Minor Change Existing Approval MCU16 0070 01

of 6

Page text shows just the words. Original shows the document exactly as it was published.

                                                                              Officer:            Tara Norley
                                                                              Direct Telephone:   07 53296414
                                                                              Our Reference:      MCU16/0070.01
                                                                              Your Reference:     n/a

               25 June 2024


               PJ Serfontein TTE & CB O'Donnell TTE
               C/- Brennan Planning Pty Ltd
               44 Maple St
               COOROY QLD 4563


               [email protected]



               Dear Applicant
                                           Decision Notice – Minor Change
                                                         Planning Act 2016

               I refer to your application received on 5 October 2023, requesting a minor change to an existing
               development approval. Council decided your requested changes.
               Details of the decision are as follows:
               1.     APPLICATION DETAILS

                Application No:               MCU16/0070.01

                Street address:               69 Mary St, Noosaville

                Real property description:    Lot 1 RP 64833

                Planning Scheme:              Noosa Plan 2020 (25 September 2020)

               2.     DECISION DETAILS
               The following type of approval was issued on 26 June 2016.
                 •    Development Permit for Material Change of Use of Premises - Commercial Business Type 3
                      - Veterinary
               In relation to the request to make a minor change to the existing approval, Council on 20
               June 2024, decided to approve the requested changes. The changes are detailed below.
               A.     Approve the change.
               B.     Amend condition 2.
               C.     Include additional conditions 9, 10, 11 and 12.
               D.     Agree to enter into an Infrastructure Agreement with the applicant that provides for
                      contributions in lieu one on site car parking space.
               E.     Add Property Note 1.


               ABN 97.969.214.121                                                            PO Box 141
               noosa.qld.gov.au                                                       Tewantin QLD 4565
               [email protected]                                                       07 5329 6500
                                                                                                       Page 1 of 6
Document Set ID: 23064252
Version: 7, Version Date: 26/06/2024
Log in to download the original file

Minor Change Existing Approval MCU16 0070 01.pdf · 169 KB (small file)

Full text of the other 5 pages

Page 2

               3.     CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.
               4.     ASSESSMENT MANAGER CONDITIONS

               PLANNING
                      When Conditions must be Complied With
               1.     Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
                      the use commencing, and then compliance maintained at all times while the use continues.
                      Approved Plans
               2.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                         Plan No.          Rev. Plan/Document Name                                     Date

                         23-354 A100       -      Site Plan prepared by Steve Campbell Design          10.05.2023

                         23-354 A300       -      Ground Floor Plan prepared by Steve Campbell         10.05.2023
                                                  Design

                         23-354 A301       -      Upper Level Floor Plan prepared by Steve             10.05.2023
                                                  Campbell Design

                         23-354 A400       -      Elevations prepared by Steve Campbell Design         10.05.2023

                      Noise
               3.     The use must be undertaken and operated in a manner that causes no detrimental effect
                      upon the amenity of the surrounding properties. In this regard, where a complaint (other than
                      a frivolous or vexatious complaint) is made to Council about noise from the approved use
                      areas, Council may require the operator or site management entity to have a suitably
                      qualified acoustic consultant undertake a Noise Impact Assessment (NIA) in accordance with
                      the Environmental Protection (Noise) Policy 2008. The NIA report must be submitted to
                      Council for endorsement which outlines the findings and recommendations of the NIA. The
                      recommendations must be implemented.
               4.     The dog kennel room located on the top level is to be acoustically insulated to ensure noise
                      from any barking dogs cannot be heard outside of the building.
               5.     The dog kennel room is to have non-opening windows.
               6.     The use of air-conditioning to be used to control ventilation and temperature in the dog kennel
                      room.
               7.     No animals are to be housed on site overnight.
               8.     Noise emission from mechanical equipment shall comply with the following requirements:
                      a. Air-conditioning
                             i.        7am to 10pm: Maximum background + 5dB(A)
                            ii.        10pm to 7am: Maximum background + 3dB(A)
                      b. Pumps
                             i.        7am to 7pm: Maximum background + 5dB(A)
                            ii.        7pm to 10pm: Maximum background + 3dB(A)
                           iii.        10pm to 7am: No audible noise.


                                                                                                        Page 2 of 6
Document Set ID: 23064252
Version: 7, Version Date: 26/06/2024

Page 3

               Additional Conditions – 17 June 2024
                      Infrastructure Agreement
               9.     The applicant must comply with the requirements of any Infrastructure Agreement entered
                      into with the Council with respect to the payment of car parking contributions in relation to
                      the proposed development. In the event that the Infrastructure Agreement does not apply a
                      minimum of 12 car parking space must be provided and marked on the site and made
                      available and accessible at all times while the use is open for business.
                      Landscaping
               10.    A minimum of 10% of the site must be retained as landscaping.
               11.    Existing vegetation on the site must be retained, except where required to be removed to
                      accommodate the approved building extension along the western boundary. In this regard,
                      the removal of vegetation must not extend beyond the 12.3m length of the built to boundary
                      portion of the building.
               12.    Trees to be retained must be protected from clearing or construction activities by:
                      a.      clearly marking vegetation to be retained with flagging tape
                      b.      installing protective fencing around the drip line of the vegetation
                      c.      restricting stockpiling, storage and vehicle parking to those areas which are already
                              cleared
                      d.      using low impact construction techniques around vegetation.
               5.     REASONS FOR APPROVAL

               Not applicable.
               6.     REFERRAL AGENCIES

               Not applicable.
               7.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
                      Aboriginal Cultural Heritage Act 2003
               1.     There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
                      approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
                      The ACH Act establishes a cultural heritage duty of care which provides that: “A person who
                      carries out an activity must take all reasonable and practicable measures to ensure the
                      activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the
                      duty of care. Substantial monetary penalties may apply to individuals or corporations
                      breaching this duty of care. Injunctions may also be issued by the Land and Resources
                      Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity
                      that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value
                      of Aboriginal cultural heritage.
                      You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any obligations
                      under the ACH Act.
                      Equitable Access and Facilities
               2.     The plans for the proposed building work have NOT been assessed for compliance with the
                      requirements of the National Construction Code - Building Code of Australia (Volume 1) as
                      they relate to people with disabilities. Your attention is also directed to the fact that in addition
                      to the requirements of the National Construction Code as they relate to people with
                      disabilities, one or more of the following may impact on the proposed building work:



                                                                                                             Page 3 of 6
Document Set ID: 23064252
Version: 7, Version Date: 26/06/2024

Page 4

                      a.      the Disability Discrimination Act 1992 (Commonwealth);
                      b.      the Anti-Discrimination Act 1991 (Queensland); and
                      c.      the Disability (Access to Premises – Buildings) Standards.
                      Infrastructure Charges
               3.     This Development Permit will not trigger an “Infrastructure Charge Notice” to be issued in
                      accordance with Council’s “Charges Resolution” made pursuant to the Sustainable Planning
                      Act 2009 and in conjunction with the State Planning Regulatory Provision (Adopted
                      Charges).
                      Environmental Protection Act
               4.     The development should be undertaken and operated in a manner that causes no detrimental
                      effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
                      lighting, air-borne hazards, atmospheric pollutants (including dust or odours) nuisance or any
                      other emissions in accordance with the provisions of the Environmental Protection Act 1994.
                      Infrastructure Charges
               5.     All developments and/or changes to existing developments may require payment of
                      “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
                      made pursuant to the planning legislation and regulations current at the time of issue. For
                      further information, please refer to https://www.noosa.qld.gov.au/planning-
                      development/development-tools-guidelines/infrastructure-charges
               8.     PROPERTY NOTES

                      MCU16/0070.01 – Infrastructure Agreement
               1.     An Infrastructure Agreement has been signed in association with Council Approval
                      MCU16/0070.01. The Agreement relates to the provision of contributions in lieu one on site
                      car parking space.
               9.     FURTHER DEVELOPMENT PERMITS REQUIRED

               Not applicable.
               10.    SUBMISSIONS

               Not applicable.
               11.    RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               12.    OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available on line at
               www.noosa.qld.gov.au or at Council Offices.




                                                                                                       Page 4 of 6
Document Set ID: 23064252
Version: 7, Version Date: 26/06/2024

Page 5

               Yours faithfully,




               Richard MacGillivray
               Director Development & Regulation
               Phone: (07)5329 6500
               Email: [email protected]
               Enc:     Appeal Rights
                        Infrastructure Charge Notice
                        Approved Plans/Documents
                        Infrastructure Agreement
               cc.      Unitywater




               DECISION NOTICE HISTORY
               •     Original Decision Notice – 26 June 2016.
               •     Decision Notice - Minor – MCU16/0070 – 17 June 2024 - with an amendment to condition 2, additional conditions 9, 10, 11 & 12
                     and additional property note 1.




                                                                                                                                 Page 5 of 6
Document Set ID: 23064252
Version: 7, Version Date: 26/06/2024

Page 6

                                                                              Appeal Rights
                                                                              PLANNING ACT 2016 & PLANNING REGULATION 2017




               Chapter 6 Dispute resolution                                                   (3) The appellant or, for an appeal to a tribunal, the registrar must,
                                                                                                  within the service period, give a copy of the notice of appeal to –
               Part 1 Appeal rights
                                                                                                  (a) the respondent for the appeal; and
               229 Appeals to tribunal or P&E Court
                                                                                                  (b) each co-respondent for the appeal; and
               (1) Schedule 1 of the Planning Act 2016 states –
                                                                                                  (c) for an appeal about a development application under schedule
                   (a) Matters that may be appealed to –
                                                                                                      1, table 1, item 1 – each principal submitter for the
                         (i)   either a tribunal or the P&E Court; or                                 development application; and
                         (ii) only a tribunal; or                                                 (d) for and appeal about a change application under schedule 1,
                                                                                                      table 1, item 2 – each principal submitter for the change
                         (iii) only the P&E Court; and
                                                                                                      application; and
                   (b) The person-
                                                                                                  (e) each person who may elect to become a co-respondent for the
                         (i)   who may appeal a matter (the appellant); and                           appeal, other than an eligible submitter who is not a principal
                                                                                                      submitter in an appeal under paragraph (c) or (d); and
                         (ii) who is a respondent in an appeal of the matter; and
                                                                                                  (f)   for an appeal to the P&E Court – the chief executive; and
                         (iii) who is a co-respondent in an appeal of the matter; and
                                                                                                  (g) for an appeal to a tribunal under another Act – any other
                         (iv) who may elect to be a co-respondent in an appeal of the
                                                                                                      person who the registrar considers appropriate.
                              matter.
                                                                                              (4) The service period is –
               (2) An appellant may start an appeal within the appeal period.
                                                                                                  (a) if a submitter or advice agency started the appeal in the P&E
               (3) The appeal period is –
                                                                                                      Court – 2 business days after the appeal has started; or
                   (a) for an appeal by a building advisory agency – 10 business
                                                                                                  (b) otherwise – 10 business days after the appeal is started.
                       days after a decision notice for the decision is given to the
                       agency; or                                                             (5) A notice of appeal given to a person who may elect to be a co-
                                                                                                  respondent must state the effect of subsection (6).
                   (b) for an appeal against a deemed refusal – at any time after the
                       deemed refusal happens; or                                             (6) A person elects to be a co-respondent by filing a notice of election,
                                                                                                  in the approved form, within 10 business days after the notice of
                   (c) for an appeal against a decision of the Minister, under chapter
                                                                                                  appeal is given to the person.
                       7, part 4, to register premises or to renew the registration of
                       premises – 20 business days after a notice us published under          231 Other appeals
                       section 269(3)(a) or (4); or
                                                                                              (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
                   (d) for an appeal against an infrastructure charges notice – 20                the Supreme Court decides a decision or other matter under this
                       business days after the infrastructure charges notice is given             Act is affected by jurisdictional error, the decision or matter is non-
                       to the person; or                                                          appealable.
                   (e) for an appeal about a deemed approval of a development                 (2) The Judicial Review Act 1991, part 5 applies to the decision or
                       application for which a decision notice has not been given –               matter to the extent it is affected by jurisdictional error.
                       30 business days after the applicant gives the deemed
                                                                                              (3) A person who, but for subsection (1) could have made an
                       approval notice to the assessment manager; or
                                                                                                  application under the Judicial Review Act 1991 in relation to the
                   (f)   for any other appeal – 20 business days after a notice of the            decision or matter, may apply under part 4 of that Act for a
                         decision for the matter, including an enforcement notice, is             statement of reasons in relation to the decision or matter.
                         given to the person.
                                                                                              (4) In this section –
               Note –                                                                             decision includes-
                   See the P&E Court Act for the court’s power to extend the appeal
                                                                                                  (a) conduct engaged in for the purpose of making a decision; and
                   period.
                                                                                                  (b) other conduct that relates to the making of a decision; and
               (4) Each respondent and co-respondent for an appeal may be heard
                   in the appeal.                                                                 (c) the making of a decision or failure to make a decision; and
               (5) If an appeal is only about a referral agency’s response, the                   (d) a purported decision; and
                   assessment manager may apply to the tribunal or P&E Court to
                                                                                                  (e) a deemed refusal.
                   withdraw from the appeal.
                                                                                                  non-appealable, for a decision or matter, means the decision or
               (6) To remove any doubt. It is declared that an appeal against an
                                                                                                  matter-
                   infrastructure charges notice must not be about-
                                                                                                  (a) is final and conclusive; and
                   (a) the adopted charge itself; or
                                                                                                  (b) may not be challenged, appealed against, reviewed, quashed,
                   (b) for a decision about an offset or refund-
                                                                                                      set aside or called into question in any other way under the
                         (i)   the establishment cost of trunk infrastructure identified in           Judicial Review Act 1991 or otherwise, whether by the
                               a LGIP; or                                                             Supreme Court, another court, a tribunal or another entity; and
                         (ii) the cost of infrastructure decided using the method                 (c) is not subject to any declaratory, injunctive or other order of
                              included in the local government’s charges resolution.                  the Supreme Court, another court, a tribunal or another entity
                                                                                                      on any ground.
               230 Notice of appeal
                                                                                              232 Rules of the P&E Court
               (1) An appellant starts an appeal by lodging, with the registrar of the
                   tribunal or P&E Court, a notice of appeal that-                            (1) A person who is appealing to the P&E Court must comply with the
                                                                                                  rules of the court that apply to the appeal.
                   (a) is in the approved form; and
                   (b) succinctly states the grounds of the appeal.                           (2) However, the P&E Court may hear and decide an appeal even if
                                                                                                  the person has not complied with the rules of the P&E Court
               (2) The notice of appeal must be accompanied by the required fee.




                                                                                                                                                    Page 6 of 6
Document Set ID: 23064252
Version: 7, Version Date: 26/06/2024

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.