Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

07/0806 - Preliminary Building Work assessable against the planning scheme [As Published] · 172007.806

of 27

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Part E, Version 2.0, 4 October 2004

 
    

 
 

Operational &/or building work

assessable against a local government’s planning scheme

 

Completion of all question on Part E is mandatory for all applications involving the assessment of operational work and/or building work (including detailed
engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual design plans for engineering & building work when the application does
not involve assessment of a material change of use of premises at the same time) assessable against a local government's planning scheme.

 

 

Nature of the application 1. This application is for (tick one (1) or both if applicable) .
A development permit authorises Preliminary approval - provide details of the type of work eg. roadwork, stormwater, water and sewerage
velopment to occur, while a preliminary infrastqucture, etc .

 

proval is a step in the approval process
and does not authorise development to occur. [ Adak ( LIVM">*s
The types of work that are assessable against
a planning schemé are determined by the AND /OR

 

 

scheme for a particular local government and CO Development permit - provide details of the type of work eg. roadwork, stormwater, water and sewerage
ill vary across the State. .
infrastructure, etc .

To determine the types of work that are 7
assessable under a particutar planning [ ]
scheme, contact the relevant local . ..
government. 2. Are the works subsequent to a previous development approval?

Ono (1 YES - provide details of al! previous approvals (eg. file references)

 

3. _ Is the subdivision for a canal estate?

CNo CJ Yes

Portable Long Service Leave levy (if | 4. Wee. of a Portable Long Service Leave (PLSL) levy applicable to the proposal?
Y

applicable) ; ES - complete Q5
Prior to issuing a devetopment permit for the
works, the assessment manager is required oO NO - 05, 6 &7 do not apply
by law to “sight" an approved form, issued by
ex: which signifies that the PLSLlevyy |5. - Has the PLSL levy been paid?

sb id.
een pak oO YES -completeQ6
oO NO - the applicable levy must be paid before a development permit can be given for the works

“16. How much was paid?

; 7

 

 

 

 

 

 

7. Whatis the receipt number of the payment? . a
(tho - N/A - Gwhi Fo, +o SlalF pr Loy sah tung
t v C sj — 4 ~~ wet .
PLEASE NOTE oe

This application cannot be accepted unless accompanied by Part A of Form 1.

The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
requested by Part A and any other relevant part of Form 1.

 

 

 

OFFICE USE ON LY (applicable 1o assessment manager}
. BEGEIY ” REFERENCE .
L ‘DATE RECEIVED / . NUMBERS: .

 

 

 

 

 

 

Used in these records

About this file

File size
1.7 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0806 - Preliminary Building Work assessable against the planning scheme [As Published].pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.