Original source · versioned page text
OPW20.0191 NC IR response
Attached to the e-mail OPW20/0191 - Response to Information Request - 707 Kinmond Creek Rd.
Figure 3 – The channel to Kinmond Creek.
Works have also commenced on stabilising the main drainage channel. These
works are incomplete at this stage but the progress is demonstrated in Figure 4
below.
Page 5 of 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.