Skip to the record
Search everything, all in one place.

Council archive · source document

07/0806 - Preliminary Building Work assessable against the planning scheme [As Published] · 172007.806

of 27

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checkiist, Version 20, 2 April 2007

 

State-controlad road matters ~~ 12, The application involves: (tick eppicable boxes)

Unicon een aon CI ()- development on land contiguouss to a Stete controlled road and for -

tha application tfggars referral © the Department © (a) material change of use assessabla againet the planning scheme;
of Maid Roads (OMA) as-a reerra agency. " :

  
   

 

‘manager for (hefappication; NRW isa "+,
concurrence agency‘for'the application In'rekaton:
ta matien

    

‘(1 () reconfiguring 2 fot unless -

« the total number of lots is not increased; and .
« the total number of lots abutting the State-controlled road is not increased;

(CO (0) operational work (no! assocleted with a mateviel change of uso assessable against the
planning scheme or reconfiguring a fot mantianad in (b) ebove)-
associated with acosss to a State-controlled road; or
« for filing or excavation; of .
+ invotving the redirection or intensification of site stormwater from the land, through a

pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlied road,

C (i) development on land not contiguous to a State-controled road and -
[1() material change of use - ,
» assessable agalnst the local governmeni's planning scheme; and
» mentioned In schedule 5 of the (P Regulation and exceeding the thresholds set by
that schedule;
{11 (b) reconfiguring a fot for a purpose mentioned in echedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
Wc) operational work (not associated with a materia! change of use assessable against the
planning scheme or reconfiguring a fol mentionad in (o) above)— .
« assessable against the local government's planning scheme; and .
mentioned in schedule 5 of the IP Regulation and exceeding the thresholds sel by
that schedule,

(MG) none of the above

The application involves: (tick applicable boxes)

CQ) material change of use -

(a) assessable against the planning scheme;

{b) on alot containing - .
© acetegory 1, 2073 area shown on a property map of assessable vegetation; or
« ff thera is no property map of assessable vegetation for the lot - remnant vegetation;

(c)_ where the existing use of the fand is a rural or environmental usa; and

(4) where the size of the land is 2 hectares or larger - complete Port J of Form 4

reconfiguring a lot—

(a) on.atot containing a category 1, 2 or 3 area shown on a proparty map of
assessable vegetation ar, if there is no property map of assessable vegetation for
the lot, ramnant vegetation; :

(b) where the size of the lot before the reconfiguration is 2 hectares or larger,

{c) where 2 or more lots are created; and .

(d) where the size of any fot created is 25 hectares or smaller - complete Part J of Form ¢

operational work + .

(a) for the clearing of native vegetation where the vegetation clearing is made
asseseable under Schedule 8 of the !PA; and

(b) not agsociated with a material change of use assessable against the planning

scheme mentioned in (I) or raconfiguring a lat mentioned in (ii) - compiote Pat J of
Form 1” .

Hv) none of the above.

Oi)

Oi

 

 

 

‘The application involves:

(11{i development on strategic port land es defined in the Transport infrastructure Act 1994 (TI
Act) - compat Part ¢ of Farm 4

Ci) a material change of use that is inconsistent with the land use plan approved under the
Ti Act for the strategie port land - complate Part | of Form #

. PS ii) none of the above

 

 

‘4 Lind contiguous to a Stste-contutled rad is defined in schedule 14 of tha IP Regulation 9 mean tand + it part the tare is within 100m of the Slate-controtied road; or thet is perl of 9 futuro State-

Paga2
r

 

Used in these records

About this file

File size
1.7 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0806 - Preliminary Building Work assessable against the planning scheme [As Published].pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.