Council archive · source document
00147091.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
, INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 19.0, 2 March 2007
SEQ Regional Plan 20. The application involves (tick applicable box/es) -
For more information refer to schedule 2 of the CO (i) a material change of use of premises —
PReaeton in a Major Development Area in the Urban Footprint f
Refer to Chapter 2, part $A and schedule 10 of (a) ina Major Development Area in the Urban Footprint for -
the Integrated Planning Act 1997, and schedule CD (i) anurban activity -
iter ator Provisions for relevant [J in an area included in a structure plan where the IPA, section 3.1.6
Regulatory Provisi y . . . .
Unless you answered “none of the above” to applies;
Q20, the application requires assessment by the [J _ in an area not included in a structure plan where -
gement . . . og .
Office of Urban Management (OUM) e the IPA, section 3.1.6 applies to the application for the material change
of use; or
e the premises exceeds 10,000m2; or
e the gross floor area (GFA) on the premises will exceed 10,000m2; or
« impact assessment is required under the relevant planning scheme
(J (ii} intensive animal husbandry, or
C] (iii) residential development involving a rural residential purpose
(b) in the Regional Landscape and Rural Production Area for -
C] (i) anurban activity and not specified in section 2.4(2); or
C1 (ii) residential development involving a rural residential purpose and not
specified in section 2.6(2)
@ (c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);
(d) in the Investigation Area for —
(J (i) an urban activity and not specified in section 2.10(2);
(J (ii) residential development involving a rural residential purpose and not
specified in section 2.12(2); or
CJ (ii) intensive animal husbandry
(ii) reconfiguring a fot-
On land in a Major Development Area in the Urban Footprint that is:
{a) not included in a structure plan; and
(b) not specified in section 3.1(2).
(iii) none of the above
Fisheries matters 21. The application involves: (tick the applicable box/es)
For more information refer to schedule 2of the IP LJ (i) an assessable material change of use for aquaculture - complete Part O1 of Form 7;
equialion. we : . : oe .
Unless you answered “none of the above” to L] (ii) assessable operational work that is the construction or raising of a waterway barrier -
Q21, the application requires assessment by the complete Part Os of Form 1,
DR matings and shales [_] (ii) assessable operational work completely or partly within a declared fish habitat area-
@ If an agency other than DPI&F is the assessment . complete Part Oz of Form 1; .
manager for the application, DPI&F is a (| (iv) assessable operational work that is the removal, destruction or damage of a marine
concurrence agency for the application in . :
relation to items (i) — (iv) and an advice agency plant complete Part O2 of Form 1,
in relation to item (v). [_]{v) development assessable under the IPA, schedule 8, part 1, on {and that adjoins a
declared fish habitat area;
(X] (vi) none of the above.
Page 7See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
00147091.001.pdfRelated documentPublic source context ↗
07/0409 MCU - Multiple Housing Type 2 Duplex 23 James St [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.