Skip to the record
Noosa’s premier civic archive.

Council archive · source document

00147091.001

of 64

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

,      INTEGRATED PLANNING ACT 1997                                                                     IDAS Assessment Checklist, Version 19.0, 2 March 2007
        Koala habitat area                    25.  The application involves: (tick the applicable box/es)—
       sched   2 ote Ip Rewlotor     and            CJ (i) a material change of use of premises in a koala conservation area or koala
        Untess you answered ‘none of the above", the        sustainability area made assessable under a planning scheme, that is not for a domestic
        application requires referral to the Environmental  activity and will result in -
       Protection Agency as a concurrence agency.            (J (a)  clearing of native vegetation over an area greater than 2500m?;
                                                             (F (b)  anew building and any reasonably associated structure with a total footprint
                                                                     greater than 1000mz2;
                                                             (J (c)  an extension to an existing building and any reasonably associated structure if
                                                                     the extension has a total footprint greater than 1000m?2;
                                                             (C1 (d) extracting gravel, rock or sand from an area greater than 5000m2;
                                                             (J (e)  excavating or filing an area greater than 5000m2;
                                                             [_] (f} additional traffic in a koala conservation area or koala sustainability area,
                                                                      between 6p.m. on a day and 6a.m. on the following day.
                                                    L) (ii) reconfiguring a fot in a koala conservation area or koala sustainability area that will
                                                             result in -
                                                             (J (a)   an increased number of lots;
                                                             [_] (b) clearing of native vegetation over an area greater than 2500m?2,
                                                    (1 (iii) operational work in a koala conservation area or koala sustainability area made
                                                             assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
                                                             reconfiguring a lot mentioned in (if) above) that will result in the clearing of native vegetation
 @                                                           over an area greater than 2500m?.
                                                      1] (iv) operational work in a koala conservation area or koala sustainability area made
                                                             assessable under a planning scheme (not associated with a material change of use
                                                             mentioned in (i) or reconfiguring a lot mentioned in (ii) above) that is not for a domestic activity
                                                             and will result in —
                                                             (J (a)   clearing of native vegetation over an area greater than 2500m?;
                                                             [J (b)  extracting gravel, rock or sand from an area greater than 5000m?;
                                                             [J (c}  excavating or filling an area greater than 5000m2,
                                                    XI (v) none of the above.
        Wild river area                        26.  Does the application involve development in a wild river area declared under the Wild Rivers Act
        For more infarmation, refer to Guide 27     2005?
        Ifyou answered YES to 026, you must also     x] NO
        comptete section 2 of this checklist. This will
        enable you to determine if your application can (] Yes
        proceed in a wild river area and which referral
        agency will assess your application against the
        Wild Rivers Code, or if the proposed
        development is “prohibited” in a witd river area.
        Note: Development can be “prohibited in a wild
        fiver area because the application cannot be
@       accepted by the assessment manager.
        Referral coordination                  27.  Does the application trigger referral coordination?
        An Information request requires referral
        coordination ff the application invalves -    XI NO                   a
           () 3 of more concurrence agencies; or     (I YES, as the application: (tick the applicable box/es)
           (ii) _a facility or area assessable under a            .      :                                    .
              planning scheme and prescribed in              C1 (i) — triggers 3 or more concurrence agencies;
           _,, Schedule’ or 8 of the IP Requiaton: or        C1 (ii)   involves a material change of use made assessable under a planning
           (iii) development which is subject to an                                        :    :                               a
              application for preliminary approval                     scheme and prescribed in schedule 7 of the IP Regulation;
              rentioncd fy 2.1.6 othe PA.                    C1 (iii)  involves a material change of use (other than a dwelling house, outbuilding
        For more information go to Guide 2 and Guide 6,                or farm building) made assessable under a planning scheme, or
                                                                       reconfiguring a fot, in an area prescribed in schedule 8 of the IP Regulation;
                                                             (1 (iv) _ is for a preliminary approval mentioned in $3.1.6 of the IPA
         Referral agency responses priorto   | 28.  Did areferral agency give a referral agency response under s3.3.2 of the IPA before the
         lodgement                                  application was made to the assessment manager?
         Under 83.3.2 of IPA a referral agency may give a & NO
         referral agency response on a matter within Its
        jurisdiction about a proposal before an        J YES - attach @ copy of the referral agency/s response/s
         application for the proposal is made to the
         assessment manager.
         This is commonly the case where an application
         requires referral to a building referral agency (eg.
         Qid Fire and Rescue Service).

                                                                                  Page 9

Used in these records

About this file

File size
3.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

00147091.001.pdf · 3.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.