Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

G Engineering Report And Plans · 132007.2398

Attached to the e-mail 132007.2398.02 Request to change existing approval (2 of 3) Engineering report & plans, Stormwater Plan.

of 56

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (10.6 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                                                                              CALIBRE CONSULTING




Table 14-59 Roads and Drainage
 14.147 Road and drainage design and construction.
 Specific Outcomes                                            Probable Solutions                                          Proposed Measures
                                                              (if code assessable)
 O7                                                           S7.1
 Roads and pedestrian and cycle paths are planned and         Road planning and design supports the hierarchy and         Calibre Consulting has provided a Traffic Impact Assessment
 designed to support the hierarchy and functional aspects     functional aspects identified in Sections 2 and 3 of PSP5   Report No. B14158ER01 (December 2014), please refer for
 identified in Sections 2 and 3 of PSP5 Engineering           Engineering Design Standards – Roads, Drainage and          details.
 Design Standards – Roads, Drainage and Earthworks            Earthworks;                                                 All roads will be designed in accordance with relevant Council
 and to ensure that:                                          AND                                                         policies and engineering guidelines.
 (a) design and alignment of the roads, intersections
      and all associated works:
      i.   provides a safe environment for all users;
      ii.  is adequate for the design speed environment;
      iii. is adequate for predicted traffic volumes; and
      iv. maintains the safe and efficient functioning of
           the road network without the use of traffic
           signals;
      v.   is compatible with existing roads;
      vi. is easily maintained by Council equipment;
           and
      vii. where appropriate, has the ability to
           accommodate public transport services.
 (b) Road pavement surfaces:
      i.   are durable enough to carry estimated wheel
           loads of travelling and parked vehicles;
      ii.  provide for the safe passage of vehicles;
           pedestrians, cyclist and discharge of
           stormwater       runoff   from      contributing




B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                                                                           CIVIL ENGINEERING REPORT | 24

Used in these records

About this file

File size
10.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

G ENGINEERING REPORT AND PLANS.pdf · 10.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.