Overlay - Flood Hazard ® @
Table Errart No text of specified style in document.1 Flood Hazard areas
column 4 column 2 Column 3
Specific Outcomes Probable solutions Compliance
Safety and floodplain function
O14 The proposed use does not compromise the safety of $14.1 The use does not result in an increase in the number of | Complies - Floor area will be located above flood area.
people or property from floods up to and including a 1% AEP persons living, working or congregating in Fiood Hazard Areas
(1:400 year AR/ flood event. identified on Overlay Maps OM1.3—OM9.3; or
$14.2 Atleast one access route above the 1% AEP (1:100
year ARD flood level is available for evacuation; or
$14.3. An area of sufficient size and dimensions to
accommodate users is provided, above the 1% AEP (1:100
year AR/) flood level that allows for safe congregation and
evacuation;
AND
$14.4 Works avoid any reductions in on-site flood storage
capacity and contain within the site any adverse changes,
including changes to the depth, duration or velocity of flood
waters up to and including a 1% AEP (1:100 year ARS flood
event.
$15.1 No solution provided Conditions may be imposed if considered appropriate
015 Development does not result in adverse impacts on
people’s safety and capacity to use fand within floodplains.
Hazardous materials
O16 Public safety and the environment are not adversely $76.47 Hazardous materials are manufactured and stored Hazardous materials not intended to be stored on the site.
affected by the detrimental impacts of floodwater on hazardous | above the level of a 1% AEP (1:100 year AR? flood event:
materials manufactured or stored in bulk. OR
$16.2 Buildings or structures used for the manufacture or
storage of hazardous materials are designed to prevent the
intrusion of floodwaters up to the level of a 1% AEP (1:100
ear ARI) flood event.
infrastructure
O17 Sewerage treatment plants maintain their function 517.1 Components of the sewerage treatment plants that are Sewerage treatment plants not proposed for site.
during flood events up to a 1% AEP 1:100 year AR flood likely to fail or may result in contamination are—
event a) located above the level of a 1% AEP (1:100 ARD flood
event; or
b) are designed and constructed to exclude water inundation :
or infittration and resist hydrostatic and hydrodynamic
forces as a result of inundation.
P18 ST ot appiicable —SSSSCSC—C—SSCCOCCSCt‘“‘(‘“*S
079 All lots have sufficient area that is above the 1% AEP $19.7 The minimum area above flood level for each tot, is in Councils minimum floor heights to apply
(1:100 year ARA flood level or where modelling is not accordance with standardsError! Reference source not found.;
available, the highest recorded flood tevel, to safely and AND
adequately accommodate their intended use. $19.2 Where the existing roads servicing a development
provide a specific flood immunity (as determined by Chapter 6
of the Qld Transport Road and Drainage Design Manual and
' PSP 1 outlines information Council may request for development within an area identified as Flood Hazard Area.
Page 7See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
00147091.001.pdfRelated documentPublic source context ↗
07/0409 MCU - Multiple Housing Type 2 Duplex 23 James St [As Published]Related documentApplication case desk ↗