provide a moisture barrier (min. 200um thick) under ground stabs with 200mm.

taps, Securely tape all joints and penetrations.
6. Termite barriers to comply with AS 3660.1 Provide Termimesh or equal
proprietary system collars to atl Penetrations in ground stab untess noted
othermse. .
7. Provide a positive fall away from the residance for all disturbed ground at the
building perimeter untess specifically detailed otherwse.
Copyright: David Vitani 2007

© Copyright: David Villani 2007
COPYING IH PART OF WHOLE IS
STRICTLY PROMDITED WHTHOUT

   
  

 
 

 

Malt & Nadina Robertson

  

 
 
 
 
  

 

  

DESIGN WIND SPEED:

 

S22
a + Bs

 

Watherson Builders Pty.Ltd

PROFESSIONAL BUILDING SERVICES

Po Box. 11 Woombye Qid 4559.
Phone/Fax: (07)54455510 Mobile: 0409611398

Q.B.S.A. Licence Number 1109379

   
  
  

Project: Proposed
Alterations/Additions

Almond. Court
Marcus Beach Q

Matt & Nadina

   
  

Date: 19/03/07
Scale: 1:100 (A3)

Designed: D Villani

Drawn: _D Villani

Orawing:

GROUND FLOOR PLAN

  
 

 
  

  

  

Sheet #:] Job # Drawing #: Rev #:

 

 
 

 

 

02/2007:120| WD.02 Al.

Page 20

 

 

es

 

12020

 

 

190

 

 

 

Pe

 

Ly a

a e,
os

sete

aati, att TT ae,

tar

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4 i
t
‘ jl
4
+ ‘
‘
5
\
4 '
‘ i .
EXISTING FLOOR PLAN
7 4
4 Scale 1:100
+
isi OTES: i jact: f i |: 5
= Revisions 1. very dimansions pio to constuction -fgures dimension take precedence | © Copyright: David Villani 2007 j Project Proposed Designed Dv Date S137
: ver sealed j £ , : cale: 1:
A ee cas 2 sa om sean suboty ace eters andreas. | SENG RCSA ' Watherson Builders Pty Ltd |Alterations/Adcitions em
3. TIMBER FRAMING: To ¢ carried out in accordance with AS 1684.2 - 1999 UTHORITY, VICES Lot: 1 20) rawing:
Resi tial Timber - Fi dC .
sae re ng, ame ate “| PROFESSIONAL BUILDING SERVICES. | ain ong ¢ourt EyisTING FLOOR PLAN
5. in. 200um thick) under ground siabs with 200mm | Mar & Nadina Roberson Marcus Beach Q
id a q
° ars lo ee nds utes ried Pew . Phi ire eor)saasse0 ‘Mobile 0409611398 Client: :
‘ Mi = % : : . : E ——— :
eee or ranan : . news lal nena . SP # - 5 lanelF ax: Matt & Nadina Sheet #: | Job #: Drawing #: Rev #
f ids itive fall away from the residence for ait distur tthe ish: Weyba . . .
"pulling pecnoler unless specicaly cetfed obese. IGauth Mach] DESIGN Wino SPEED: Q.B.S.A. Licence Number 1109379 Robertson 03/2007:120; WD.03/A
Copyright: David Villani 2007 Area, 910 sq.m W33N -N2 - t

 

 

i
t

i

 

 

Page 21

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

zincalume custom orb
roofing @ 25° pitch, '

90x35'exposed h3 pine

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NORTH EAST ELEVATION

 

Scale 1:100

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

zincalume custom orb
roofing @ 25* pitch,

 

 

 

 

 

LLU

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

==

 

 

 

 

 

 

 

 

zinealume down pipe
to mach roofing ————»4

painted rendered. brickwork

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

palnted randeved. beickwork

 

 

 

 

 

 

ct

 

 

 

 

 

90x35 exposed h3 pine
rafters @ approx 900 @.

fw gutter, zincalume half round
profile fixed with straps.

180 x150 h3 pine

 

painted rendered brickwork

 

 

post refer deta

 

 

7. guiter, zincatume half round ye .. :
profile fixed with straps. | raters approx S00 @.
ee —— painted rendared blue boa it i tel)
{
painted rendered brickwork painted rendered brickwork
2
150 x150 h3 pine 2
post refer detail, i ‘
zincalume gown pipe
to match roofing
powder coated alum, f
framed windows & doors. a
a we eee (4 ee
oe ee ee en en ee en ne ne ee ee ee en eee | _}-- fanfare ene e nee
L
' 1

 

powder coated alum,
framed windows & doors,

SOUTH EAST ELEVATION ~

 

Scale 1:100

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
    

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

  

 

 

 

f

isi OTES: 5 ject: i 5 i Date: 19/03/07
Revisions 1. raitychen ions prior to construction - figured dimensions take precedence | © Copyright: David Villani 2007 Project:|Proposed Designed ow a “T00 1A3
No: |Revigign: _ Cate: over scaled dimensi ‘COPYING IN PART OR WHOLE IS B ’ Id Pt Ltd Alterations/Additions |Orawn:_D Villani Scale: 1: (A3)
A_|WORKING DRAWINGS 19/03/07 | 2. aul work to comply with relevant authority acts, regulations and requirements. STRERY PROABITED wETHOUT W ath erson unlaers Y » craig
: i i 42-4 ; . :
3, TIMBER FRAMING: To be carried out in accordanca with AS 1684.2 - 1999 ILDING SERVICES Lot: 120 9
Residential Timber - Framed Construction. . -
4, Comply wih engineering documentallon for footing, sb, frame and root Reo PROFESSIONAL BUILD ) Almond ‘Court ELEVATIONS #1
tructural details. ners: i>
§. Provide a im istira harrier (min. 200um thick) under ground slabs with 200mm Malt 8 Nagin Reson Marcus 'Beach Q
laps. Si rely tape al ts and \etratl a - -
6. Termite baniers to comply with AS 2660, Provide Ternimesh or equal ea * a T6 Ph re Box. ee Oe een 4398 Client” ¢
tem collars to all Penatrations i d slab uniess noted : : one/Fax: . Shast Fob Drawing Reve
proprietary sys tem collars to all Penetrations in ground slab untess note ae é = - 2: (07) Matt & Nadina oat Toran ov
7. Provide a positive fall away from tha residence for all disturbed ground atthe [Parisht;_Weyba . .
bulling perimeter unless epeccaly detaled otherwise. County? Mao DESIGN WIND SPEED: Q.B.S.A. Licence Number 1109379 Robertson 0412007:120} WD.04;A
Copyright: David Villani 2007 Area. 910 sq.m W33N - N2 4

 

Page 22

 

i
zincalume custom orb

a 7 a eo roofing @ 25" pitch, ,

    

       

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

_ 600mm eave |
f. gulter, zincalume haff round
Ped [ | prot ixed with straps.
eee cee ene eens nee nee n tenes na nenencnennneneenneneney TISSUE Coenen enn acne nme ennnennseeecnnenaceannnnnnen
« hae
90x35 exposed h3 pine a
raflers @ approx 900 2. ir zincalume down pipe
4 to match roofing
! ui
i
painted FC wilh battens ——_————~-f i i]
i
oe enna eens bt nee eee eens
n t
powder coated alum, ,
@ framed windows & doors,
. , \
SOUTH WEST ELEVATION i
1

 

Scale 1:100

 

=e

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4
‘ v zincalume custom orb
roofing @ 25° pitch,
: a

25" = |

z 600mm eave

rw gutter, zincalume haif roynd ry typical
profile fixed wilh straps. | \ oF
pene ne ee nen e ne ne nena nena nad ¥ Y 1 + ¥ LU L REEL TEL Ui

 

 

 

 

90x35 exposed h3 pine
rafters @ approx 900 .

@ zincalume down pipe

to match mofing <=,»

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

painted rendered brickwork

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

powder coated alum, f
framed windows & doors.

NORTH WEST ELEVATION :
Scale: 1:100

4

. 4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

isi GENERAL NOTES: ; caned: ,
No: | Revision: Revisions a 1, Verify dimensions prior lo construction - figured dimensions take precedence © Copyright: David Villani 2007 { Project: IP ro posed Designed: D Date: 19/03/07
| Bavision: _ 3 over scaled dimensions. COPYING IN PART OR WHOLE'S f | Alterations/Ad Drawn: DO Scale: 1.100 (A3)
A_| WORKING DRAWINGS . 19/0307 2 ae 4 Wath e rs O n B ul | d e rs Pty Ltd Lot: toG . Drawing:
4 RPD: ‘ PROFESSIONAL BUILDING SERVICES t
Socrates Owners a Almond Court ELEVATIONS #2
§, Provide a moisture barrier (min. 200um thick) under ground stabs with 200mm | Mail 4 Nadina Robertson ‘ . Marcus Beach Q
taps. Securely tape all joints and penetrations. : :
6, Termite barders to comply with AS 3660.1 Provide Termimesh or equal pat & i“ Te Po Box. 11 Woombye Qld 4559. Client: {
bropitary system collars to all Penetrations in ground stab unless nated SEE Phone/Fax: (07)54455510 Mobile: 0409611398 Matt & Nadina Sheet #:] Job 4: Orawing # Rav #
7. Provide a positive fall away (rom the residence for all disturbed ground at tha (Parish: _Weybi . -
building perimeter unlass specitcally deiaiedotewse Soni Wee DESIGN WIND SPEED: Q.B.S.A. Licence Number 1109379 Robertson 05 2007: 4 20 WD . 05 A
Copyright: David Villani 2007 Area, 910 sq.m W33N-N2 4 t

 

 

 

 

 

 

 

 

 

 

   

' '

Page 23

 

NOOSA COUNCIL [i

REQUEST FOR DEBTORS INVOICE

 

 

_| Accounts Receivable Use Only , -
DEBTOR NO: . INVOICE NO:

 

 

 

 

 

 

DEBTOR NAME: — Suncoast Building voproied?
oo TF
DEBTOR ADDRESS: £0 Box jolt

hnaroach4 Wore aw gest.

 

DETAILS TO APPEAR ON THE INVOICE: - fypliiphov for Preliminary
: . TF 7 7

fuildi ng Work at_} Almovd _lovet, macevsr Seach

- = Your Mfernu = 2007-0874. Oud rtfrrtn ee - zoo7/ sob

 

 

 

 

 

 

 

 

 

 

 

 

AMOUNT (Excluding GST) - $ 476-00
GST AMOUNT - . a $c
TOTAL AMOUNT (Including GST) — § gare og
. i taster | Sub. _ Activity
REVENUE GENERAL LEDGER NUMBER: 12000 443 | 704
~ > Work Order Number Task Aetivity
_ REVENUE WORK ORDER NUMBER: | . | .
AUTHORISING OFFICER'S SIGNATURE: ee Fe
AUTHORISING OFFICER'S NAME: (Please Print) Saprth HO
DATE: a £2008 contacto: (07) saga 24d:
/_| POST INVOICE | OR RETURN TO ©

 

 

 

 

 

 

 

Please Note! All of the sections above MUST be completed.

 

 

Office Use Only

Revenue Account Name:

 

Revenue Type:

 

 

 

 

 

 

 

 

 

 

 

‘GST: : ves | Ho "Processed

 

 

 

_ARe: \prod\word\forms\requestdebtorsinvoice. doc 27/2/2007

 

Page 24

Trish Sweeney

From: ' Suncoast Building Approvals ([email protected]}
Sent: . Thursday; 17 May 2007 5:17 PM

To: Trish Sweeney

Subject: . Re: Your reference 07-0829 - Attention Eve

Hi Scienta, ©

I have left messages with the builder to arrange for the owner Nadia to sign
-the form A. Iwill keep trying daily and forwarded it ASAP.

Regards,
Eve Mason

Suncoast Building Approvals

3/63 The Esplanade

PO Box 1054
aroochydore QLD 4558
h 07 5443 7288

Fax 07 5443 8816

~---- Original Message -----

From: "Trish Sweeney" <tsweeney@noosa. qld. gov.au>
To: <[email protected]>

Sent: Thursday, May 17, 2007 12:29 PM’

Subject: Your reference 07-0829 - Attention Eve

Hi Eve,

Have you received Nadina Villani's signature for 1 Almond Court, Marcus
Beach (Preliminary Building Works» Against the Planning Scheme) .

The application is still not properly made and as such we cannot proceed.
until we recieve this signature.

Regards,

cienta Hesse

cting Administrative officer - Land Use
Noosa Council

Ph: 07:5449 5293 Fax: 07 5447 1062
[email protected]

Page 25

 

ea NOOSA Checklist - Applications Involving Land
Development & Land Use Sections

 

IDAS APPLICATION

This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.

 

41 Form 1 Part A Or
J Mata nt
1.1.1 Ensure that the form is fully completed. 6 aor

 

 

 

 

1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is reathted.
1.1.2.1 If there are multiple owners, the consent of each owner is required.
4.1.2.2 — If the owner of the land is a company, either ACN No. or Company Seal required.
4.2 Form’ Part B-O Supporting Information

1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. Lv]
1.1.2.1. Ensure that each of Forms B-O which are attached are fully completed.

 

 

34 "Ensure that Part G is completed if EPA referral is ‘required.

3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.

REQUESTITOICHANGE’APPROVAL 3 Erie

41 Ensure that items 1-28 have been checked and/or completed including information regarding

applicant details and owners consent.
OAs are : Eee aes eee ea
5.1 Ensure that at least 6 sels of the Plan of Development (5 for Reconfiguration and Operational

 

 

 

    
 

   

 

 

 

 

 

 

 

 

 

Works) accompanies the application. In addition ensure that each set is complete. f
5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and.is Y
unbound. .

 

61 ¢ Ensure that at least 6 copies of any y report accompanies the application (5 for Reconfiguration
. and Operational Works). If the application is accompanied by a covering letter, ensure that itis

r capable of reproduction.
«ete iG : . WA

In the case of veoeaen ensure that 1 of the copies is in an A3 or A4 format and is unbound.

 

 

 

 

 

 

 

7.1. Ensure that the vapalication fe "ee, as determined from the Council's adopted scale of fees, /
accompanies the application or has been paid.
7.2 Ensure that the fee which has been paid is recorded on the application form. 4
Receiving Officer Latta HOLY cate sescescaeseaecsseeseesens pate... WU: L097...
Having completed this form and accepted the application, please deliver both to the following IDAS Application Receiving
trays:-

e Ifthe application is for a Material Change of Use exclusively -AOP1's desk in the Land Use Section.

«Ifthe application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section.

* — [f the application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the
Land Development Section.

« Inatl other circumstances — AOP1's desk in the Land Use Section.

Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.

 

 

 

SEP] g.\ant\orms\application checklist.doc

Page 26

on wit

Private Building Certifiers

Suite 3 / 63 The Esplanade, MAROOCHYDORE QLD
P.O Box 1054, MAROOCHYDORE QLD 4558
Phone 07 5443 7288 Fax 07 5443 8816

Email: [email protected]

 

Your Independent Private Certifiers Making Building Approvals Easy

03/05/2007
To- Noosa Shire Council
Attention- Town Planning Dept
From- John Hill
Reference- Preliminary Building Approval Application —

At: 1 Almond Court, MARCUS BEACH
Lot: 120. SP: M 1116

Please find following parts A & E application forms, and four (4) sets of plans for the
proposed dwelling for the above mentioned site.

* Please debit our account no. 3670 for the amount of $575.00 for this application.

If you have any queries in relation to this matter please contact our office on the number
above.

Regards,

‘i ohn Hill

Sheets sent including cover:

Please quote our reference in reply SBA No.: 07-0829

The information contained in this facsimile is solely intended for the named recipients only and may contain confidential or legally
privileged information. If you are not the recipient copying or disclosure is strictly prohibited. Please advise of error and destroy
original.

Page 27

\

SUNCOAST BUILDING APPROVALS

Private Building Certifiers

Suite 3/63 The Esplanade, MAROOCHYDORE QLD 4558

P.O Box 1054, MAROOCHYDORE QLD 4558

Phone 07 5443 7288 Fax 07 5443 8816 Email: [email protected]

4 May, 2007

Noosa Shire Council
PO Box 141
TEWANTIN Q 4565

Dear Sir,

RE: PRELIMINARY BUILDING APPROVAL FOR A PROPOSED NEW DWELLING AT
1 Almond Court MARCUS BEACH (Lor 120 PLAN M 1116)
SBA REF: 06-0829

Proposed additions include a new garage without eaves, step outs under the eaves to rear of
the house and front setback of 4653mm to OMP of covered terrace in lieu of 6000mm,
therefore requires a code assessment.

| hope this information is sufficient for you to issue a Preliminary Building Approval. Should
your require any further information regarding the above, please contact the undersigned on
the number above.

Yours faithfully,
SUNCOAST BUILDING APPROVALS:

Jack Greensill
Building Certifier

Used in these records

About this file

File size
1.7 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0806 - Preliminary Building Work assessable against the planning scheme [As Published].pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.